Bridge Sressing Forment

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

CLIENT

CONTRACTOR

PROJECT

Date:- Start Time:- Finish Time:-

STRESSING CALCULATION

Girder ID No. of Strands

HT Stand Make Coil No.

Cable No. Heat No.

Cable Type Theoratical Area

Jack Ram Area Actual MOE

Jack Efficiency % Theoratical Area MOE (N/mm2)

Design Elongation as per Actual MOE (N/mm2)


Drawing

Design jack Force (KN) Jack Model No.

(Theoratical area X Theoraticak MOE) X Design Elongation


1) Modified Elongation =
(Actual Area X Actual MOE)

(+5%) Elongation = (-5%) Elongation =

Jack Force (Ton) X 1000


1) Modified Pressure =
Ram Area X Jack Efficiency

= kg/cm2

Maximum(+5%) = kg/cm2 Minimum (-5%) = kg/cm2

SANFIELD INDIA LTD CLIENT / CONTRACTOR

Name & Signature Name & Signature


Stressing Format

1st End 2nd End


Pressure Applied Pump No: Jack No; Gauge No; Pump No: Jack No: Gauge No:
kg/cm2

Reading (mm) Difference (mm) Cummulative (mm) Reading (mm) Difference (mm) Cummulative (mm)

Zero Correction = Zero Correction =

Reading Before Locking = Reading Before Locking =

Reading After Release = Reading After Release =

Slip 1 (End) = Slip 1 (End) =

Net Elongation = Net Elongation =

After 24 Hours Slip = After 24 Hours Slip =

Average Net Elongation =

SANFIELD INDIA LTD CLIENT / CONTRACTOR

Name & Signature Name & Signature