HAZA

Junction Top
Sub Loaction
House
SL No Hazardous Event

1- Metal part & Spillage material may fall from


top due to rusted structure & spillage material on
bracess of junction .

Between J2C1 & J2C2


1
Tailend [Tunnel]

2.Working person Cleaning Tools (Long Handel


Tolls) may come to contact with electrical cable ,
Light & convert into electrocution & Fire
Incident .

J2 Junction
J2 Junction

J2C1 & C2 JUNCTION


headend area.

1. Fall of unwanted loose material from top of


structure.

2. Electric shock hazard due to contact of long


house keeping tools with overhead electrical
4 cables during cleaning activity.
J3BC1 1- Metal part & Spillage material may fall from
JUNCTION top due to rusted structure & spillage material on
HOUSE bracess of junction .

1st floor j3bc1 tailend

2.Working person Cleaning Tools (Long Handel


Tolls) may come to contact with electrical cable ,
Light & convert into electrocution & Fire
Incident .

7
1- Metal part & Spillage material may fall from
[J3BC1] Gate change
top due to rusted structure & spillage material on
platform bracess of junction .
2.Working person Cleaning Tools (Long Handel
Tolls) may come to contact with electrical cable ,
Light & convert into electrocution & Fire
Incident .
1st floor j4ac1 junction

1. Fall of unwanted loose material from top of


8 J4AC1 structure.
JUNCTION
HOUSE
J4AC1
JUNCTION
HOUSE

Top floor j4ac1 headend.

1. Fall of unwanted loose material from top of


9 structure.
HAZARD WITH MITIGATION - JUNCTION HOUSE W
Top Bottom
Mitigation Hazardous Event Mitigation

1.Ensure that all area to be


scrap material free.
2-Ensure & take proper
illumination reading by lux
1.Person may fall due to meter as per standard before
1.First start inspection of top bracess & obstcles(Uneven starting job.
staructure befor start Job. surface ,Earth strip,Projected 3- Ensure that all peron make 3
2.Ensure 100 % compliance of cleaning of Ange & scrap materials ) at pont contct at staircase.
top surface before start the Job. walk way

2-Water logging at ground


floor of tunnel person may
slip/trip/fall . 1- Ensure that all peron make 3
pont contct at staircase.
2.. Ensure that de watering
1. Before start the job please ensure pump is at working condition &
proper dressing of cable . all water drained properly from
2.If necked cable found then do not start tunnel area before starting of
the job until compliace of same. job.

3.Person may Slip/Trip due 1. Use gumboot &ensure


to Stone , Slurry & Spillage proper house keeping before
material at walk way starting job.
1- Ensure that all peron make 3
pont contct at staircase.
2.Ensure that all area to be
1.Person may fall due to scrap material free
1.First start inspection of top bracess & obstcles(Uneven 3-Ensure & take proper
staructure befor start Job. surface ,Earth strip,Projected illumination reading by lux
2.Ensure 100 % compliance of cleaning of Ange & scrap materials ) at meter as per standard before
top surface before start the Job. junction house floor starting job.

1- Do proper inspection of
2- Person may fall from chequered plate or damaged
1. Before start the job please ensure height due to damaged welding of that location before
proper dressing & lay out of cables . chequered plate or rusted starting of job .
2.If necked cable found then do structure of junction 2-Do not start the job until
not start the job until compliace of same. staircase & floor area. compliace of same.
1- Ensure that all peron make 3
pont contct at staircase.
1.Ensure that all area to be
scrap material free.
1.Person may fall due to 2-Ensure & take proper
1.First start inspection of top bracess & obstcles(Uneven illumination reading by lux
staructure befor start Job. surface ,Earth strip,Projected meter as per standard before
2.Ensure 100 % compliance of cleaning of Ange & scrap materials ) at starting job.
top surface before start the Job. walk way

1- Ensure that all peron make 3


1. Before start the job please ensure pont contct at staircase.
proper dressing of cable . 2.Person may Slip/Trip due 2. Use gumboot &ensure
2.If necked cable found then do not start to Stone , Slurry & Spillage proper house keeping before
the job until compliace of same. material at walk way access starting job.

1-Ensure that all platform


opening are closed before
3- Fall of object or loose starting of job.
material from height from 2- Ensure that all platfom toe
gap /opening at junction guard installed before starting
house platform. job.
1.Ensure that all area to be
scrap material free.
2-Ensure & take proper
illumination reading by lux
1.Person may fall due to meter as per standard before
1.First start inspection of top bracess & obstcles(Uneven starting job.
staructure befor start Job. surface ,Earth strip,Projected 3- Ensure that all peron make 3
2.Ensure 100 % compliance of cleaning of Ange & scrap materials ) at pont contct at staircase.
top surface before start the Job. walk way
2-Water logging at ground
floor of tunnel person may
slip/trip/fall .

1- Ensure that all peron make 3


pont contct at staircase.
2.. Ensure that de watering
1. Before start the job please ensure pump is at working condition &
proper dressing of cable . all water drained properly from
2.If necked cable found then do not start tunnel area before starting of
the job until compliace of same. job.

3.Person may Slip/Trip due 1. Use gumboot &ensure


to Stone , Slurry & Spillage proper house keeping before
material at walk way starting job.
1- Ensure that all peron make 3
pont contct at staircase.
2.Ensure that all area to be
1.Person may fall due to scrap material free
1.First start inspection of top bracess & obstcles(Uneven 3-Ensure & take proper
staructure befor start Job. surface ,Earth strip,Projected illumination reading by lux
2.Ensure 100 % compliance of cleaning of Ange & scrap materials ) at meter as per standard before
top surface before start the Job. junction house floor starting job.
1- Ensure that all peron make 3
pont contct at staircase.
2.Ensure that all area to be
1.Person may fall due to scrap material free
1.First start inspection of top bracess & obstcles(Uneven 3-Ensure & take proper
staructure befor start Job. surface ,Earth strip,Projected illumination reading by lux
2.Ensure 100 % compliance of cleaning of Ange & scrap materials ) at meter as per standard before
top surface before start the Job. junction house floor starting job.
ION HOUSE WISE
North South
Hazard Mitigation Hazard

1- Take PTW , positive


isolation & follow LOTO
procedure before starting
of job.
2-Only trained &
1- Very narrow access at authorised persons are
miidle walkway of j2c1 & allowed to work .
c2 conveyor middle 3-Ensure & apply
walkway due to lack of emergency switch & pull 1-[Rotating tail pully of
space & structure it may cord before staring of job. j2c1& c2 onveyor belt]
lead to entaglement 4- Ensure that all guards persons working their may
hazard with rotating parts. are in its proper position . get in contact with
rotating parts
[entaglement hazard.

1- Maintain sae distance


from sarp objects edges.
2-Remove sharp object
2-Cut injury by sharp immidetly before starting
object or side edges job.

1- Ensure all de dusting


3- Flying dust hazard from system & water spinkler
conveyor gallery area . are at working condition.
1- Take PTW , positive 1-[Rotating head pully,
isolation & follow LOTO bend pully, snub pully &
procedure before starting pressure pully of j2c1& c2
1-[Rotating equipments of job. onveyor belt] persons
like HT motor, gear 2- Ensure that all guards at working their may get in
coupling & ZSS] Persons its proper position & contact with rotating parts
working near by may get covered from all 360 during housekeeping
with contact with rotating degree to avoid man activity[entaglement
equipments. machine interface. hazard.
1- Take PTW , positive
isolation & follow LOTO
procedure before starting
of job.
2-Only trained &
1- Very narrow access at authorised persons are
miidle walkway of j3bc1 allowed to work .
conveyor middle walkway 3-Ensure & apply
due to lack of space & emergency switch & pull 1-[Rotating tail pully of
structure it may lead to cord before staring of job. j3bc1 onveyor belt]
entaglement hazard with 4- Ensure that all guards persons working their may
rotating parts. are in its proper position . get in contact with
rotating parts
[entaglement hazard.

1- Maintain sae distance


from sarp objects edges.
2-Remove sharp object
2-Cut injury by sharp immidetly before starting
object or side edges job.

1- Ensure all de dusting


3- Flying dust hazard from system & water spinkler
conveyor gallery area . are at working condition.
1- Take PTW , positive
isolation & follow LOTO
procedure before starting
of job.
2-Only trained &
1- Very narrow access at authorised persons are
miidle walkway of j3bc1 allowed to work .
conveyor middle walkway 3-Ensure & apply
due to lack of space & emergency switch & pull 1-[Rotating tail pully of
structure it may lead to cord before staring of job. j2c1& c2 onveyor belt]
entaglement hazard with 4- Ensure that all guards persons working their may
rotating parts. are in its proper position . get in contact with
rotating parts
[entaglement hazard.
1- Maintain sae distance
from sarp objects edges.
2-Remove sharp object
2-Cut injury by sharp immidetly before starting
object or side edges job.

1- Ensure all de dusting


3- Flying dust hazard from system & water spinkler
conveyor gallery area . are at working condition.
1- Take PTW , positive 1-[Rotating head pully,
isolation & follow LOTO bend pully, snub pully &
procedure before starting pressure pully of J4AC1
1-[Rotating equipments of job. onveyor belt] persons
like HT motor, gear 2- Ensure that all guards at working their may get in
coupling & ZSS] Persons its proper position & contact with rotating parts
working near by may get covered from all 360 during housekeeping
with contact with rotating degree to avoid man activity[entaglement
equipments. machine interface. hazard.
1-[Rotating head pully,
1- Take PTW , positive bend pully, snub pully &
isolation & follow LOTO pressure pully of
procedure before starting J4AC1onveyor belt]
1-[Rotating equipments of job. persons working their may
like HT motor, gear 2- Ensure that all guards at get in contact with
coupling & ZSS] Persons its proper position & rotating parts during
working near by may get covered from all 360 housekeeping
with contact with rotating degree to avoid man activity[entaglement
equipments. machine interface. hazard.
AREA
South East
Mitigation Hazard Mitigation

1- Follow PTW , positive


isolation & LOTO
procedure before starting
1- Follow PTW , positive of job.
isolation & LOTO 2-Only trained &
procedure before starting authorised persons are
of job. allowed to work .
2-Only trained & 3-Ensure & apply
authorised persons are emergency switch & pull
allowed to work . cord before staring of job.
3-Ensure & apply 4- Ensure that all guards
emergency switch & pull are in its proper position
cord before staring of job. 5-Ensure that all persons
4- Ensure that all guards are wearing mandatory
are in its proper position. 1-[ Roating carring & PPE.
5- Ensure that all persons impact idlers] persons 6-Ensure that workers
are wearing mandatory working near by my get working near by are not
PPE. entaglement with rotating wearing any loose cloth.
6-Ensure that workers parts. 7- Ensure all persons are
working near by are not 2- Flying dust hazard due wearing mandatory PPE.
wearing any loose cloth . to running conveyor belt.
1- Take PTW , positive
isolation & follow LOTO
procedure before starting
of job.
2-Only trained &
authorised persons are 1. Before start the job
allowed to work . please ensure proper
3-Ensure & apply 1-[ Electrical cable try] dressing of cable .
emergency switch & pull persons working their tools 2.If necked cable
cord before staring of job. may get in contact with found then do not start the
4- Ensure that all guards wall mounted electrical job until compliace of
are in its proper position . cable try. same.
1- Follow PTW , positive
isolation & LOTO
procedure before starting
1- Follow PTW , positive of job.
isolation & LOTO 2-Only trained &
procedure before starting authorised persons are
of job. allowed to work .
2-Only trained & 3-Ensure & apply
authorised persons are emergency switch & pull
allowed to work . cord before staring of job.
3-Ensure & apply 4- Ensure that all guards
emergency switch & pull are in its proper position
cord before staring of job. 5-Ensure that all persons
4- Ensure that all guards are wearing mandatory
are in its proper position. 1-[ Roating carring & PPE.
5- Ensure that all persons impact idlers] persons 6-Ensure that workers
are wearing mandatory working near by my get working near by are not
PPE. entaglement with rotating wearing any loose cloth.
6-Ensure that workers parts. 7- Ensure all persons are
working near by are not 2- Flying dust hazard due wearing mandatory PPE.
wearing any loose cloth . to running conveyor belt.
1- Follow PTW , positive
isolation & LOTO
procedure before starting
1- Follow PTW , positive of job.
isolation & LOTO 2-Only trained &
procedure before starting authorised persons are
of job. allowed to work .
2-Only trained & 3-Ensure & apply
authorised persons are emergency switch & pull
allowed to work . cord before staring of job.
3-Ensure & apply 4- Ensure that all guards
emergency switch & pull are in its proper position
cord before staring of job. 5-Ensure that all persons
4- Ensure that all guards are wearing mandatory
are in its proper position. 1-[ Roating carring & PPE.
5- Ensure that all persons impact idlers] persons 6-Ensure that workers
are wearing mandatory working near by my get working near by are not
PPE. entaglement with rotating wearing any loose cloth.
6-Ensure that workers parts. 7- Ensure all persons are
working near by are not 2- Flying dust hazard due wearing mandatory PPE.
wearing any loose cloth . to running conveyor belt.
1- Take PTW , positive
isolation & follow LOTO
procedure before starting
of job.
2-Only trained &
authorised persons are 1. Before start the job
allowed to work . please ensure proper
3-Ensure & apply 1-[ Electrical cable try] dressing of cable .
emergency switch & pull persons working their tools 2.If necked cable
cord before staring of job. may get in contact with found then do not start the
4- Ensure that all guards wall mounted electrical job until compliace of
are in its proper position . cable try. same.
1- Take PTW , positive
isolation & follow LOTO
procedure before starting
of job.
2-Only trained &
authorised persons are 1. Before start the job
allowed to work . please ensure proper
3-Ensure & apply 1-[ Electrical cable try] dressing of cable .
emergency switch & pull persons working their tools 2.If necked cable
cord before staring of job. may get in contact with found then do not start the
4- Ensure that all guards wall mounted electrical job until compliace of
are in its proper position . cable try. same.
TRUCK TIPPLER
West
Hazard Mitigation

1. Before start the job


please ensure proper
1-[ Electrical cable try] dressing of cable .
persons working their tools 2.If necked cable
may get in contact with found then do not start the
wall mounted electrical job until compliace of
cable try. same.
1- Follow PTW , positive
isolation & LOTO
procedure before starting
of job.
2-Only trained &
authorised persons are
allowed to work .
1-[ Roating carring & 3-Ensure & apply
impact idlers] persons emergency switch & pull
working near by my get cord before staring of job.
entaglement with rotating 4- Ensure that all guards
parts. are in its proper position .

1- Maintain sae distance


from sarp objects edges.
2-Remove sharp object
2-Cut injury by sharp immidetly before starting
object or side edges job.
1. Before start the job
please ensure proper
1-[ Electrical cable try] dressing of cable .
persons working their tools 2.If necked cable
may get in contact with found then do not start the
wall mounted electrical job until compliace of
cable try. same.

2- Fall from height hazard 1.Ensure & give traing to all


if persons working near person that not to work or
handrail side or open area stand near handrail or
at junction house. open area.
1. Before start the job
please ensure proper
1-[ Electrical cable try] dressing of cable .
persons working their tools 2.If necked cable
may get in contact with found then do not start the
wall mounted electrical job until compliace of
cable try. same.
1- Follow PTW , positive
isolation & LOTO
procedure before starting
of job.
2-Only trained &
authorised persons are
allowed to work .
1-[ Roating carring & 3-Ensure & apply
impact idlers] persons emergency switch & pull
working near by my get cord before staring of job.
entaglement with rotating 4- Ensure that all guards
parts. are in its proper position .
1- Follow PTW , positive
isolation & LOTO
procedure before starting
of job.
2-Only trained &
authorised persons are
allowed to work .
1-[ Roating carring & 3-Ensure & apply
impact idlers] persons emergency switch & pull
working near by my get cord before staring of job.
entaglement with rotating 4- Ensure that all guards
parts. are in its proper position .