Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

M Azahar EM 08/21/19

Internal Dwg. No: 706174-30GCOT-LP-PID-007 CLASS: 1


841

594
49-V -86000 (NOTE 1, 3)
FOAM CONCENTRATE DRUM 1
FIXED FOAM SYSTEM
CAPACITY: 13.0 m3
FOAM CONCENTRATE: FLUORO PROTEIN

SHELL FILL VENT BLADDER VENT

49-V-86000
NO NO

1
SET@
FSV
16 barg PSV
3"x1" 3"x1" -
-
1 VENDOR CONTRACTOR
2"x1"

LG
-

FOAM BLADDER TANK


Capacity: 13 m3

SIGHT GLASS 0.5"

LC
1"
1"

LC
1"
1" BLADDER
TANK DRAIN/FILL
SHELLDRAIN
1"-FF-83017-018011GX Tr
1
FV
PCV -
TO OPEN DRAIN

-
GF-GCOT-B-14-4028 578

VT
0.25" HYDRAULIC
FF-003

HC
CONTROL
VALVE

MV MV PG
-
- -
PG
WATER FOAM CONC.

LO
INLET - CONTROL
VALVE VALVE
True
1 VT PG
SP 001

0.25"
0.25"
UG AG
7- FF-001 -
017011GY 018011GX 50
TO CRUDE OIL STORAGE
FROM FIRE WATER NETWORK 8"x6" 6"x10" FOAM SYSTEM
8"-FW-81015-017011GY Tr 6" 6" 6" 10"-FF-83001-018011GX
496 GF-GCOT-X-14-8506 512 GF-GCOT-X-14-8502
3/4" NC FLOW Tr
GA-FW-064 FOAM

0.5"
0.5"
GA-FW-061

LC
LC
GA-FW-070 1 PROPORTIONER VT
1"-FF-83018-018011GX FF-002
SKID DRIP PAN
8"-FW-81123-018011GX

TO OPEN DRAIN
GF-GCOT-B-14-4028 577
018011GX
AG

FROM FIRE WATER NETWORK


8"-FW-81016-017011GY
497 GF-GCOT-X-14-8506
UG

HOLDS:
1. DELETED.
1
PROJECT TITLE
NOTES: PCIHBV COMMENT CONTRACT NO. PCIHBV/PD&T/1570
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION
1. DETAILS SHOWN INSIDE PACKAGE ARE MINIMUM AND SHALL BE UPDATED BASED ON FINAL VENDOR
INFORMATION. FOAM PACKAGE SHALL BE UL/FM LISTED. APPROVED/REVIEWED
JOB NO. 706174 AND COMMISSIONING(EPCC) FOR OIL TRAIN 3, 4 AND 5
2. REFER TO FOAM SKID DATE SHEET GF-GCOT-X-DS-1507 FOR FURTHER DETAILS. DRAWING TITLE
3. FIXED FOAM SYSTEM INCLUDES FOAM CONCENTRATE BLADDER TANK, FOAM PROPORTIONER AND FOAM DRAWN BY JBZ
POURERS FOR STORAGE TANKS. SYSTEM CAPACITY WILL INCLUDE MAIN RESERVE FOR ONE FIRE EVENT.
APPROVED WITH COMMENT PIPING AND INSTRUMENTATION DIAGRAM
4. FOAM TANK SHALL BE KEPT UNDER SHED. DATE 13.02.19 TRAIN 3, 4, 5 (GIFT)
5. ALL THE DISTRIBUTION PIPING FOR FOAM SYSTEM SHALL BE ARRANGE TO BE FREE DRAINED SO THAT RESUBMIT FOR APPROVAL
N/A
FIXED FOAM SYSTEM
THE FOAM WATER SOLUTION CAN BE FLUSHED OUT AFTER USE. THE DRAIN VALVES TO BE PROVIDED SCALE
AT THE LOWEST POINTS FOR FOAM PIPING.
RESUBMIT FOR REVIEW CHECKED RG/AB
6. FOAM CONCENTRATE SHALL BE AQUEOUS FILM FORMING (AFFF) TYPE.
CLIENT CONTRACTOR
7. FOAM SYSTEM SHALL BE ACTIVATED MANUALLY ONCE THE FIRE HAS BEEN VISUALLY OBSERVED ON
NAME SIGNATURE TITLE DATE 13.02.19
TANK AREA THROUGH CCTV. DATE
8. FIRE WATER SUPPLIED FROM TWO SECTIONS OF RING MAN.
9. PSV DISCHARGE SHALL BE DIRECTED HORIZONTALLY TOWARD OPEN END OF SKID PACKAGE, NOT TOWARD The signing, countersigning or other endorsements 1 REISSUED FOR CONSTRUCTION 20.08.19 KD RG/AB JY APPROVED JY
of any drawings and documentation by PCIHBV'S
ROOF OR FLOOR OR INTO WORKING SERVICE AREA. NO DRAIN SHALL BE PROVIDED BEYOND DISCHARGE representatives, agents or employees shall neither
OF PSV WHICH MIGHT COMPROMISE ITS FUNCTION. be construed as implying the responsibility for the 0 APPROVED FOR CONSTRUCTION 13.02.19 KD RG/AB JY DATE 13.02.19
correctness and accuracy of such documents nor THE ORIGINAL AND ALL COPIES OF THIS DRAWING NO SHEET REV.
relieving the CONTRACTOR of its obligations to BY CHKD APPD APPD DRAWING TOGETHER WITH THE
review all information, data, drawings, and DRAWING NO. REFERENCE DRAWINGS REV DESCRIPTIONS DATE CONTRACTOR COPYRIGHT THEREOF ARE THE THE SOLE GF-GCOT-X-14-8507 01/01 1
specifications provided by PCIHBV. CONTRACTOR CLIENT PROPERTY OF PCIHBV

CAD FILE: GF-GCOT-X-14-8507.dwg

A1

You might also like