GENERAL DIRECTORATE OF CIVIL DEFENCE

MINISTRY OF THE INTERIOR, STATE OF QATAR


PLAN SUBMISSION – COMPLIANCE REPORT

Proposed Development: 

PROPOSED SECONDARY SCHOOL (B+G+2) BUILDING

Location: AL WUKIR       PIN: 91012064  PS‐


N/2019/0006037 
GULF CONSULTANT GROUP CONSULTATIONS  
Fire Fighting Pkg’s.  COMPLIANCE ‐ 01

REVIEW  QCD DIRECTION/REVIEW COMMENTS  CONSULTANT/S RESPONSE/COMPLIANCE 


ITEM 
1.   Outline in site plan location of fire pump  Comment complied. Refer to updated drawing. 
room and fire water tank. 
2.   Part plans may not be provided since  Noted. 
drawings and layout can be seen in overall 
plans. 
3.   Clarify why the whole pool area in  There is no combustibility material in swimming pool area 
basement was not provided with  and no heat release are expected above swimming water. 
automatic sprinkler protection  Only around pool water is protected by sprinklers. 
4.   Check and clarify non provision of 
automatic fire extinguishing system (wet 
Comment complied. Control room, LV room  and telecom 
or other type) in telecom room in 
room are protected by Aerosol ; remaining are protected 
basement, electrical rooms and ELV rooms 
by wet sprinklers. Refer to revised Dwg. 
in ground, first and second floors given 
that its areas are more than 5.1 sqm. 
5.   Based on section drawings, depths of 
ceiling void spaces in basement and toilets 
in ground floor are more than 800 mm. 
Comment complied. Additional upright sprinklers provided 
Clarify non provision of void ceiling 
in void spaces more than 800 mm. 
sprinklers. Check and ensure compliance 
to QCD guidelines for sprinklers in 
concealed ceiling and raised floor spaces. 
6.   Provide section B‐B as per approved life 
safety drawings and show depths of ceiling 
Comment complied. 
voids with corresponding sprinkler 
installation orientation. 
7.   Update concealed ceiling/blind space 
Comment complied. 
table in cover page. 
8.   Check and verify non provision of sprinkler 
in some toilets. Please note exemptions 
Comment complied to be fully protected by sprinklers.
on sprinkler provision in small bathrooms 
applies in dwelling units only. 
9.   As per approved life safety drawings,  ‐ According to QCDD ‐ Regulation 2022 section 
substation is to protected with clean agent  “SUBSTATIONS ‐ ELECTRICITY AND DISTRIBUTION 
suppression system and kitchen is to be  NETWORKS” clause No. 2.2, and transformers 
Protected with kitchen hood suppression.  rooms need only fire extinguishers. 
Please provide information.  ‐ L.V room protected by aerosol system 

Page 1
GENERAL DIRECTORATE OF CIVIL DEFENCE
MINISTRY OF THE INTERIOR, STATE OF QATAR
PLAN SUBMISSION – COMPLIANCE REPORT

‐ Comment complied for kitchen hood. It is just a 
note in our drawings and will be done by 
manufacturer recommendation. 
10.   Please provide information on the 
automatic sprinkler protection for the high  Side wall sprinklers provided in ground floor to protect this 
ceiling main entrance. No sprinklers cover  area. 
the area. 
11.   Check and verify design criteria. Light 
hazard is declared but 0.15 gpm/ft2 is 
used. Include in design criteria for 
basement parking. 
The following calculation are provided: 
12.   Providing separate hydraulic calculation 
Sprinkler calculation for roof floor (light hazard). 
for sprinklers in basement (ordinary 
Sprinkler calculation for basement floor (ordinary hazard). 
hazard), upper floors (light hazard) and for 
Fire hose reels at roof floor. 
fire hose reel system. Show results in the 
summary of hydraulic calculation. Identify 
in plans sprinklers considered for hydraulic 
calculation. 
13.   Update affected drawings. Submit  Noted. 
compliance report signed by consultant 
with clarifications to comments 
14.   Update detailed design report accordingly  Noted. 
and include other automatic fire 
extinguishing system (if provided). Have it 
signed by consultant and owner. 
 
 
 