NOTES

IL116.000 1. ALL DIMENSION ARE IN MILLIMETER. ALL LEVELS ARE IN METER.


A B C D F 2. SEISMIC ZONE: III AND BASIC WIND SPEED: 47M/ SEC.
(6+6) - Y10 AT 125 C/C 1245 3005 3005 2000 B2 3. GRADE OF MATERIAL -
HOOP BAR & BTM Y8 AT 125 C/C IL115.300 3.1 USE OF CONCRETE M25 FOR THE STAGING AND FOUNDATION (GET THE MIX
IL120.050 13 DESIGN APPROVED BY ENGINEER-IN-CHARGE BEFORE EXECUTION)
Y8 AT 125 C/C HOOP BAR Y8 AT 70 C/C B/W

550
RADIAL BAR AT TOP 3.2 Y DENOTES TMT HIGH YIELD STRENGTH DEFORMED BARS OF GRADE (FE
500) CONFIRMING TO IS 1786: 2008 WITH ELONGATION MORE THAN 14.5% AND
CAPACITY OF TANK 200 KL 1 MANUFACTURER SHALL SUPPLY THIS SAME.
1245

8610
3.3 P.C.C. AS PER NIT OR MINIMUM M-15 AND 100MM THICK WITH MINIMUM
AS PER FABRICATOR ASSUMED TANK DIA. Ø 8.61M PROTECTION OF 100MM.
4050

2
500

B1 B1 3.4 THE GRADE OF CEMENT SHOULD BE OPC/PPC 43 IN CONCRETE WORK.


LAPPING ZONE OF BARS AS 4. ACCORDING TO GEO-TECH REPORT OF SITE LOCATION SBC OF SOIL - 110 KN/m2
PER SITE CONDITION SPACING

2200
AT 2.0 M DEPTH.
5
47

RAILING B1
3005

B1 B2 OF RINGS IN LAPPING ZONE 5. FOUNDATION SHALL BE REST ON GOOD SOIL. IT SHOULD NOT REST ON BLACK
R4

IL116.000 NOT MORE THAN 100 C/C Y8 AT 190 C/C B/W COTTON SOIL OR ON SOIL HAVING EXPANSIVE PROPERTIES. AFTER
EXCAVATION UP TO GIVEN DEPTH, SOIL STRATA SHALL BE VERIFIED BY SOIL
700

IL115.300 CONSULTANT AND ENGINEER-IN-CHARGE FOR GIVEN FOUNDATION SYSTEM.


B2 B2 EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM SOIL
CUTOUT FOR INLET OUTLET
3 CONSULTANT AND ENGINEER-IN-CHARGE.
OVERFLOW & DRAIN
Y10 AT 150 C/C 6. CARE SHALL BE TAKEN TO AVOID ACCIDENTAL UPLIFT ON STRUCTURE DURING
SQ. MESH (IN BTM) CONSTRUCTION. IF GROUND WATER IS ENCOUNTERED DURING EXECUTION

550
3300

Y8 AT 70 C/C B/W CONTINUOUS DE-WATERING SHALL BE DONE TO FOUNDATION SYSTEM.


B1
3005

B1 B2 IL112.000 EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM


Y10 AT 150 C/C ENGINEER-IN-CHARGE AND SOIL CONSULTANT. KEEP FOUNDATION TRENCH IN
BR DRY CONDITION TILL IT ACHIEVES ITS FULL STRENGTH.
B/W (IN TOP) IL111.550
B1 B1 7. PROPER STORM WATER DRAINAGE SYSTEM IT BE MAINTAINED AT SITE AND
IL112.000 Y8 AT 70 C/C B/W SURROUNDING AREA TO AVOID LOCALIZED TEMPORARY WATER TABLE EFFECT.

550
4
450

IL111.550 8. ALL OPENINGS AND CUTOUTS IN SLAB SHALL BE LEFT AS PER DRAWING NO
1245

OPENING/ CUTOUT SHALL BE MADE ONCE CONCRETE IS CAST AND SHALL BE


VERIFIED BY ENGINEER-IN-CHARGE.
5 9. STRUCTURAL DESIGNER IS NOT RESPONSIBLE ANY DEVIATION ON SITE WITH
RESPECT TO THIS DRAWING AND UNWANTED ACCIDENT IN ANY CASE.
3300

VERIFICATION OF REINFORCEMENT ON SITE WILL BE PROVIDED IF


LAPPING ZONE OF BARS AS CONTRACTOR OR AGENCY SPECIFICALLY ASKED FOR. BUT RESPONSIBILITY
PER SITE CONDITION SPACING

2200
13 REGARDING CORRECT & SOUND CONSTRUCTION SHALL SOLELY REST WITH
OF RINGS IN LAPPING ZONE CONTRACTOR/ AGENCY, ENGINEER-IN-CHARGE AND CONCERN DEPARTMENT.
IL108.250 R/F DETAIL OF BOTTOM SLAB (200 THK) (M-25) NOT MORE THAN 100 C/C Y8 AT 190 C/C B/W 10. STRUCTURAL DESIGNER HAS NO LEGAL LIABILITY.
Y8 AT 125C/C (IN TOP) (B/W) Y10 AT 150 C/C (IN TOP) (B/W) Y10 AT 150 C/C (IN TOP) (B/W) 11. CORRELATE ALL LEVELS, OPENING CLEAR DIMENSION WITH DRAWING ANY
450

IL107.800
AMBIGUITY SHALL BE BROUGHT TO THE NOTICE OF DESIGNER BEFORE
200

COLUMN 300 300 300 EXECUTION.


Ø 450MM 12. DEVELOPMENT LENGTH -
12.1 IN COLUMN, BEAM AND FOUNDATION = 50 DB

550
3300

Y8 AT 70 C/C B/W
700

700

700
12.2 VERTICAL AND OTHER = 50 DB
BRACE BEAM IL108.250
150

300X450 (TYP.) 13. LD* = LD + 10 DB WHERE DB IS DIAMETER OF BAR.


(6+6)Y10 AT 125 C/C Y10 AT 150 C/C BR 14. IN CASE OF ANY DISCREPANCY IN THE DRAWING CONTACT STRUCTURAL
HOOP BAR TOP & BTM SQ. MESH (IN BTM) IL107.800 DESIGNER BEFORE EXECUTION.
IL104.500 Y8 AT 70 C/C B/W 15. NOT MORE THAN 50 % OF AREA OF STEEL BARS SHALL BE SPLICED AT ANYONE

550
450

IL104.050 SECTION.
SECTION 13-13 16. FOR NUMBER OF BAR ROUND UP THE VALUE UP TO NEAREST DIGIT WITH
RESPECT TO SPACING AND LENGTH.
17. ANCHORAGE OF ZINCLUME WATER TANK SHALL BE CONFIRMED BY TANK
MANUFACTURES.
3300

450 450
GL 100.000
LAPPING ZONE OF BARS AS CENTERING

2200
HOOP-4-16 (TH.) PER SITE CONDITION SPACING 18. THE CENTERING FOR STRUCTURAL MEMBERS SHALL NOT BE REMOVED
3253 (ARC)
OF RINGS IN LAPPING ZONE BEFORE CONCRETE SHALL ARCHIVED A CUBE CRUSHING STRENGTH AT 7 DAYS
Y8 AT 190 C/C B/W
IL100.750 C1 4 - Y16 (TH.) C1 NOT MORE THAN 100 C/C AGE ATLEAST 68% OF ITS FINAL CUBE CRUSHING STRENGTH. IN NORMAL
450
450

IL100.300 CASED WHERE OPC IS USED FORMS MAY GENERALLY BE REMOVED AFTER THE
IL100.000 GL100.000 2L-Y10 AT 100 C/C FOLLOWING PERIOD.
18.1 SLAB: SPANING UP TO 45M - 7 DAYS SPANING UP TO 6M - 14 DAYS.
2000

650
11 12

550

550
18.2 BEAMS SOFIT: WITH PROPES LEFT UNDER 7 DAYS.
PLINTH PROTECTION

550
IL 98.650 Y8 AT 70 C/C B/W 18.3 COLUMN: 24 HOURS.
IL104.500 18.4 VERTICAL SIDE OF BEAMS: 48 HOURS. THE NUMBER OF PROPES & THEIR
IL 98.000 SIZES SHALL BE SUCH THAT SO AS TO ABLE TO CARRY THE FULL DEAD LOAD
BR
HOOP-4-Y16 (TH.) IL104.050 OF STRUCTURAL MEMBERS & ALSO THE LOAD DUE TO THE CONCRETING &
A A A A
ELEVATION A-A Y8 AT 70 C/C B/W
OTHER CONSTRUCTION OPERATION. SITE-IN-CHARGE WILL BE FULL
SECTION 11-11 RESPONSIBLE FOR THE SAME.

550
12 (HOOPS) Y8 AT 100C/C (OUTSIDE)

LEGENDS
11 (HOOPS) Y8 AT 100C/C (INSIDE)

A B C D E 11 12 HOOP-4-Y16 (TH.)
I E/F EACH FACE V SB STAIR BEAM
1245 3005 3005 1245 4 - Y16 (TH.)

2L-Y10 AT 100 C/C


450 II C/C CENTRE TO CENTRE VI TYP TYPICAL
RAFT BEAM RB-3 (450X650) (M-25)
LAPPING ZONE OF BARS AS III R/F REINFORCEMENT VII TB TIE BEAM
GL100.000 PER SITE CONDITION SPACING

2200
1 IV RB RING BEAM VIII BTM BOTTOM
OF RINGS IN LAPPING ZONE

650
CENTERLINE OF COLUMN
178 - Y10 AT 150C/C
1245

NOT MORE THAN 100 C/C Y8 AT 190 C/C B/W


REINFORCEMENT LENGTH AT JUNCTION

RADIAL BARS
2 I A 300
R4475
R 55

HOOP-4-Y16 (EX.)
CLEAR COVER
00

HOOP-4-Y16 (TH.)
R425

5
02
3005

R4

550
I TOP SURFACE OF BTM SLAB 30 VII STAIR BEAMS (BRACKETS) 30
75 SECTION 12-12 Y8 AT 70 C/C B/W
29 IL100.750
R II BTM SURFACE OF BTM SLAB 30 VIII SIDE COVER BEAM 25
BR

2000
III TOP SURFACE OF BTM SLAB 30 IX SIDE COVER FOOTING 40
3 IL100.300
14 14 Y8 AT 70 C/C B/W IV BTM SURFACE OF BTM SLAB 30 X STAIRCASE WAIST SLAB 25
RB - 3 450X650 IL100.000

550
V COLUMN 40 XI ANNULAR RAFT 50
INNER PROTECTION - 11 Y8 AT 100 C/C HOOPS
3005

Y8 AT 190 C/C B/W VI BRACE BEAM 30 XII BALCONY BOTH SURFACES 30


OUTER PROTECTION - 12 - Y8 AT 100 C/C HOOPS

550
178 - Y10 AT 150C/C RADIAL BARS
M/S VINDHYA TELELINKS LIMITED

650
GAJA ENGINEERING PVT.LTD JV

550
4

400
IL 98.650 Y8 AT 70 C/C B/W

100
250
1245

EXECUTIVE DIRECTOR
DETAIL AS PER CLIENT : AGENCY : IVPS INFRA PVT. LTD.
STATE WATER & SANITATION MISSION HAMAMI GANGE & RURAL WATER SUPPLY
DEPARTMENT GOVERNMENT OF UTTAR PRADESH LUKHNOW UTTAR PRADESH 13/123, Manash Nagar, Bara, Rewa (M.P.)
5 SECTION 14-14 226001
1050 450 1000 IL 98.000
DESIGNING OF WATER TANK STRUCTURE CONSISTING OF STRUCTURE FRAME AND A PLATE
2500
FORM TO RECEIVE PREFABRICATED ZINCLUME WATER TANK AT SHEHARI
PLAN OF FOOTING (M-25) GRAMPANCHYAT, BLOCK BHIYAWAN, DIST. AMBEDKAR NAGAR STATE UTTAR PRADESH
SECTION 14-14
R/F DETAILS OF RAFT SLAB TIES STARTING ENDING
S. NO TYPE COLUMN ALUM ZINC TANK OF CAPCITY 200 KL AT 16M STAGING AT SHEHARI GRAMPANCHAYAT,
AT CENTRE AT JUNCTION LEVEL LEVEL BLOCK BHIYAWAN, DIST. AMBEDKAR NAGAR STATE UTTAR PRADESH
GENERAL PLAN OF RAFT SLAB (IL 98.00) 10-Y20
DRAWING NO. IVPS/VTL/ABD/200KL/16M/003/DR00 (SHEET NO. 2/2)