Plant Load Calculation
12 MN 65,000
1 AM 61,300
2 AM 54,000
3 AM 50,800
4 AM 45,000
5 AM 45,000
6 AM 49,000
7 AM 51,300
8 AM 54,800
9 AM 57,300
10 AM 59,800
11 AM 60,000
TIME, HRS
12 NN 64,200
1 PM 68,900
2 PM 70,100
3 PM 74,600
4 PM 79,900
5 PM 81,000
6 PM 83,745
7 PM 81,200
8 PM 80,000
9 PM 78,000
10 PM 75,300
11 PM 70,100
12 MN 65,000
The daily energy produced is equal to the area under the curve and is computed using the
Thus,
65,000+61,300
A1 = ( )kW (1) hr 63,150 kW-hrs
2
61,300+54,00
A2 = ( )kW (1) hr 57,650 kW-hrs
2
54,000+50 , 800
A3 = ( )kW (1) hr 52,400 kW-hrs
2
50 ,800+ 45,0 00
A4 = ( )kW (1) hr 47,900 kW-hrs
2
45,000+ 49,0 00
A6 = ( )kW (1) hr 47,000 kW-hrs
2
49,000+51,3 00
A7 = ( )kW (1) hr 50,150 kW-hrs
2
51,300+54,8 00
A8 = ( )kW (1) hr 53,050 kW-hrs
2
54,800+57,3 00
A9 = ( )kW (1) hr 56,050 kW-hrs
2
57,300+59,8 00
A10 = ( )kW (1) hr 58,550 kW-hrs
2
59,800+60 , 000
A11 = ( )kW (1) hr 59,900 kW-hrs
2
60,000+64,2 00
A12 = ( )kW (1) hr 62,100 kW-hrs
2
64,200+68,9 00
A13 = ( )kW (1) hr 66,550 kW-hrs
2
68,900+70,1 00
A14 = ( )kW (1) hr 69,500 kW-hrs
2
74,600+7 9,9 00
A16 = ( )kW (1) hr 77,250 kW-hrs
2
79,900+81,0 00
A17 = ( )kW (1) hr 80,450 kW-hrs
2
81,000+83,7 45
A18 = ( )kW (1) hr 82,372.5 kW-hrs
2
83,745+81,2 00
A19 = ( )kW (1) hr 82,472.5 kW-hrs
2
81,200+80,0 00
Average Load, AL
1,560,345 kW −hrs .
AL =
24 hrs
AL = 65,014.375 kW
Average Load
LF = x 100 %
Peak Load
65,014.375 kW
LF = x 100 %
83,745 kW
LF = 0.7763 = 77.63 %