Highway RFI summery

Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 31.430 at 0ld taminglong to km 43.480
NAME OF THE PROJECT
ending near Phelong (Length-12.050 km) (Package-3) on EPC mode

NAME OF THE AUTHORITY : National Highways & Infrastructure Development Corporation Limited (NHIDCL)

: Kalyan toll infrastructure LTD.


NAME OF THE EPC CONTRACTOR
DATE OF DATE OF
S.no. RFI NO. FROM TO LENGTH(M) SIDE DESCRIPTION
SUBMISSION INSPECTION
INSPECTION TIME REMARK

WMM Top Layer Level


KTIL/TML/PKG-3/HWY/1921 38+150 38+500 350 30-Dec-22 31-Dec-22 9:50 AM
1 BHS Checking & FDD Testing
WMM Top Layer Level
KTIL/TML/PKG-3/HWY/1922 38+600 39+000 30-Dec-22 31-Dec-22 11:40 AM
2 400 BHS Checking & FDD Testing
WMM Top Layer Level
KTIL/TML/PKG-3/HWY/1923 39+000 39+320 30-Dec-22 31-Dec-22 10:20 AM
3 320 BHS Checking & FDD Testing
WMM Top Layer Level
KTIL/TML/PKG-3/HWY/1924 34+780 35+020 240 BHS 30-Dec-22 31-Dec-22 11:50 AM
4 Checking & FDD Testing