Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROJECT : NCCC MALL MA-A

HANDOVER LOCATION : McArthur Highway Cor. MA-A & Matina Davao City
DATE : HANDOVER NO. :
(CCFG TO FAES)

This is to certify that China Construction Front General Dev't Corp. (CCFG) is handing over the area stated below to FAES.

AREA :

Arren B. Buenafe 3/17/2022


CCFG QC Engr. Date

This is to certify that we have fully inspected/surveyed the above-mentioned area being handed over to us and is now ready

(except the items listed below) to receive our work.

Faes Date

ADDITIONAL NOTES / REMARKS :

NOTED BY :

Engr. Julius Ceasar Tuazon


ACPAMA MEPF Engr. Date

DISTRIBUTION : Subcon ACPAMA FAES

You might also like