Earth Works of the Drainage Basin including Site clearance, Excavation, Disposal Soil,
LS 1 97,605.28 130,996.25
Compacting Soil and all contingencies related to Earth Works
Excavate and carting away of excavated material (off set 1.5m with slope 1:2 existing ground el:
m3 9,471.53 6.50 61,564.95
+13.6)
Disposal Soil m3 9,471.53 2.50 23,678.83
Sand Backfilling and Compaction EL +14.90 m3 6,100.33 16.00 97,605.28 7.50 45,752.48
Construction of the Drainage Basin Base complete and including lean concrete, concrete pouring,
LS 1 79,910.55 26,364.87
curing and all contingencies related to construction
538,208.45
228,601.53
61,564.95 earth
23,678.83 earth
143,357.76 earth
106,275.41
2,784.20 gravel
5,877.75 lean
231.92 lean form
62,622.25 con
3,577.60 form
27,986.59 rebar
2,291.06 curing
904.05 con
167,911.26
41,034.31 con
25,960.22 form
43,697.12 rebar
3,993.88 scaff
1,501.26 curing
13,015.74 con
5,324.80 form
10,321.31 rebar
476.19 curing
819.20 scaff
5,337.45 con
5,190.45 form
6,229.37 rebar
4,814.71 support
195.27 curing
9,791.30
202.00 sus
241.30 sus
366.00 sus
376.00 sus
248.00 sus
3,174.00 sus
5,184.00 sus
25,628.95
25,628.95
ICB No.: MISTI-CW-1, Battambang Water Supply System: Lot 1 – Water BILL 5 - CIVIL WORKS FOR WATER
Treatment Plant and Intake Works TREATMENT PLANT
BF5. 78 Supply and Install lifting beam for travelling trolley hoist for a capacity of nr 1 1
1500kg including all embedding and securing to structure.
Total
RATE Amoun
(USD) t
(USD)
-
Drainage Tank
B L Thk
Drainage Tank
Concrete No. B L Thk
Base 7 19.6 1
17.6 19.6 1
0.5 3.2 0.8
0.5 1.8 0.8
0.5 1.8 0.8
External Wall
left 6.6 18 0.8
0.85 18 0.6
front 6.6 5.4 0.8
0.85 5.4 0.6
6.4 16 0.8
0.85 16 0.6
rear 6.6 5.4 0.8
0.85 5.4 0.6
6.4 16 0.8
0.85 16 0.6
right 6.4 18 0.8
0.85 18 0.6
Grand Tota
Handrail 68.8 m
Ladder A w 400 x 4400 d32 4.4 m
Ladder B w 400 x 4400 d32 2.79 m
Ladder C w 400 x 4400 d32 4 m
Ladder D w 400 x 4400 d32 4.1 m
Grating 666 x 666 0.44 m2
Grating 1100 x 1700 1.87 m2
Form
Volume m3
1.05
73.656 77.34 Lean concrete No. L thk Area m2
49.104 51.56 2 19.8 0.1 3.96
thk 0.05~0.2 2 24.8 0.1 4.96
7 7.35 8.92
Form
Volume m3 1.05 No. L thk Area m2
34,245.39
2,995.81
2,995.81
38.29
1,601.73
1,601.73
1,845.14
1,845.14
868.10
1,182.22
394.39
24,126.37
373.61
1,072.36
373.61
1,072.36
437.70
1,025.36
255.12
668.81
517.32
517.32
708.66
708.66
394.39
448.81
128.69
369.37
128.69
369.37
150.76
353.18
35.15
230.37
124.76
407.06
407.06
332.10
883.73
332.10
883.73
911.43
226.77
541.42
321.95
666.97
333.48
454.65
666.97
333.48
454.65
422.41
128.69
369.37
128.69
369.37
150.76
353.18
35.15
230.37
124.76
407.06
407.06
332.10
883.73
332.10
883.73
911.43
226.77
541.42
321.95
666.97
333.48
454.65
666.97
333.48
454.65
422.41
373.61
994.20
373.61
994.20
1,025.36
437.70
255.12
609.10
362.20
666.97
486.89
666.97
486.89
422.41
37,669.93
143.37
549.47
143.37
549.47
193.04
448.86
287.30
445.42
287.30
445.42
139.88
498.56
139.88
498.56
188.33
280.69
280.69
414.86
937.73
543.88
937.73
543.88
8,897.68
1.10
10.95
10.95
17.16
17.16
184.26
184.26
553.87
961.17
553.87
75.49
75.49
65.64
75.49
75.49
65.64
168.79
168.79
281.32
572.31
572.31
228.92
363.37
16.21
16.21
27.51
27.51
5,370.14
76,064.12
Drainage Basin
Item Ground EL Bottom Excavation Depth width length
Excavation 13.6
m2
50.4 21
46.3 33
46.3 21.7
46.3 21.7
110.7 20.2
42.1 31
42.1 31.7
42.1 31.7
9471.53 0 -3371.2
Volume
1058.4
1527.9
1004.71
1004.71
2236.14
1305.1
1334.57
1334.57
9471.53
-3371.2
-3371.2
6100.33