4 1 FORM OF BID FOR COMMERCIAL PROPOSAL Quotation Prepared Notes1
4 1 FORM OF BID FOR COMMERCIAL PROPOSAL Quotation Prepared Notes1
C4
(WAPEC)
1
1. The Day Rate
The day rate hereinafter stated shall be based on the work scope, Interface,
responsibilities and obligations, all personnel and field services and other pricing.
administrative expense, etc., that includes but is not limited to all of the additional
the Withholding Tax from invoice payment and transfer to General Committee of
Taxation (GCT) of Iraq according to the law No. (19) 2010, No. (5) 2011 and its
instructions.
3. Day-rate
a) The day-rate includes the full day-rate and standby day-rate. The standby
occurrence and then pull out it to make DIFA to analysis the root reasons of stuck
2
If stuck or plug is due to foreign materials from the well, the Contractor
will be compensated for all rents as stand by the rent from the
the Contractor will not be compensated for the rent stopping from the
occurrence of the stuck/plug until the pump is pulled out from the well.
of the stuck/plug and also the TRL penalty shall be applied based on
this RL, but if the pump is not pulled out within 60 days, then the TRL
waiting for water injection effect to take place, water constrain, high WC, heavy
oil, inflow problems, export curtailment and so on, the day rate will be paid 30% of
deduction about the sensor if the data are missing after two years.
4. Mobilization fee
The Contractor shall mobilization the personnel, equipment, tools, instruments,
Contractor shall have Support Base built in Ahdeb Oilfield with the ability to
Contractor shall have the Full Functional Base built in Iraq with the ability to do
3
After approval by the Company, the Contractor could submit the invoice for the
CONTRACT
6. Penalty of Contract
5.1 Delay in mobilization (Contract Mobilization)
A lump sum amount per day will be payable to the Company if the Contract is
delayed in its mobilization for whatsoever reason, other than force majeure or a
delay caused directly by the Company, stated in Attachment Penalty List (1, and
2). If the Contract mobilization is delayed for 120 days, the Company has the
right to terminate the Contract. The Company in such an event shall not be liable
materials, tools, instruments to the Ahdeb filed within five months after the
Company’s notice, the delay in equipment delivery penalty shall be applied as per
others) or other reasons within the Contractor control, the Contractor is failed to
deliver services on the time, the Company has the right to deduct the amount
job due to the Contractor’s faults such as the absence of personnel and
4
the non-productive time penalty shall be applied from the time the delay
started to the time the services are resumed from where they were
stopped. Deduct the amount stated in the Attachment Penalty List 5.1.
b) During ESP RIH, any failure may happen in ESP parts (cable, sensor,
MLE, motor, etc) and this failure lead to pull out ESP from the well, in such
case the non-productive time penalty shall be applied from the time the
stop started to the time the services are resumed from where they were
stopped unless it can prove and identify to be the responsibility of the non-
control, and restart the Surface ESP equipment within 48 hours after the
Penalty List 6.
5.2.4 Premature Failures penalty
Premature failure means the failure of any down-hole ESP equipment within
date and failure date). In case the premature failure happens, the Premature
than TRL. The penalty shall be applied after pulling out the failed equipment.
different field. The Contractor shall pay the amounts in Penalty Mythology as
the penalty in case the run life (RL) is less than 80%*TRL.
The premature failures penalty and RL/TRL penalty shall be applied unless it
5
- Mechanical downhole problem: pump block or pump stuck severely by
unknown material
- Wellbore issues to cause failure
- Lost in hole due to tubing parted or other Non-Contractor issues.
- Pulling out equipment as intervention, pump down/up sizing
- But excluding ESP running without recommended operation range (ROR)
unless it can clearly prove and identify that this running causes the failure
directly.
After a downhole problem only including mechanical problem happens,
normally the Company will try to arrange the rig to pull out the ESP within 90
days not only to recover the production but also to reserve the complete
evidence that will help to identify the reasons to cause failure special for
ESPs whose run-life are less than TRD. But sometimes for some reasons
such as no available rig, low priority, next actions not determined yet, etc. The
Company may delay pulling ESP. In this case, the penalty will not be applied.
5.2.6 Critical personnel replaced
The Contractor shall pay the amounts in attachment Penalty Mythology 8 as
the penalty in case the critical personnel is replaced without the Company's
approval.
5.2.7 Not finish the train task penalty
In the event the Contractor rejects the training application of the Company,
ROR for some reasons, in these cases no any additional payment shall be
paid for the Contractor. These cases shall be including but not limited to:
- Pull out ESP for intervention,
- Down/upsizing ESP
- Shut down ESP due to W/C, facilities, power, etc. issues