14drilling Log Spt01 17-18jun22
14drilling Log Spt01 17-18jun22
Project:
COMISIÓN FEDERAL DE ELECTRICIDAD CHARACTERIZATION STUDY FOR MANZANILLO III
MANAGEMENT OF CIVIL ENGINEERING STUDIES Location: MANZANILLO, COLIMA
PLANNING AND LOGISTICS DEPUTY MANAGMENT
DIRECT EXPLORATION DEPARTMENT Area: DIRECT EXPLORATION
Beginning: 15/06/2022 Ending: -
PRELIMINARY
DRILLING LOG
Groundwater Level (m)
Drilling Equipment: INGETROL - EPT 14 Exploratory Well: Standard Penetration Test (SPT) GWL1 0.00 m DATE 15-jun-22 GWL6 DATE
Pump: TRIPLEX Bore No: SPT - 01 GWL2 0.00 m DATE 16-jun-22 GWL7 DATE
Operator: Félix Valerio Martínez x: GWL3 3.50 m DATE 17-jun-22 GWL8 DATE
Supervising Engineer: Juan Carlos Montaño Salinas y: COORDINATES GWL4 3.50 m DATE 18-jun-22 GWL9 DATE
z: GWL5 DATE GWL10 DATE
3.60 m
A 3.30 3.60 ADVANCE WITH TRICONE DRILL BIT BT - 0.30 - - - - -
NW 3
6.60 m
15 6.30 6.75 DARK BROWN FINE SAND BT SPT 0.45 0.37 82 9 18 21 39 30
NW 3
9.65 m
17/06/22 22 9.45 9.90 DARK BROWN FINE SAND BT SPT 0.45 0.34 76 13 22 39 61 46
NW 3
PRELIMINARY
DRILLING LOG
Groundwater Level (m)
Drilling Equipment: INGETROL - EPT 14 Exploratory Well: Standard Penetration Test (SPT) GWL1 0.00 m DATE 15-jun-22 GWL6 DATE
Pump: TRIPLEX Bore No: SPT - 01 GWL2 0.00 m DATE 16-jun-22 GWL7 DATE
Operator: Félix Valerio Martínez x: GWL3 3.50 m DATE 17-jun-22 GWL8 DATE
Supervising Engineer: Juan Carlos Montaño Salinas y: COORDINATES GWL4 3.50 m DATE 18-jun-22 GWL9 DATE
z: GWL5 DATE GWL10 DATE
PERF-SUE-01/A01
PRELIMINARY
COMPLEMENTARY WORK FOR THE GEOTECHNICAL
COMISIÓN FEDERAL DE ELECTRICIDAD Project:
CHARACTERIZATION STUDY FOR MANZANILLO III
MANAGEMENT OF CIVIL ENGINEERING STUDIES
PLANNING AND LOGISTICS DEPUTY MANAGMENT Location: MANZANILLO, COLIMA
DIRECT EXPLORATION DEPARTMENT Bore No: SPT - 01
Beginning: 15/06/2022 Ending: -