PROJECT NAME :

CGK064

DOCUMENT TITLE :
METHOD STATEMENT FOR
INSTALL ANCHOR
&
DISMANTLE CHECKERED PLATE

DOCUMENT NO. :
CGK064-IBP/MAK/2212277
Issue Reviewe
Date Revision Description Prepared Approved
Rev. d

       
   

0 15-12-2022 Issued for Review Erlangga Ruslan S Sefrizal


METHOD STATEMENT Document No.
CGK064-02-BBB-CCC-000x
TEMPORARY FENCING
Rev. No : 00
(MS2210271) Page : 2 OF

1. PURPOSE
This document is to explain the step by step of installment anchor and dismantling
checkered plate by PT. Indokomas Buana Perkasa. The explanation is provided to
ensure that work can be done effectively and safely in accordance with rules,
standards, and specification set in this project.
Temporary fence is illustrated in attachment.

2. TOOLS AND PPE


2.1. Tools
2.1.1. Basic hand tools
2.1.2. Portable genset and accessories
2.1.3. Scaffolding / Stair A
2.2. PPE
2.2.1. Safety helmet
2.2.2. Safety shoes
2.2.3. Hand gloves
2.2.4. Safety googles / face shield
2.2.5. Blower exhaust
2.2.6. Tarp

3. INSTALLATION PROCEDURE
3.1. Preparation
3.1.1. Check the condition of all tools and personal protective equipment (PPE).
All electrical tools should have been checked and tagged by HSE officer
before the work starts. In additon PPE to be worn by manpower should
fulfil the specification regulated by the project.
3.1.2. Confirm that all manpower wear the required PPE and it should have
been checked to ensure it can function as intended.
3.1.3. Confirm tha Job Safety Assesment (JSA) and Permit to Work (PTW) have
been approved and signed by supervisor and HSE officer.
3.1.4. Check all of components attached to the fence, such as alarm system,
sensor, etc.
3.2. Install temporary partition outdoor
3.3. Dismantle checkered plate
3.4. Finishing ex-checkered plate
3.5. Cleaning and dismantle temporary partition outdoor
METHOD STATEMENT Document No.
CGK064-02-BBB-CCC-000x
TEMPORARY FENCING
Rev. No : 00
(MS2210271) Page : 3 OF

3.6. Install temporary partition indoor


3.7. Drilling hole for anchor
3.8. Assy concrete reinforcement
3.9. Install anchor
3.10. Dismantle temporary partition indoor
3.11. Install formwork
3.12. Cement casting
3.13. Cleaning and finishing

4. ATTACHMENT