Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Kabel nya 1x2,5mm (100m) = 480k

1. Kabel NYA merah 1x2.5 mm

2. Kabel NYA biru 1x2.5 mm

3. Kabel NYA hijau-kuning 1x2.5 mm

4. MCB 1 Fasa 4 A = 50k

5. MCB 1 Fasa 10 A = 45k

6. Kabel Aspan NYM 3 x 2,5 mm2 = 30k/m

7. Sakelar Tunggal WEJ 78019 = 12k

8. Stopkontak WEJP 1131-7 = 15k

9. Sakelar Seri inbow= 25k

10. Fitting Plafon V2601BD = 6k/unit

11. Pipa 5/8" PVC = 8k

12. Besi Arde 12 mm2 = 30k

13. T-dos Putih Cabang Tiga = 2k

14. Elbow 2 mm 5/8” PVC = 0,5k

15. Klem No.7 = 0,5k

16. Isolasi 0,13 x 19 mm x 20 m = 10k

17. Box MCB 6 Group = 20k

18. BAUT CACING = 20k

19. Bobokan Stop Kontak = 65k

20. Bobokan Lampu + Saklar = 75k

21. LAMPU LED 13 W =130K


22. LAMPU LED 27W = 100K
23. Mcb 1 fasa 20 a schneider = 83k
24. Mcb 3 fasa 25 a sc = 493k

25. Power Inverter 1000W plus Charger


AKI + UPS WF 1000 W = 1.05 jt
26.

You might also like