_ _ _ _ _ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ __ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ _ _ ___ ___ ___ ___ ____ ____ ___ ___ ___ ___ ___ __
Passionate and professional Engineer with 4 years’ experience in electrical field and a bachelor degree in
Electrical Engineering. Extensive background in plants maintenance, Power plant monitoring, Diesel Generators
maintenance, generators sync module operating, equipment calibration, inventory management, utilities
consumption and team leading. Proficient in technical calculations preparing the utilities consumption log sheets,
daily, weekly and monthly maintenance schedule, BOQ's of new projects and designing of project in AutoCAD.
EXPERIENCE
_ _ _ _ _ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ __ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ _ _ ___ ___ ___ ___ ____ ____ ___ ___ ___ ___ ___ __
MILESTONES
– Prepared power plant layouts, system calculations and installation& Commissioning of LT&HT panels,
Transformers and sync modules. Calculation of cables sizing, Bus bar sizing and transformer sizing to
meet load. Installation of sync panels/sync modules SICES GC-400, MC-400 for synchronization system of
Generators and WAPDA.
– Designed single line Diagram of all biscuits plants and powerhouse. Installed circuit breaker according to
load requirement with the help of SLD. Load management and load balancing and ease in
troubleshooting of fault achieved.
– Supervised and monitored Top-End maintenance Caterpillar Generator 1700kVA and deal with vendors
and managed spare parts and records.
PROFESSIONAL TRAININGS
_ _ _ _ _ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ __ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ _ _ ___ ___ ___ ___ ____ ____ ___ ___ ___ ___ ___ __