Project No.

: AMP-339 Project Name : IMPROVEMENT OF SHEIKH AMMAR

DATE: ______________

TRAFFIC MANAGEMENT AND TEMPORARY DETOUR


HSE CHECKLIST

Sr. Condition
Detour's Element Remarks
No. x IDLH* N/A
Does the Traffic Police or Local Authority Permit
1.
is available on site?
Does the traffic signed and traffic arrangement is
2. comply with the approved traffic management or
temp. detour drawing?
Does the regular traffic or detour maintenance
3. person in charge is assigned and does he
monitoring on regular basis?
4. Advance warning signs boards.
5. Roadwork signs boards.
6. Guide signs boards.
7. Digital or LED* signs boards.
8. Arrows signs boards.
9. Delineators.
10. Cones.
11. Tubular flexible posts (bollards).
12. Painted pavement markings.
13. Raised pavement markings.
14. Water filled plastic barriers is adequate
15. Concrete barriers.
16. Longitudinal crashworthy barriers
17. Warning lights/ Street lighting.
18. Temporary traffic lights.
19. Rumble strips
20. Crash cushion (shock absorber)
21. Buffer zones/ tapers
22. Flaggers
23. Red flags / paddles
24. Pedestrian walkways.
25. Construction lane access / egress
26. Fences
27. Turning radius and lane width.
28. Glare screens

Inspected &
Date Signature Comment
Reviewed by
Inspection by:
HSE Officer/Advisor
Traffic Coordinator

Review by:
HSE TL / Engineer