Professional Documents
Culture Documents
Cased Hole Logging
Cased Hole Logging
&
PRODUCTION LOG
EVALUATION
1
Technologies applied in cased hole
✓ Gamma ray (depth correlation and lithology
identification).
✓ Acoustic logging (sonic logs and cement bond integrity).
✓ Neutron logging (lithology and fluid type determination).
✓ Pulsed neutron capture and spectral logging (fluid
saturations).
✓ Production logging (productivity and flow profile).
✓ Other cased services that are completion oriented:
• Perforating, plug and packer setting.
• Tracers (water injection monitoring).
• Gravel pack fill (Sand control).
• Corrosion monitoring. 2
Gamma Ray
&
Casing Collar Locator
(CCL)
3
✓ The magnetic lines of flux are
5
Cement Evaluation
6
CEMENT PROBLEMS
7
CBL-VDL PRINCIPLE
8
VDL INTERPRETATION 9
• The CBL trace primarily provides information on the integrity of the
casing to cement bond quality.
10
11
Gas microannulus
Casing weld
Mud
channel
Perfs
Well
centered
casing
Eccentered
Washout casing
13
Casing wear can affect cement image
Drill pipe wear creates false “channel”
False
Wear groove channel
QC Casing Cement
14
Zone of Poor Cement Bond
15
Isolation Scanner
19
20
21
Neutron Logs
22
Neutron cased hole uses
✓ For modern tools the neutron tool response indicates a
similar neutron porosity to that measured when the
same tool is run in open hole.
✓ Differences in response will be caused by washouts and
the integrity of the cement bond.
Main uses:
✓ Porosity information where open hole data is missing.
✓ Formation boundaries.
✓ Gas detection.
23
Three Nuclear Interactions
1. Elastic Scattering
The Neutron bounces off the nucleus of an
element in the formation
24
Three Nuclear Interactions
2. In-elastic Scattering
The Neutron bounces off the nucleus of an
element in the formation.
3.Absorption
The Neutron enters the nucleus of an
element in the formation
27
28
CASED HOLE RESISTIVITY
29
Measurement Step – A/C current applied
Calibration Step
Majority flows up pipe to surface
– Resistivity of the casing is measured
Some flows down pipe & out through formation
30
Production Logging Tool
(PLT)
31
32
33
34
35