The document is a design check list and adequacy check list for verifying an existing structural design. It contains 18 checklist items related to calculations, drawings, and compliance. Key points checked include using the latest design basis for loads, serviceability, and connections; identifying failed sections; checking footings for additional loads; and providing scope clouds and notes for modifications and repairs. The checklist indicates compliance with most items is yes, except for item 4 regarding site visit verification.
A Review of the Utilization of reinforcement learning and Artificial Intelligence techniques for Buildings Heating, Ventilation, and Air Conditioning Automation System: building industry, #0
The document is a design check list and adequacy check list for verifying an existing structural design. It contains 18 checklist items related to calculations, drawings, and compliance. Key points checked include using the latest design basis for loads, serviceability, and connections; identifying failed sections; checking footings for additional loads; and providing scope clouds and notes for modifications and repairs. The checklist indicates compliance with most items is yes, except for item 4 regarding site visit verification.
The document is a design check list and adequacy check list for verifying an existing structural design. It contains 18 checklist items related to calculations, drawings, and compliance. Key points checked include using the latest design basis for loads, serviceability, and connections; identifying failed sections; checking footings for additional loads; and providing scope clouds and notes for modifications and repairs. The checklist indicates compliance with most items is yes, except for item 4 regarding site visit verification.
The document is a design check list and adequacy check list for verifying an existing structural design. It contains 18 checklist items related to calculations, drawings, and compliance. Key points checked include using the latest design basis for loads, serviceability, and connections; identifying failed sections; checking footings for additional loads; and providing scope clouds and notes for modifications and repairs. The checklist indicates compliance with most items is yes, except for item 4 regarding site visit verification.
General 1 Existing calculations used for adequacy check
General 2 Existing drawings used for adequacy check General 3 Existing geotechnical report or New geotechnical report available for verification Calculation 4 Site visit verification completed Calculation 5 pipe loads from approved Stress analysis used Calculation 6 Latest Design basis used for verifying Wind, Seismic Loads, Temperature loads and Load combinations Calculation 7 Latest Design basis used for Serviceability checks (Eg: Deflection) Calculation 8 Failed sections identified with uitilization ratio Calculation 9 New members used for replacing failed sections and shown safe Calculation 10 Existing Connections checked for increased loads against their inherent capacities Calculation 11 Footings checked for additional loads and identified unsafe footings Calculation 12 Footings with modifications are checked for design compliance Drawings 13 Scope cloud provided for all new members 14 Scope cloud provided for all modified sections 15 Note provided for repairing and reinstating existing fire proofing if required 16 Connection design forces including minimum forces provided for fabrication 17 Foundation modification requirements shown with adequate notes where required 18 Method statement provided for repair and modifications