9/1/2022 CHP CHP-BC-1 to BC-4 all pull chord Rope Extention has to be done
9/1/2022 WHRB-1B WHRB-1B Hooper Level Switch has to be taken in line
9/1/2022 DMP E-Pit (at WHRB) Level Tx mounting
9/1/2022 CFBC Bed Ash Conveying Pannel-1 Cable and tube removing has to be done
9/1/2022 CFBC CFBC- PA fan-1 Related Instrument PM
9/1/2022 CFBC CFBC ID Fan-1 related Instrument PM
9/1/2022 CFBC CFBC SA Fan-1 Related Instrument PM
9/1/2022 CEMS WHRB CEMS Related Instrument PM
9/1/2022 DMP Acid Unloading Pump Related Instrument PM
9/2/2022 WHRB-1A WHRB-1A Swas pH and Cond. Sensor Calibration
9/2/2022 CFBC CFBC Bed Ash Pannel Cable Glanding
9/2/2022 WHRB-1A WHRB-1A and 1B Both Hydrastep has to be taken in line
9/2/2022 CFBC CFBC ESP O/L Temp element Checking
9/2/2022 CFBC CFBC PA Fan-2 Discharge Pressure Tx checking
9/2/2022 TG-1B Lube Oil System-1B related Instrument PM
9/2/2022 CFBC HP Dosing Pump-2 (CFBC)Related Instrument PM
9/2/2022 CFBC CFBC BFP-2 Related Instrument PM
9/2/2022 CFBC CFBC ID Fan-2 Related Instrument PM
9/2/2022 CFBC CFBC SA Fan-2 Related Instrument PM
9/2/2022 WTP WTP DCS and UPS Related Instrument PM
9/3/2022 WHRB-1A WHRB-1A Swas pH and Cond. Sensor Calibration
9/3/2022 CFBC CFBC ESP O/L Temp element Checking
9/3/2022 WHRB-1B WHRB-1B TRCC Vol and Amp Mapping with electrical
9/3/2022 DMP E-Pit Discharge Pump Auto Operation checking with Electrical
9/3/2022 WHRB BFP-2 Related Instrument PM
9/3/2022 CFBC DCF Area Instrument PM
9/3/2022 WHRB-1A ID Fan-1 Related instrument PM
9/3/2022 CFBC CFBC Oxygen Analyser Pannel Cleanning
9/4/2022 DMP E-Pit Discharge Pump Auto Operation checking with Electrical
9/4/2022 CFBC CFBC Bed Ash Pannel Cable Glanding
9/4/2022 WHRB-1A WHRB-1B ID Fan-1 Related instrument PM
9/4/2022 CFBC Wall Seal Blower-2 Related Instrument PM
9/5/2022 WHRB WHRB Console Pannel Cleanning
9/5/2022 CHP CHP Cable Tray Welding Work has to be done
9/5/2022 IR Dryer has to be checked
9/5/2022 WHRB-1A WHRB-1A ID fan-2 Related instrument PM
9/5/2022 CHP Crusher House and Screen House area Instrument PM
9/5/2022 WHRB-1A WHRB-1A HP dosing Pump Related Instrument PM
9/5/2022 Nagman Master Instrument Operational Training
9/6/2022 CHP CHP Cable Tray Welding Work has to be done
9/6/2022 IR Dryer has to be checked
9/6/2022 TG-1A TG-1A ACC-2 Related instrument PM
9/6/2022 TG-1A TG-1A CST Related Instrument PM
9/6/2022 TG-1A TG-1A Dump Line Instrument PM
9/6/2022 CFBC CFBC Service Air Compressor-2 Related Instrument PM
9/6/2022 WHRB-1B WHRB-1B ID Fan-2 Suction IGV Positioner Feedback Checking
9/6/2022 DMP DMP All pH and Conductivity Sensor Checking and Calibration
9/7/2022 DMP DMP All pH and Conductivity Sensor Checking and Calibration
9/7/2022 CFBC CFBC Ligt Up Activities
9/7/2022 CFBC CFBC PA Fan-2 Suction IGV has to be checked
9/7/2022 CFBC CFBC SA Fan -2 Discharge Gate has to be checked
9/8/2022 IR Dryer has to be checked
9/8/2022 WHRB-1B WHRB-1B TRCC Vol and Amp Mapping with electrical
9/8/2022 DMP DMP All pH and Conductivity Sensor Checking and Calibration(Feed Pump PM)
9/8/2022 TG-1A TG-1A HotWell Related Instrument PM
9/8/2022 CHP BC-4 Loadcell Calibration and PM
9/8/2022 BOP CT Fan-3 Related instrument PM
9/8/2022 CHP BC-4 Related Instrument PM
9/9/2022 CHP BC-4 Loadcell Calibration has to be Done
9/9/2022 WHRB-1B WHRB-1B Service Air Tank ADV Mounting
9/9/2022 CFBC CFBC Attemperator-2 Control Valve Checking
9/9/2022 WHRB-1A WHRB-1A SWAS Pannel Lekages has to be arrest
9/9/2022 TG-1B ACC-2(TG-1B) Related instrument PM
9/9/2022 BOP ACW-3 Related Instrument PM
9/9/2022 CPP DCS &UPS Related Instrument PM
9/9/2022 DMP DMP MB Area Instrument PM
10/9/2022 WHRB-1A WHRB-1A SWAS Pannel Lekages has to be arrest
10/9/2022 CFBC CFBC Upper Secondary Damper Feedback Hunting to be check
10/9/2022 WHRB-1B WHRB-1B Inlet Flue Gas Pressure Checking
10/9/2022 TG-1A TG-1A CEP-2 Related Instrument PM
10/9/2022 WHRB WHRB Service Air Compressor-2 Related instrument PM
10/9/2022 TG-1B TG-1B CST Related Instrument PM
10/9/2022 CFBC CFBC DCF-3B cable checking has to be done.
11/9/2022 WHRB-1B WHRB-1B Inlet Flue Gas Pressure Checking
11/9/2022 CFBC CFBC Upper Secondary Damper Feedback Hunting to be check
11/9/2022 CFBC CFBC Bed Ash Pannel Cable termination and tubing work
11/9/2022 TG-1B TG-1B CEP-2 Related Instrument PM
11/9/2022 TG-1A TG-1A CDP-2 Related Instrument PM
11/9/2022 WHRB-1A WHRB-1A ID Fan-2 Related Instrument PM
11/9/2022 CHP Bag Filter of Bunker PM work
12/9/2022 CFBC CFBC Wind box PT Checking
12/9/2022 WHRB-1B WHRB-1B Flue Gas Pressure Checking
12/9/2022 CFBC CFBC BFP-3 Related Instrument PM
12/9/2022 TG-1B TG-1B CDP-2 Related Instrument PM
12/9/2022 CHP BC-3 and 3A related Instrument PM
12/9/2022 TG-1B TG-1B Hotwell Related Instrumernt PM
13/09/2022 CFBC CFBC SA to Burner Flow Tx checking
13/09/2022 Phase-1B MCC Area Fire Alarm has to be checked
13/09/2022 BOP CT Make Up Pump Related Instrument PM
13/09/2022 WHRB BFP-3 Related Instrument PM work has to be done
13/09/2022 TG-1A TG-1A ACC-3 Related Instrument PM work has to be done
14/09/2022 CFBC CFBC Attemp-2 CV 603 has to be calibrated
14/09/2022 New System has to be installed For Scada
14/09/2022 TG-1B TG-1B ACC-3 Related instrument PM work
14/09/2022 Bunker Loadcell Has to be check
14/09/2022 TG-1A TG-1A HPH and Bleed Related instrument PM
14/09/2022 Instrument Air Compressor-3 Related Instrument PM

18/09/2022 TG-1B CT Fan-1 Related Instrument PM


TG-1B TG-1B MOP Related Instrument PM
TG-1A LPH & Bleed Related Instrument PM
Raw Water Transfer Pump Related Instrument PM work has to be done.
WHRB BFP-2 Discharge By Pass MOV Limit Checking has to be done
19/09/2022 TG-1B CDP-2 Discarg

21/09/2022 CFBC BAC-3 Conveying Pannel Tubing and Cable Loop Checking
21/09/2022 WHRB WHRB CEMS Instrument Cleanning and Purgging
21/09/2022 CFBC CFBC IAC-4 Instrument PM
21/09/2022 CFBC CFBC DCF Area Instrument PM
21/09/2022 CFBC CFBC BED Ash Silo Inst. PM
21/09/2022 COMPRESSOIR Compressor ADV Tubing work
21/09/2022 TG-1A TG-1A 10 mtr Area Instrument PM
21/09/2022 WHRB-1B WHRB-1B Main Steam Flow Tx has to be taken in line.
STATUS PTW num DONE BY REMARK
Under Progress Saroj/Nihar Pull Cord Clamp Hook welding work pending
Closed Avhishek/Bhuban Checked and Taken in line
Postponed Tx not Avaliable
Closed By Mechanical team
Closed Book-2/51 Kamlesh/Satya/Rudra
Closed Book-2/51 Kamlesh/Satya/Rudra
Closed Book-2/51 Kamlesh/Satya/Rudra
Pending
Closed Book-2/52 Kamlesh/Satya/Rudra
Pending
Pending Mechanical Shifting work is under progress
Closed Akshay/Nihar
Pending
Closed 1622 Sudhansu/Pratap
Closed 83 Saroj/Rudra
Closed 84 Saroj/Rudra
Closed 85 Saroj/Rudra
Closed 86 Saroj/Rudra
Closed 86 Saroj/Rudra
Closed 87 Avhishek/Bhuban
Pending
Closed Sudhansu
Pending
Closed
Closed 7044 Kamlesh/Pratap
Closed 7043 Kamlesh/Pratap
Closed 7041 Kamlesh/Pratap
Closed
Closed Tusar/Nihar
Under Progress Tusar/Nihar
Closed 201 Avhishek/Pratap
Closed 202 Avhishek/Pratap
Pending Shutdown Job
Pending
Pending
Closed 309
Closed 311
Closed 310
Closed
Pending
Under Progress
Closed
Closed
Closed
Closed
Pending
Pending
Pending
Closed
Closed

Closed Permit not taken Santanu Sir/ Kamlesh


Closed with electrical permit
Closed 218 Kamlesh/Satya 1 ORP Sensor has been changed
Closed 219 Kamlesh/Satya
Pending
Closed 451 Kamlesh/Satya
Pending
Closed 229 Sudhansu/Nihar
Closed Kamlesh/Pratap
Closed Sachi/Rudra
Pending
Closed Sachi/Rudra
Closed Sachi/Pratap

Closed Sachi/Pratap
Closed
Pending
Closed
Pending
Closed
Closed
Closed
Closed
Pending Shutdown Job
Closed
Closed
Closed
Closed
Closed
Closed Sudhansu/Nihar
Closed Tusar/Pratap
Closed Tusar/Pratap
Closed Tusar/Rudra
Closed Tusar/Rudra
Closed Tusar/Pratap
Closed Kamalesh/Pratap
Closed Sachi/Pratap
Closed Kamalesh/Nihar
Closed Kamalesh/Pratap
Closed
Closed Avhishek/Nihar
Closed Tusar/Nihar
Closed Tusar/Rudra
Pending
Closed Tusar/Rudra
Closed Tusar/Rudra

Closed Saroj/Rudra
Closed Saroj/Rudra
Closed Saroj/Rudra
Closed Saroj/Pratap
Closed Tusar/Pratap
work pending

der progress
Date Job Description
9/1/2022 CFBC PA Fan-1 Related Instrument PM work has been done
9/1/2022 CFBC ID Fan-1 Related Instrument PM work has been done
9/1/2022 CFBC SA Fan-1 Related Instrument PM Work has been done
9/1/2022 Fire Fight Pump Related Instrument PM work has been done.
9/1/2022 Soot Blower Line Control Valve-901 Passing Checked , Found Normal
9/1/2022 CFBC Service Air Reciver Tank Auto Drain Valve has been checked and Cleanning Done
WHRB-1B ESP 1st Field Line Block Latching Logic Implimented and Trail Taken, Also Hooter Alarm
9/1/2022 Given for System-1 and 2 System Fault
9/1/2022 ACID Unloding Pump Related Instrument PM work Has been done.
CFBC- ECO /APH Conveying Line block has been cleared after clenning the Vessel Pressure Low
9/1/2022 PS Tubing.
9/1/2022 TG-2 CDP Selection Logic has been implimented
9/1/2022 WHRB-1A Attemperator Contol PID has been tuned, it is under observation
WHRB-1A/1B Hydrastep Indicator has been mounted at DCS Control Room Announciator Pannel
9/1/2022
9/1/2022 CFBC Bed Ash Conveying Pannel-1 has been relocated
9/1/2022 WHRB-1B ESP Hopper Level Switch has been taken in line
BC-1 to BC-4 Pull Chord Rope Has bee extended temporarily,as Clamp Hook welding work
9/1/2022 Pending
9/1/2022 Crusher ZSS Mounting Plate Relocation has been done
9/1/2022 CFBC BFP-3 Suction DP Tx has been taken in line after mechanical Maintenance
9/1/2022 CFBC WindBox PT Showi ng deviation , Flushing done now ok.

CFBC ECO Dome seal fail checked and found its Knife Gate jamming , after Normalisation by
9/1/2022 mechanical , Now ok. Its Conveying Pressure was not showing , so its line flushing done.
9/2/2022 TG-1B Lube Oil System Related Instrument PM has been done
9/2/2022 CFBC HP Dosing Pump-2 related Instrument PM has been done
9/2/2022 CFBC BFP-2 Related instrument PM has been done
9/2/2022 CFBC ID Fan-2 Related Instrument PM work has been done
9/2/2022 CFBC PA Fan-2 Related Instrument PM work has been done
9/2/2022 CFBC SA Fan-2 Related Instrument PM Work has been done
9/2/2022 WHRB-1A swas pH and Cond Sensor Cleanning has been done

CFBC PA Fan-2 Discharge Pressure Tx Showing Wrong, Purgging done,but found it Tx Range (0-
10000mmh2o) was wrong change the same with PA fan-1 Discharge pressure Range(0-
9/2/2022 2500mmh2o) now both are showing normal.
9/2/2022 WHRB-1B Hydrastep Power normalised and taken in line.
DMP E-Pit Discharge Pump checked found Stop Do bypassed in electrical pannel, work pending
9/2/2022 for tomorrow
9/2/2022 WHRB-1B ESP All Field Hopper Level Probe Checking has been done.
9/2/2022 CFBC Air Reciver Tank ADV has been serviced and taken in line.
9/2/2022 DRYER-2 Change Over Done
9/2/2022 CFBC ECO /APH Conveying System was not healthy so checked and problem rectified
9/2/2022 DMP RO Sequence has been Hoult condition, checked in logic and reset the same
9/2/2022 WHRB-1A Hopper Level High has been rectified by cleanning the probe
WHRB-1A Radiation 4th Field Knife Gate Quick Exhaust found Passing so same has been replaced
3/9/2022 by new one
3/9/2022 BC-2 Pull Chord has been checked and normalised the same
3/9/2022 Bed Ash Cooler PT-1307 has been purgged and now showing normal value.
3/9/2022 CFBC DCF Area Instrument PM has been done
3/9/2022 WHRB-1A ID Fan-1 Related instrument PM has been done
3/9/2022 BFP-2 Related instrument PM has been done
3/9/2022 CFBC O2 Analyser Pannel Cleanning Done
3/9/2022 CFBC Bed ash Conveying Pannel-1 cable glanding work is under progress
3/9/2022 Wind Box PT Choking Problem has been solved after purgging the line
Effluent Pump-D checked and found its DCS Stop has been by passed from electrical feeder,
4/9/2022 same has been checked by electrical. Now ok
4/9/2022 Effluent Pump-B checked and made operative from DCS.
4/9/2022 Wind Box PT-807 has been purgged.
4/9/2022 WHRB Swas Line Leakages has been arrested
5/9/2022 TG-1A ACC-6 Related Instrument PM work has been done.
5/9/2022 WHRB HP Dosing Pump-1 Related Instrument PM work has been done
5/9/2022 WHRB-1A ID Fan-2 Related instrument PM work has been done.
WHRB-1B ID Fan -2 Run feed back checked and found DCS Side Fuse blown , recheck the
5/9/2022 connection and taken in line.
5/9/2022 Phase -1B Announciation has been taken in line.
5/9/2022 Start Up Vent MoV Open and Close Pulse Time changed to 5 sec.
5/9/2022 CFBC ECO Conveying Vessel Pressure Switch checked and its PU Tube cleanning done.
5/9/2022 TG-1B CEP-2 DP Tx showing High value , so same has been flushing has been done.

WHRB-1B ID Fan-2 Vibration was Showing High, So same has been checked and observed its
5/9/2022 Location and tagging has been interchanged with ID Fan-1.Need to be check
6/9/2022 TG-1A CST Related Instrument PM work has been done.
6/9/2022 TG-1A Dumping Line Instrument PM work has been done
6/9/2022 CFBC Service Air Compressor Related Instrument PM work has been done.

6/9/2022 CFBC ESP Out Let Temp (1CTI0817) has been checked nad found it is matched with dcs readding.
6/9/2022 WHRB-1A MOV-201 Limit Setting has been done.
BC-2 PCS Mounting done and taken in line.
7/9/2022 Wind Box Pressure Tx Purgging Done.
7/9/2022 SSh O/L Flu Gas PT has been flushed, now showing ok.
7/9/2022 TG-1B CDP-1 Suction Valve Checked and Limit Setting has been done.
7/9/2022 TG-1B CEP-1 Suction Valve Limit has been adjusted and taken in line.
CFBC Boiler has been manually shut down at 9:18 am and TG was at ilanding conditionat 9:29
7/9/2022 am
7/9/2022 Burner Area Instrument Cleanning done.
7/9/2022 SA Fan-1 and 2 Suction IGV Cylinder Link has been welding work has been done.

SA Fan-1 Discharge Damper Open Limit has been checked and found gate mechanically jamming
7/9/2022 condition, so same has been serviced by mechanical, then Limit setting done.
7/9/2022 CFBC SA Upper Damper-816 is not operative
7/9/2022 CFBC Light Up Activities has been done
8/9/2022 CT Fan-3 PM work has been done
8/9/2022 IR Dryer Line NRV Damage,so new NRV replaced
DMP ORP Sensor was Showing Wrong, so same has been checked and found Sensor foulty, new
8/9/2022 sensor has been used
8/9/2022 TG-1A hotwell Related Instrument PM work has been done.
8/9/2022 DM Feed Pump related instrument PM work has been done.

8/9/2022 WHRB BFP-2 Discharge Bypass MOV Open feed back Cable found foulty, to be replaced
8/9/2022 WHRB-1B ESP 2nd Field TRCC Voltage feedback has been taken in line
8/9/2022 BC-1 Pull Chord Switch has been checked and found acted, so normalused the same.
WHRB-1B Readiation 1st Field Dome was not Operate, checked and found its SOV Damaged, so
8/9/2022 Same has been replaced by new one.
9/9/2022 TG-1B ACC -2 Related Instrument PM work has been done
9/9/2022 Wind Box PT Flushing work has been done
9/9/2022 CFBC Attemp Control Valve(attemp-2) has been checked and Found Normal
9/9/2022 A new Auto Drain Valve Has been installed at WHRB-1B Service Air Recever Tank
9/9/2022 WHRB BFP-2 All Instrument Has been removed as per Mechanical requirement
9/9/2022 ACW-3 Related Instrument PM work Has been done.
9/9/2022 MB Area Instrument PM work has been done.
9/9/2022 CHP BC-4 Load cell Calibration work has been done

CFBC Furnace Temp (3 number) found showing differnet value, same has been checked and
observed uneven insertion of element, fitting also found rustted and broken,so need to be
9/9/2022 checked during shutdown.
Bed Assh Cooler-2 Mobiolising Valve Open Feedback has been checked and after mechanical
9/9/2022 jamming cleared, same has been taken in line.
TG-1A ACC-2 all instrument PM work has been done
WHRB Service Air Compressor -2 Related Instrument PM
Area Shift Engg/Tech PTW Num Status Remark
CFBC A Kamlesh/Rudra 51 Closed
CFBC A Kamlesh/Rudra 51 Closed
CFBC A Kamlesh/Rudra 51 Closed
Fire Fight A Kamlesh/Pratap 54 Closed
CFBC A Kamlesh/Satya 365 Closed
CFBC A Kamesh/Satya Closed

WHRB-1B A Kamlesh/Sudhansu Closed

DMP A Kamlesh/Pratap 52 Closed

CFBC A Kamlesh/Satya Closed

TG-2 G Sudhansu Closed


WHRB-1A B Avhishek/Sudhansu Under Observation

WHRB-1A/1B G Akshya/Nihar 62 Under Progress

CFBC G Closed
whrb-1B B Avhishek/Pratap/Bhuban Closed

CHP G Saroj/Nihar Closed

CHP G Saroj Closed


CFBC B Avhishek/Bhuban Closed
CFBC C Tushar/Rati Closed

CFBC C Tushar/Rati Closed

TG-1B A Saroj/Rudra 83 Closed


CFBC A Saroj/Rudra 84 Closed
CFBC A Saroj/Rudra 85 Closed
CFBC A Saroj/Rudra 86 Closed
CFBC A Saroj/Rudra 86 Closed
CFBC A Saroj/Rudra 86 Closed
WHRB-1A G Sudhansu/Pratap Closed

CFBC G Sudhansu/Preatap Closed


1622
WHRB-1B G Akshay/Nihar Closed
Avhishek/Sudhansu/
DMP G Pending
Pratap
WHRB-1B B Avhishek/Bhuban Closed
CFBC B Avhishek/Bhuban Closed
B Avhishek/Bhuban Closed
CFBC B Avhishek/Bhuban Closed
DMP C Kamlesh/Rati Closed
WHRB-1A C Kamlesh/Rati Closed
WHRB-1A A Sachi/Bhuban Closed

CHP A Sachi/Bhuban 7033 Closed


CFBC A Sachi/Bhuban 2034 Closed
CFBC A Sachi/Bhuban 7043 Closed
WHRB-1A A Sachi/Bhuban 7041 Closed
WHRB A Sachi/Bhuban 7044 Closed
CFBC A Sachi/Bhuban 7042 Closed
CFBC B Saroj/Rati 2335 Under Progress
CFBC B Saroj/Rati Closed

DMP B Sachi/ Rati


DMP B Sachi/ Rati
CFBC B Sachi/ Rati
WHRB B Sachi/Rati
TG-1A A Kamalesh/Rati 311
WHRB A Kamalesh/Rati 310
WHRB-1A A Kamalesh/Rati 309
WHRB-1B A
Kamalesh/Rati
TG-1B G Sudhansu/Nihar
CFBC G Sudhansu
CFBC B Sachi/Rati
TG-1B B Sachi/Rati

WHRB-1B B
Sachi/Rati
TG-1A A Saroj/Rati 07/323
TG-1A A Saroj/Rati 07/324
CFBC A Saroj/Rati 7/325
CFBC A
Saroj/Rati 07/335
WHRB-1A B Sachi/Satya
CHP C Avhishek/Rudra
CFBC C Avhishek/Rudra 05/203
CFBC C Avhishek/Rudra
TG-1B C Avhishek/Rudra
TG-1B C Avhishek/Rudra
TRIP A
Avhishek/Sata
CFBC A Avhishek/satya
CFBC B Tusar/Rudra

CFBC B
Tusar/Rudra
CFBC B Tusar/Rudra
CFBC B Tusar/Rudra
BOP G Tusar/Nihar 451
A Kamalesh/Satya
DMP A
Kamalesh/Satya
TG-1A A Kamalesh/Rudra 219
DMP A Tusar/Pratap 218
WHRB A
Kamalesh/Pratap Under Progress
WHRB-1B B Abhishek/Bhuban
CHP C Tusar/Rati

WHRB-1B C
Tusar/Rati
TG-1B G Kamalesh/Pratap 5/221
CFBC A Sachi/Rudra 5/227
CFBC A Sachi/Nihar 5/228
WHRB-1B G Kamalesh/Bhuban 5/232
WHRB A Sachi/Rudra
BOP G Kamalesh/Pratap 5/224
DMP G Kamalesh/Pratap 5/226
CHP G Sudhansu/Nihar 5/230

CFBC G
Avhishek/Nihar Pending
CFBC B
Avhishek/Bhuban
TG-1A A Sachi/Bhuban
Sl Num Date Defects Source Status
1 CFBC Soot Blower Control Valve and MOV Both are in
1/9/2022 Passing Condition Operation Open
4
3/9/2022 CFBC Looking Glass Broken Furnace (Compressor Side) Operation Open
5 4/9/2022 WHRB-1A start Up vent found hunting Operation Open
6
5/9/2022 WHRB-1A Attemp TCV is not working on Auto Mode. Operation Open

7 WHRB-1B MS Drain MOV-208 and MOV-201 close


6/9/2022 Feed back issue Operation Pending
10
7/9/2022 CFBC Upper Nozel (CD-816) is very Hunting Found Operation Open

11

9/9/2022 CFBC Furnace TT-0808(all 3 Tx) Showing Abnormal Operation Open


21 15/09/2022 TG-1B ACC-3 was Tripped 3 times in the shift Operation Open

22

18/09/2022 CT Fan-1 and 2 Current is showing wrong in dcs Operation Open


24 CFBC Soot Blower Control Valve and MOV Both are in
19/09/2022 Passing Condition Operation Open
25 TG-1B ACC Fan-4 was tripped Several time in Y axis
19/09/2022 Vibration High Operation Open
26 WHRB -1A start Up Vent Control Valve is found
20/09/2022 Hunting Operation Open
Attend By Closeing Date PTW Num Remark
Checked found Valve Passing informed
Kamalesh 1/9/2022 to Oper. For mech job

Sudhansu Informed to Mechanical


Sachidananda

Sudhansu Logic to be Change(under discussion)

MOV-201 Close feedback checked and


Sudhansu made ok. MOV-208 Approach Issue.

Shut down job

Checked and TT-808A and TT-808C


made ok, TT-808B inserttion is found
less than other, its fitting also found
damaged, so it has to be done in
Sudhansu shutdown

CT fan-2 Current Range found miss


matched with field, so same has been
normalised. CT fan-1 Electrical Isolater
Sachidananda issue.

Repeat on 1/09/2022

Vender required, Under Discussion


with Team