Professional Documents
Culture Documents
Form Attachment General Worker Permitt & Work Permit PT - UAI CSMS
Form Attachment General Worker Permitt & Work Permit PT - UAI CSMS
Form Attachment General Worker Permitt & Work Permit PT - UAI CSMS
Hot work in paint booth or paint mixing room Painting works at places where ventilation facilities are not applied
Hot work at 4 meters or more heights (e.g. truss structure) Painting works at heights (3meters or more)
Hot work within 10 meters from entrance or openings of paint booth
Painting works within 5 meters from hot work places
and paint mixing room Painting
Hot work for facilities and pipes that are connected to paint booth and
Painting works in confined spaces or oil tanks
paint mixing room
Painting works in underground PIT which is 2 meters or more
Hot work for sandwich pannel or roof of urethane foam heights (including anti-rust work in case that organic solvent is
included)
Cleaning or reparing works for facilities/pipes for 1st grade
Hot Work Hot work in laboratory handling hazardous materials petroleum prodcuts (gasoline, solvent, thinner)
Hazard-
Hot work for dismantling or maintaining dust collector, air Hot works for dismantling or mantaining facilities/pipes for 2nd
ous
supply/exhaust ducts grade petroleum products (diesel, kerosene)
Material
Hot work for dismantling or maintaining pipes for flammable materials Painting works or flammable handling works in confined spaces
(paint, thinner, solvent, LNG, etc.) (underground PIT, inside of tank)
Works for installing/dismantling scaffolidng 3 floors or more /
Hot work in confined spaces (underground pit, inside of tank, etc.)
Works on scaffolding 3 floors or more
Hot work to install, dismantle or repair cooling tower Works on cranes in plants (e.g. girder, crab, passage ways, etc.)
Hot work near hazardous materials handling location and oil tank, Working at Electrical work, hot work, painting, cleaning works on 6 meters or
inside/above anti-rust booth Height more building truss, ceiling of structures, etc.
Works using a pile driver equipment Except for confiend spaces described in legal requirement,
Construc-
1. Hot works at the place where ventilation is not enough
tion
(in case only that there is no risk of suffocation)
Equip-
2. Locations where there are high possibilities to casue
ment Lifting heavy materials suing hydro-crane (100 tons or less)
hazardous gases during painting or other works.
Paintings at opened areas where there is no hot work (in case that Loading/unloading dismantled steel structures, equiment (only low
working platforms are not used) risk & hazard works are not applied to Lv.B)
Transpor-
Painting Loading/unloading/transportaion works for containers storing or
tation
Painting work using water paint using hazardous materials (3rd or more grade of petroleums
product
Hazar-
Other works are not described in this standard and there is no risk
dous Install new pipes for hazardous materials at places less than 2 meters
& hazard to cause any incident
Material
Others
Working Works at less than 2 meters of heights on working platforms (except
at for hot work) Simple equipment commissioning
Height Other working at heights not applied to Lv.A or Lv.B