1.5. Vulcanian - Bangchak Corporation Public Co.,Ltd.
1.5. Vulcanian - Bangchak Corporation Public Co.,Ltd.
1.5. Vulcanian - Bangchak Corporation Public Co.,Ltd.
Management
System
By VULCANIAN
Our Team Members #AsGreenAsBangchak
Muhamadriduwan Phalawan
Education: BEng
Experience: 11 Years
Motto
“ As Green
As Bangchak ”
EDS Responsibilities #AsGreenAsBangchak
Engineering Service/Standard
Project
Tank Repair
Turnaround Maintenance
PDCA Cycle
2017
STEPS MAY JUN JUL AUG
plan
1 Establish team
plan
2 Collect & select problem(s)
P
LAN
plan
3 Survey & set objective(s)
plan
4 Analyze problem(s)
plan
5 Set up action plan
D O
plan
6 Implement solution(s)
plan
C HECK 7 Follow-up on results
plan
8 Design improvement concept
A CT
plan
9 Implement
* 30-minute meeting / twice a month
Problem Survey #AsGreenAsBangchak
PROBLEMS EFFECTS
High tank maintenance cost - Increase in maintenance cost
High VOC leakage during tank cleaning - Environmental effect
- Community complain
- Longer working duration
Dust and noise from blasting - Environmental effect
- Community complain
Pipe misalignment - Risk of Leakage
- Out of standard
Delays in the Procurement process - Project delay
Selection Criteria #AsGreenAsBangchak
CRITERIA 1 2 3
Environmental
Frequency Cost effect Time loss
effect
Community complaint
Total
Internal complaint
Issues
6-12 times/year
> 12 times/year
< 6 times/year
Scores
7 – 14 days
Not effect
> 14 days
1 – 5 MB
< 7 days
> 10 MB
< 1 MB
1 2 3 1 2 3 1 2 3 1 2 3
4. Pipe misalignment - ✓ - - ✓ - ✓ - - ✓ - - 4
Continuous Improvement
EPA Air Pollution Control Cost Manual, Section 6, Chapter 2 – Wet Scrubbers (Sixth Edition).
Fishbone Diagram #AsGreenAsBangchak
Man Method
Target #AsGreenAsBangchak
Release
LESS THAN 100 PPM
of VOC concentration
Project Idea #AsGreenAsBangchak
Calculation #AsGreenAsBangchak
Fluid
Volume flow rate (m3/hr)
Water
5.450993
Calculation #AsGreenAsBangchak
From Pump
To Header
Pipe sch. 1-s80
Pipe Material PVC
Pipe Length (m.) 120
K Ball valve 0.06 EA
K Butterfly valve 0.86 EA
K Gate valve 0.15 1 EA
K Globe valve 0 1 EA
K Elbow 0.57 20 EA
K TEE 1.14 EA
K Swing Check valve 1.9 EA
10280
28.8
“near ZERO” VOC
at scrubber Outlet
VOC
(Not scaled) Sat Mon Tue Wed Thu
Preparation 1 2
Circulation +Ventilation
Ventilaltion 4 7
Jet cleaning 2 2
Manual clean 3 3
Non-financial Award
Bibliography #AsGreenAsBangchak
U.S. EPA, Office of Air Quality Planning and Standards (2003). Air Pollution Control
Technology Fact Sheet: Spray-Chamber/Spray-Tower Wet Scrubber. EPA-452/F-03-016.
Johnstone, H. F., & Williams, G. C. (1939). Absorption of Gases by Liquid Droplets Design of
Simple Spray Scrubbers. Ind. Eng. Chem.
Akbar, M.K., Ghiaasiaan, S.M. (2004). Modeling the gas absorption in a spray scrubber
with dissolving reactive particles. Chem. Eng. Sci. 59.
Wylock, C., Colinet, P., & Haut, B. (2012). Gas absorption into a spherical liquid droplet:
Numerical and theoretical study. Chemical Engineering Journal.
#AsGreenAsBangchak
QCC 2018
Delays in the Procurement process
#AsGreenAsBangchak
Basis
• Water treatment 0.3 USD/m3
• Waste treatment 100 USD /Ton + transport fix cost 300 USD/trip