Structural Steel Measurements Report
Structural Steel Measurements Report
Observations:
1- Column #1 – flange loss does not meet criteria for repair, web loss meets criteria for repair .
2- Column #2 - flange loss does not meet criteria for repair, web loss meets criteria for repair .
3- Column #31 – flange loss does not meet criteria for repair, web loss not investigated, no visual corrosion.
4- Platform girder bottom flange loss does not meet criteria for repair.
5-
6-
Remarks /Recommendations:
Obstructions (walls, equipments, concrete column cove bases) prevented measurements of all elements of columns to
be take. Measurements were taken at worst sections, chosen based on visual observation.
Column #1
Column #1 – South Flange,
Track Side
CMU Encasement at
Ejector Room side
of Column #1
CMU Encasement
at Ejector Room
side of Column #1
Column #2 – 145th Street, Lower Level, adjacent to Track C2
Column #2 –
Pump Room Side
Location of Measurement:
Taken 7’ above platform topping. All
corrosion observed at 7’ and above
platform topping elevation.
Column #31 – North Flange, 7’ above
platform level