Professional Documents
Culture Documents
Spark Gap Assembly
Spark Gap Assembly
CONRACTOR PROJECT AND LOCATION SHEET CONTENT CAD BY: CHECKED BY: INSPECTED BY: CHECKED BY: SHEET NO.
ALJOHN AMBAT ENGR. EDISON MIRAL ENGR. MERVIN JOE MALACA ENGR. KRISTIAN PAUL GENARO
PARKLINKS SPARK GAP MECC CAD OPERATOR MECC QA / QC MDC MEPFS / FE MDC MEPFS / QA & QC
NORTH TOWER
ASSEMBLY DETAILS APPROVED BY: