/save button, then the system should show an information window containing
stock info of allmaterials in PR at the plant level
1. Effort Estimation –
Efforts (1 Man
SR.NO. Task Hrs./day)
1 Functional Configuration 0
2 Technical Changes 3
3 Unit Testing 1
4 User Acceptance test 1
5 Documents
FSD 1
Configuration Documents 1
UT Documents 1
User Manual 0
6 TR Movement 1
7 Batch job 0
8 Authorization (Technical Efforts) 1
Total 10
2. Logic at ME51N/ME52N/ME53N
During the Creation of PR in the ME51N system should pick Material No.
(EBAN- MATNR) and plant (EBAN-WERKS) (from internal tables) and pass
these values to MARD-MATNR-WERKS & Pick Stock from MARD-LABST &
MARD-INSME and show this stock as a pop up when the user clicks on
CHECK or SAVE button.
The system should check the above logic for all Line Items in PR (EBAN-BNFPO)
4. Input:
5. BADI –
ME_PROCESS_REQ_CUST