Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

4" THK.

CHB WITH
SPECIFICATIONS 10 mmDIA RSB SPACED
600 AS SHOWN
1. ALL WORKS HEREUNDER SHALL BE DONE IN
ACCORDANCE WITH THE LATEST PROVISIONS
LEGEND : 100 400 100

OF THE PHILIPPINE PLUMBING CODE. M WATER METER


2. ALL PLUMBING MATERIALS SHALL BE BRAND WC WATER CLOSET

100
NEW AND OF APPROVE TYPE FOR USE AND LAV LAVATORY INLET
LOCATION AND FREE FROM ANY FACTORY CO CLEANOUT
F FAUCET

400
600
DEFECT. OUTLET INLET
3. ANY ALTERATION IN THE APPROVED PLUMBING SP SUPPLY PIPE CO
SV SUPPLY VALVE 6" DIA PVC
PLANS SHALL FIRST THE PERMISSION AND STORM PIPE
SH SHOWER HEAD

100
APPROVAL TO THE SUPERVISING SANITARY KS KITCHEN SINK
ENGINEER OR MASTER PLUMBER. CB CATCH BASIN PLAN
4. ALL WORKS HEREUNDER SHALL BE DONE IN A DS DOWN SPOUT
WORKMANLIKE MANNER TO ENSURE DURABILITY 600
ST SEPTIC TANK
OF THE INSTALLATION. DC DIGESTIVE CHAMBER 100 400 100
5. ALL WORKS SHALL BE DONE UNDER THE DIRECT LW LEACHING WELL
AND IMMEDIATE SUPERVISION OF THE DULY GV GATE VALVE

75
LICENSED SANITARY ENGINEER OR MASTER CV CHECK VALVE
PLUMBER. VSTR VENT STACK THRU ROOF
HB HOSE BIBB
6. PROVIDE 2% OF SLOPE FOR HORIZONTAL WASTE

450
600
MH MANHOLE
PIPE LINE, 1% SLOPE FOR HORIZONTAL VENT PIPE GT GREASE TRAP
LINE.
7. ALL PLUMBING INSTALLATIONS SHALL BE WATER

75
TIGHT, FREE FROM LEAKS AND CLOGS.
8. ALL SOIL PIPES SHALL BE PVC (MOLDEX), VENT
6" DIA PVC
PIPES SHALL BE PVC SCHEDULE 40, TRUE TO SIZE STORM PIPE
AND APPROVED BRAND AND QUALITY AS INDICATED SECTION
ON PLANS.
CATCH BASIN DETAILS
SCALE 1:30 M

PROPERTY LINE PROPERTY LINE

RD RD
DS
PROPERTY LINE

PROPERTY LINE
CB CB
DS DS DS DS
CLOSET

CLOSET
FD SHO

SHO BEDROOM SHO BEDROOM


CO WC FD
IRCP

100MMDA
IPVC CO
IE

WC
SEWERPP
150MMDA

T&B WASTEPPIE@2%SLOPE VSTR T&B


DS LAV DS LAV
GV
4 DS DS 4 DS DS 4 4
CB CB CB

1 2 3 5 1 2 3 5 1 2 3 5 1 2 3 5
IE@2%SLOPE

6 6 6 6

CLOSET

CLOSET
7 7 7 7
IPVC
IRCP

KITCHEN

KITCHEN
GV
IE

8 8
IRCP

WASTEPP
SEWERPP

IE

100MMDA
150MMDA

KS KS
SEWERPP
KITCHEN

KITCHEN
150MMDA

9 9
DIRTY

DIRTY
DINING STOR./
10

BEDROOM 02
KF
KF
DINING STOR./
10

BEDROOM 02
IRCP
IE

11 11
KS
SEWERPP

100MM DIA. PVC


150MMDA

UTILITY 12 UTILITY 12

13
SOIL STACK 13

DS 14 DS 14
CO
DS NOOK ST DS 15
NOOK 34
/ D"AIPVC GV 15
GV
FIREWALL

FIREWALL

FIREWALL

FIREWALL
SERVICE OPEN BELOW 16 SERVICE VWL VWL OPEN BELOW 16
VWL
SS LAV VSTR CLEANWATERLN
IE LAV WC
CB CB HIGH CEILING WC HIGH CEILING SHO
T&B
FD FD
SHO HB T&B SHO

LIVING LIVING
GARAGE CLOSET GARAGE CLOSET
IRCP
SEWERPP IE
150MMDA
IRCP

IRCP
IE

IE
SEWERPP

SEWERPP

IE
150MMDA

150MMDA

CLEANWATERLN
/ D"AIPVC
DS DS DS DS DS DS

34
CB CB CB

BEDROOM 01 HB BEDROOM 01
steel gate steel gate
IRCP

DS DS DS DS
IE

CV
SEWERPP
150MMDA

CB CB

WM
TO MAIN SEWER

TO MAIN SEWER

TO MAIN SEWER

GREEN GREEN

GV
SIDEWALK SIDEWALK SIDEWALK SIDEWALK

FROM WATER MAIN


DRIVEWAY SECOND FLOOR DRIVEWAY SECOND FLOOR

SOURCE
ROAD ROAD

GROUND FLOOR SEWER & WASTE DISPOSAL LINE LAYOUT PLAN GROUND FLOOR CLEAN WATER LINE LAYOUT PLAN
SCALE 1:100 M SCALE 1:100M

PROJECT REVISION DATE R.A. 9266 SEC. 33 SHEET CONTENT APPROVED SHEET NO.
DRAWINGS AND SPECIFICATION DULY
SIGNED, STAMPED OR SEALED, AS
INSTRUMENTS OF SERVICE, ARE THE
DESIGNED BY:AR.FJACOBO
PROPERTY AND DOCUMENTS OF THE
ARCHITECT, WHETHER THE OBJECT FOR AS SHOWN
PROPOSEDTWO-STOREY WHICH THEY ARE MADE IS EXECUTED
OR NOT. IT SHALL BE UNLAWFULL FOR CHECKED BY: AR.FJACOBO 1

PRC NO.
MASTER PLUMBER
ISSUED AT
RESIDENTIALBUILDING
ANY PERSON, WITHOUT THE WRITTEN
CONSENT OF THE ARCHITECT OR
AUTHOR OF SAID DOCUMENTS FOR APPROVED BY: JCC ARWIN PAMA P 2
USE IN THE REPETITION OF AND FOR
TIN OTHER PROJECT OR BUILDINGS, WHETHER
PTR. NO.
LOCATION : PUROK 2 MAURARO, GUINOBATAN ALBAY EXECUTED PARTLY OR IN WHOLE. CAD BY: AR.FJACOBO OWNER
ISSUED ON

You might also like