Technical Proposal for Natural Gas Power Plant: 8 x 4.3 MWe
s.
Technical data 4900 kWel; 11000 V, 0 He; Natural gas, MWWMl MN = 80, Mw iM
Design conattions Fuel gas data:
Cond arose Haris rors 5/80 MlMetane eer 1 »
sate oa ao Leveeaontevie: (ngs) 020
Esha tarp. sar bat exchange ra 12 Gredersty gins) 080
ovens derance-o8) ‘rom =o tac a ng
Genset
nae reozesav,
past [Nip se0
Cornuanon rer tnd i vis
Bore Stoke Capea neni (dn?) 260(320/272
Carpesin ao ry ‘2
san ton spec: il “
Nea hte coum a illo inv as
Enghemanegenentsysen nm renee
ean otnge ange emer Mrsrha) too 410/50
Speed in 100
s
Energy balance
ose ™ 100 2
ei sener COP ee 190 55201 wn 4300 ss 2160
Gener efeencyvineasPhi= he ps m9 or ona
Ergoe pone ce 150 $0481 won a0
Eran inet water het en a8) eat
Inreslr Theat so) 8
Ube ht ors) 6
het ot se ea exchange res) as
hast rperanre ra 0
thet mate oat on) 2s
Centum nats ow -180 3048 ben) 2s
Faction eat erin gorrso, en ao 20/90
Fut eosinetion en sox} 10238
siecres macnn arma ete ms sagvaaeias2
Se enc pm m2
‘system parameters
eriionarfov(onh ane oat™ EK igh team
Centntn eevee rn See ta 38
inset 218
wet :
2xcopena gs co a eb a 02 inte! 201200
Pret pe cnsttsancaba ten bal asir0
‘toe re! mene Uesyimd 2/30
coer bere ery
Ue coe gin be are ba ‘te
Brahe aaee ome ba seen 03
Cooling system
‘ize conten engine jacket water inerosier mV 0/35
Water vlume engine act intercoler, ier 570/51
KVS | Cv value engine jacket water / intercooler: [eh 63/62
aces ater colt epee n/ rei 73/0
Inereclercolant temperature / out re 40/40
Engine jacket water flow rate from /to: rn?) 105/130
Water flow rate engine jacket water / intercooler, [oh 124/85,
Water pressure lous engine jacket water eros: el waa
Lae ci trp. engine in ax. be low rt evan) 20/128
Proposal Report for 18 MWe Power Plant setup at Cairn India Site.
BLACK STONE TERRY ENGINEERING COMPANY
SYSTEM INTEGRATORS & EPC CONTRACTORSNatural gas Fired Power Plant 34.70 MW with 8 x MWM TCG 2032V16 gas generating sets
This power plant was commissioned in November 2012 with six units of MWM 4.3 MW gas generators. In
year 2014 two more MWM 4.3 MW units were added to the plant along with 8 steam heat recovery boilers
(one for each generating set), and 4.45 MW steam turbine with complete water treatment and steam system
making this plant as Combined Cycle Power Plant with total net capacity of 34.70 MW at 34 kV. Electric
production was stopped in December 2017 and plant is kept hot and powered. Authorized MWM service
company has made all services to these units using only original MWM parts. Today total operating hours
for 6 older units is around 12 000 hours and for two newer units around 7000 hours. Equipment is in excellent
condition as you can see attached very recent pictures. No any unnormal problems has occurred during
operation.
Power Plant in Nut Shell:
Sr.No. | Description of Parameter Details
1 Type of gas engines MWM TCG 203216
2 Number of generating units installed 8
3 Manufacturing year of first 6 units 2012
4 Electrical Power of each unit of first 6 units 4,3 MWe
5 Manufacturing year of remaining 2 units 2014
6 Electrical Power of two new units 4.45 MWe
7 Net Electrical Output of All 8 units combined 34.4
8 Steam Production at 100% load 22 TPH at 18 bar (352 °C)
9 Net Electrical Efficiency in combination cycle 46.00%
10 Net Electrical Efficiency in single cycle 42.00%
11 Natural Gas Consumption at 100% load (approx.) 8536 Nm#/hour
12 Engine Manufacturer Name wm
13. Engine Rotational Speed (RPM) 1000
14 Number of Cylinders in each engine 16
15 Alternator Manufacturer AvK
16 Alternator Model Avk DIG 156 m6
17 Alternator Rated Power 5336 kVA @ 0.8 pf
18 Alternator Operating parameters 1AKV, 50 Hz @ 750 RPM
Proposal Report for 18 MWe Power Plant setup at Cairn India Site.
BLACK STONE TERRY ENGINEERING COMPANY
SYSTEM INTEGRATORS & EPC CONTRACTORSImage of power plant from inside with 3 engines in view
Proposal Report for 18 MWe Power Plant setup at Cairn India Site.
BLACK STONE TERRY ENGINEERING COMPANY
SYSTEM INTEGRATORS & EPC CONTRACTORSClose up of engine from engine side
Proposal Report for 18 MWe Power Plant setup at Cairn India Site.
BLACK STONE TERRY ENGINEERING COMPANY
SYSTEM INTEGRATORS & EPC CONTRACTORSClose Up of Generating set control panels
Power plant cooling system
Proposal Report for 18 MWe Power Plant setup at Cairn India Site.
BLACK STONE TERRY ENGINEERING COMPANY
SYSTEM INTEGRATORS & EPC CONTRACTORSRO filtration plant for cooling plant
Proposal Report for 18 MWe Power Plant setup at Cairn India Site.
BLACK STONE TERRY ENGINEERING COMPANY
SYSTEM INTEGRATORS & EPC CONTRACTORSvvyvy
ne
Key points for consideration
Plant is ready to be dismantled and shipped,
4.10 5 units will be required to meet the needs
Dismantling of each unit will take around 5-7 days of time.
Dismantling & packaging of 4-5 units will take around 30 days of time.
Transit from the source to Kandla Port will take around 32-35 days.
Unpacking of unit and preparation of site will take 45-60 days.
Installation & Commissioning of units on site will take 45-60 days.
Complete project will take around 6-8 months for completion.
Proposal Report for 18 MWe Power Plant setup at Cairn India Site.
BLACK STONE TERRY ENGINEERING COMPANY
SYSTEM INTEGRATORS & EPC CONTRACTORS