PRODUCTION FOR MONTH OF DECEMBER 2022

Water Sources Rate of Discharge (LPS) Power/Kwh used Production (cu.m.)


SPRING
Cabigaan 1.5LPS Gravity 8,035.20
Patong 20LPS Gravity 13,392.00
Kadaop 30LPS 15600 55,710.00
Togawe 1-2LPS 1607 642.48
77,779.68
DEEP WELL
Ariman 0 -
Bagacay-contod 1616 716.21
Beriran 1578 630.88
Cabigaan 901 415.72
Cabiguhan 984.02 404.83
Carriedo 1070 427.79
Cogon 2241 709.28
Jupi 707.9 283.02
Nazareno 1268 506.95
Paco1 1 to 2 LPS 1187 474.56
Paco2 1273 696.84
Patag 933 469.49
Payawin 1759 703.25
Rizal-Bongsaran 1021 412.79
Sta Ana-apgo 1666 666.07
Sta Ana - Banyo 876 350.22
Tiris1 - taas 1150 585.12
Tiris2 - baba 1218 486.96
Villareal 1468 738.70
9,678.66
PURCHASED WATER AT CASIGURAN WD FROM OROK SPRING
CWD 3" pipe 10LPS Gravity 22,932.00
CWD 4" pipe 10LPS Gravity 9,403.00
CWD 8" pipe 30LPS Gravity 30,386.00
62,721.00
Summary
Total Gravity Production 21,427.20
Total Pumping Production 66,031.14
Total Purchased Water 62,721.00
Total Production 150,179.34
Total billed for the month 103,856.00
Non Revenue Water % 31%