This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

195

G 3 6557
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

057 1B 057 3 BW F
195 Bui Van Hoi
2022.05.28
09:40:47
6557
+07'00'

<G>1.7

BOLT LIST
BOLT SIZE LENGTH
No (IN) (MM) Phan Van Thai
2022.12.19
18:54:21 +07'00'

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2) DIMENSIONS, LAYOUTS AND SUPPORTING OF 1.5" AND BELOW ARE INDICATVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT THE JOB SITE BEFORE FABRICATION / ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
1S3 19/12/2022 AS-BUILT MARK UP DRAWING
NO ISO of S3
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara Technip Energies, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

11 SUPPORT 1

100
STEM UP

100

S11.1
STD
SB03-A-U8-200-400
SP02-200
CG01-0.75-CS

STEM UP

Bui van Hoi


BOLT LIST 2022.06.24
BOLT SIZE LENGTH 09:27:24
No (IN) (MM)
+07'00'

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C
STEM UP
SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM
SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2) DIMENSIONS, LAYOUTS AND SUPPORTING OF 1.5" AND BELOW ARE INDICATVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT THE JOB SITE BEFORE FABRICATION / ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
DRAWING
NO ISO of S2
S1
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara Technip Energies, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

17 SUPPORT 1

S17.1
STD
SB03-A-U8-200-400
SP02-200
CG01-0.75-CS

BOLT LIST Le Van Thien


70
BOLT SIZE LENGTH 2022.06.22
No (IN) (MM)
17:04:59 +07'00'
80 STEM SOUTH

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2) DIMENSIONS, LAYOUTS AND SUPPORTING OF 1.5" AND BELOW ARE INDICATVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT THE JOB SITE BEFORE FABRICATION / ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
DRAWING
NO ISO of S2
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara Technip Energies, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

BOLT LIST
BOLT SIZE LENGTH
No (IN) (MM)

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2) DIMENSIONS, LAYOUTS AND SUPPORTING OF 1.5" AND BELOW ARE INDICATVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT THE JOB SITE BEFORE FABRICATION / ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
DRAWING
NO ISO of S2
S1
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara Technip Energies, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia

You might also like