TEST AREA FOR TYPE OF TEST EQUIPMENT TEST TEST DURATION ABOVE GROUND
LEVEL ALL CONNECTION PRESSURE SOAP PRESSURE FINDING
TEST MEDIUM DURATION D1 D2 D3 D4
PIPING GAUGE SOLUTION KPA (PSI)
Nitrogen - - - - - -
Bath 2 Pneumatic / leak 173 (25)
60 Minutes 15mins - 25psi 30mins - 25psi 45mins - 25psi 60mins - 25psi
Air √ √ √ No leakage, no pressure dropped.
24 Hours 1st 12hrs - 25psi 2nd 12hrs - 25psi
Lower Ground
Nitrogen - - - - - -
BBQ Area Pneumatic / leak 173 (25)
60 Minutes 15mins - 25psi 30mins - 25psi 45mins - 25psi 60mins - 25psi
Air √ √ √ No leakage, no pressure dropped.
24 Hours 1st 12hrs - 25psi 2nd 12hrs - 25psi
Nitrogen - - - - - -
Powder Room Pneumatic / leak 173 (25)
60 Minutes 15mins - 25psi 30mins - 25psi 45mins - 25psi 60mins - 25psi
Air √ √ √ No leakage, no pressure dropped.
24 Hours 1st 12hrs - 25psi 2nd 12hrs - 25psi
Nitrogen - - - - - -
Kitchen Pneumatic / leak 173 (25)
60 Minutes 15mins - 25psi 30mins - 25psi 15mins - 25psi 30mins - 25psi Pressure drop was found at basin area, suspicious caused by unintentional removal or loosen
Air √ √ √
24 Hours 1st 12hrs - 25psi 1st 12hrs - 25psi pressure gauge. Pressure remain normal upon pressurized for the next 24 hours.
Nitrogen - - - - - -
Laundry Area Pneumatic / leak 173 (25)
Ground Floor 60 Minutes 15mins - 25psi 30mins - 25psi 45mins - 25psi 60mins - 25psi
Air √ √ √ No leakage, no pressure dropped.
24 Hours 1st 12hrs - 25psi 2nd 12hrs - 25psi
Nitrogen - - - - - -
Bath 6 (Maid) Pneumatic / leak 173 (25)
60 Minutes 15mins - 25psi 30mins - 25psi 45mins - 25psi 60mins - 25psi No leakage, no pressure dropped.
Air √ √ √
24 Hours 1st 12hrs - 25psi 2nd 12hrs - 25psi Remark: up to connection valve above ceiling.
Nitrogen - - - - - -
Bath 5 Pneumatic / leak 173 (25)
60 Minutes 15mins - 25psi 30mins - 25psi 45mins - 25psi 60mins - 25psi No leakage, no pressure dropped.
Air √ √ √
24 Hours 1st 12hrs - 25psi 2nd 12hrs - 25psi Remark: up to connection valve above ceiling.
Nitrogen - - - - - -
Master Bath Pneumatic / leak 173 (25)
60 Minutes 15mins - 25psi 30mins - 25psi 45mins - 25psi 60mins - 25psi
Air √ √ √ No leakage, no pressure dropped.
24 Hours 1st 12hrs - 25psi 2nd 12hrs - 25psi
Nitrogen - - - - - -
Bath 3
Pneumatic / leak 173 (25)
(Mother In Law) 60 Minutes 15mins - 25psi 30mins - 25psi 45mins - 25psi 60mins - 25psi
Air √ √ √ No leakage, no pressure dropped.
24 Hours 1st 12hrs - 25psi 2nd 12hrs - 25psi
Level 1
Nitrogen - - - - - -
Bath 4 (Children) Pneumatic / leak 173 (25)
60 Minutes 15mins - 25psi 30mins - 25psi 45mins - 25psi 60mins - 25psi
Air √ √ √ No leakage, no pressure dropped.
24 Hours 1st 12hrs - 25psi 2nd 12hrs - 25psi
Nitrogen - - - - - -
Lift Area Pneumatic / leak 173 (25)
60 Minutes 15mins - 25psi 30mins - 25psi 45mins - 25psi 60mins - 25psi
Air √ √ √ No leakage, no pressure dropped.
24 Hours 1st 12hrs - 25psi 2nd 12hrs - 25psi
1/5
Appendix (Photo)
Attn VCS Ref WPT/WLB/PJ/20230106
2/5
Appendix (Photo)
Attn VCS Ref WPT/WLB/PJ/20230106
Level 1 Master Bath Level 1 Bath 3 Level 1 Bath 4 Level 1 Lift Area
3/5
Appendix (Photo)
Attn VCS Ref WPT/WLB/PJ/20230106
Ground Floor Kitchen Ground Floor Powder Room Ground Floor Bath 6 Ground Floor Laundry Ground Floor Bath 5
4/5
Appendix (Photo)
Attn VCS Ref WPT/WLB/PJ/20230106
Prepared by,
Dream Team Ventures Sdn Bhd
………………………………
Demi Lee
5/5