NOTES

1. ALL STRUCTURAL DRAWINGS SHALL BE READ IN


CONJUCTION WITH CORRESPONDING
ARCHITECTURAL DRAWINGS.
E G 2. ALL PLAIN AND R.C.C. CONSTRUCTION SHALL
CONFIRM TO IS 456 : 2000.
A B C D F H I J 3. SEISMIC ZONE III IS CONSIDERED.
4. METHOD OF ANALYSIS IS STAAD PRO. WITH LIMIT
4930 2615 2935 2350 3583 2628 4919 STATE DESIGN.
5. DISCREPANCY IF ANY SHALL BE BROUGHT TO THE
650 1700 650 NOTICE OF CONSULTANT BEFORE EXECUTION OF
WORK.
6. IN CASE OF SUBSTANTIAL CHANGE IN LOADING
PATTERN STRUCTURAL CONSULTANT ARE TO BE
9 REFERRED.
925 C4 C5 C6 C7 7. EXPOSURE CONDITION ADOPTED IS SEVERE
C3 C8 8. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS
8 COLUMN SCHEDULE
C9 C10 OTHERWISE SPECIFIED.
NOTES:
9. GRADE OF CONCRETE MIX SHALL BE M 30 MACHINE
2000

1. Z1 = SPECIAL CONFINING ZONE AS PER IS 456 + IS 13920 - 2016,


MIXED & VIBRATED.
2710

2. Z2 = REMAINING ZONES AS PER IS 456 + IS 13920 - 2016


3. COLUMN NOS. C17 & C18 ARE DELETED AND ARE NOT IN USE. 10. REINFORCEMENT SHALL BE TMT BARS OF GRADE Fe :
4. GRADE OF STEEL -M30:Fe500 500D CONFORMING TO IS 1786 :1985
7 11. NORMAL COVER TO OUTERMOST REINFORCEMENT
710

C11 C12
25.2M SHALL BE AS UNDER
6 (a) FOR FOOTING = 60 mm
C13 C14 C16 C17 LINKS LINKS LINKS
C15 C18 TO (b) FOR COLUMN = 50 mm
T8 @ 250 T8 @ 250 T8 @ 250
SCR ZONE SCR ZONE SCR ZONE 13. LAP LENGTH IN REINFORCEMENT BARS SHALL BE 50
3020

T8@100 C/C T8@100 C/C T8@100 C/C TIMES THE DIA OF BARS.
14. DESIGN IS SUITABLE FOR FOR ONE ADDITIONAL
750 750 750
27.3M STOREY AS PER APPROVED GAD

350
350

350
T16 T16 T16 15. REFER APPROVED GAD FOR ANY DIMENSIONAL
MISMATCH
5 12-T16 12-T16 12-T16 16. 230 MM BRICK WALL BETWEEN GROUND BEAM AND
C19 C20 C22
1265

C21
PLINTH BEAM SHOULD BE BE PROVIDED, WHERE
22.05M REQUIRED.
4 C23 C24 TO
C25 C26 LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS
1315

T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 REFRENCE CODES
T8 @ 250
SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE 1. IS - 456
3 T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C 2. IS - 875
C27 C30 750 750 300 750 750 750 750 750 750 750 3. IS -13920
C28 C29 25.2M
4. IS - 1893

350

350

350

350

350

350

350

350

350
T16 T16 T16 T16 T16 T16 T16 T16 T16 T16

300
2880

12-T16 12-T16 4-T16 12-T16 12-T16 12-T16 12-T16 12-T16 12-T16 12-T16

18.90M

2 TO LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS
C31 C32 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250
C33 C34 C35 C36 SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE
T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C
750 750 300 750 750 750 750 750 750 750
22.05M
3775

350

350

350

350

350

350

350

350

350
T16 T16 T16 T16 T16 T16 T16 T16 T16 T16

300
12-T16 12-T16 4-T16 12-T16 12-T16 12-T16 12-T16 12-T16 12-T16 12-T16
15.75M
1 TO LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS
C37 C38 C1 C2 C39 C40 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250
SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE
T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C
COLUMN LAYOUT 18.90M
750 750 300 750 750 750 750 750 750 750
SCALE-1:100

350

350

350

350

350

350

350

350

350
T16 T16 T16 T16 T16 T16 T16 T16 T16 T16

300
12-T16 12-T16 4-T16 12-T16 12-T16 12-T16 12-T16 12-T16 12-T16 12-T16

12.6M
TO LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS
T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250
SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE
T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C
750 750 300 750 750 750 750 750 750 750
15.75M

350

350

350

350

350

350

350

350

350
T16 T16 T16 T16 T20 T16 T16 T16 T16 T16

300
14-T16 14-T16 4-T16 14-T16 16-T20 14-T16 14-T16 14-T16 14-T16 14-T16
1 2 3 4 5 6
9.45M
4660 5845 3000 5845 4660
TO LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS
T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250
SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE
T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C
750 750 300 750 750 750 750 750 750 750
WATER TANK MUMTY 12.6M

350

350

350

350

350

350

350

350

350
T16 T16 T16 T16 T20 T16 T16 T16 T16 T16

300
950

FFL+22.05
Terrace Floor 14-T16 14-T16 4-T16 14-T16 16-T20 14-T16 14-T16 14-T16 14-T16 14-T16

6.3M
3150

TO LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS DRAWING NO. : D137/LOT-I/VR/QTR-TYP-II /001/R0 (SHEET 2/7)
FFL+18.90 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250
SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE Railway:
Sixth FLoor T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C
WESTERN RAILWAY
750 750 300 750 750 750 750 750 750 750 MUMBAI - DIVISION
9.45M
3150

T16 T16 T16

350

350

350

350

350

350

350

350

350
T20 T20 T20 T20 T25 T16 T16 Station:

300
Project Title:
T16
FFL+15.75 16-T20 4-T20 + 10-T16 4-T20 16-T20 16-T25 14-T16 14-T16 14-T16 14-T16 14-T16
VIRAR-DAHANU ROAD VIRAR STATION
QUADRUPLING
Fifth FLoor
Z1(end)

3.15M
3150

LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS Drawing Title:
>= hc/4

TO T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250
SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE
PROPOSED 01 BLDG S+6 TYPE -II
FFL+12.60
T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C QUARTERS (TOTAL 24 UNITS).
Fourth FLoor
6.3M
750 750 300 750 750 750 750 750 750 750 COLUMN LAYOUT AND RCC DETAILS
T16 T16

350
350

350

350

350

350

350

350

350
T20 T25 T16 T20
3150

T20 T20 T20 T20

300
T16 T16 T16
Z2(cent.)

16-T20 4-T20 + 10-T16 4-T20 16-T20 16-T25 14-T16 4-T20 + 10-T16 6-T20 + 10-T16 14-T16 16-T20
SPLICE

FFL+9.45 AECOM - CEG Joint Venture


hc

9TH FLOOR, INFINITY TOWER C DLF CYBER CITY,


Third FLoor 0.15M DLF PHASE II GURGAON 122002, INDIA

TO
3150

LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS DATE :
T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250
SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE DRAWN (A) DESIGNED (B) CHECKED (C) APPROVED (D)
FFL+6.30 T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C
Second FLoor 750 750 300 750 750 750 750 750 750 750
3.15M
>= hc/4

T16
350

350

350

350

350

350

350

350
T25 T20 T25 T25 T32 T20 T20 T25

300

350
T20
3150

T20 T16 T20 T25 T16 T16 T20 T16


Z1(end)

10-T25 + 6-T20 4-T20 + 12-T16 4-T25 10-T25 + 6-T20 4-T32 + 12-T25 8-T20 + 8-T16 10-T20 + 6-T16 6-T25 + 10-T20 6-T20 + 10-T16 16-T20
FFL+3.15
-1M
First FLoor
LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS LINKS MUMBAI RAILWAY
3000

TO
T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 T8 @ 250 VIKAS CORPORATION
SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE SCR ZONE
± 0.060 + 0.15 T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C T8@100 C/C
Stilt FLoor 750 750 300 750 750 750 750 750 750 750
Paved Level will +0.15M
T16 PROOF CHECKED BY
350

350

350

350

350

350

350

350

350
T25 T20 T25 T25 T32 T20 T20 T25 T20
300

be 0.6 m above T16


T20 T16 T20 T25 T16 T16 T20
from Existing
/Proposed Road 10-T25 + 6-T20 4-T20 + 12-T16 4-T25 10-T25 + 6-T20 4-T32 + 12-T25 8-T20 + 8-T16 10-T20 + 6-T16 6-T25 + 10-T20 6-T20 + 10-T16 16-T20
REINFORCEMENT IN COLUMNS :
Level COLUMN C1, C2 C3,C4,C5,C6,C7, C9,C10,C11,C12 C13, C14, C17, C15,C16 C19, C22, C27, C20, C21, C24, C28, C33,
SCALE-1:50
ELEVATION MARKED C8,C37, C18, C31, C32, C30 C23,C26 C25 C29 C34
SCALE-1:150 C38,C39,C40 C35, C36
V. S. WADEKAR
E. D. (CIVIL)/ MRVC STRUCTURAL CONSULTANT

M.D. DIXIT A.V. KULKARNI


XEN / MRVC AGM (CIVIL)/MRVC

SPE / MRVC

You might also like