VACUUM BREAKER

TG OIL
COOLERS HP HYDRAULIC SYSTEM
2x100% COOLERS

STEAM TURBINE STEAM TURBINE


HP PART IP part
GEAR
STEAM TURBINE
BOX LP part
AIR COOLED CONDENSER

V. VI.

Sifon IV.
S-trap III.
min 1 m II.
I.

Sifon
S-trap
min 1 m
M

Sifon
S-trap
min 4 m

Sifon
Sifon S-trap
S-trap min 1.2 m
min 1.2 m

Sifon
S-trap
min 1.2 m
KKS coding and field
M instrumentation are for
information only and will be
precised during design stage.
M

VSC FAN
Sifon
S-trap
min 1 m
2x100% M

RECOVERY
CONDENSATE
M
TANK
Sifon Sifon
S-trap S-trap
min 1.2 m min 1.2 m
Sifon
S-trap
min 1.2 m

ELECTRIC STEAM HEATER

CONDENSATE PUMPS
M

M
Sifon
S-trap
VENT STEAM
min 1.2 m CONDENSER M

M
M
FLASH TANK

FLASH TANK

Sifon
S-trap
min 1.2 m

FLASH TANK PUMPS

03.08.2015 23.11.2015 23.11.2015 09.12.2015


Data update for building e

15.04.2015 20.07.2015 20.07.2015 23.07.2015


Changed design data of HP, IP nozzle adaptor drainage pipeline d

13.01.2015 07.04.2015 07.04.2015 08.04.2015


Instrumental air connection changes, added flash tank 2 c

29.10.2014 05.01.2015 05.01.2015 06.01.2015


ISA coding, PID optimization, added drainages between flaps b

ISA coding, PID optimization, bleeds drainages aded to scope a

Vypracoval Kontroloval HIP


Rev.
Nature of Revision Elaborated by Checked by Approved by Chief Engineer
Projekt/Project

N CSP Atacama 1 - 110 MW

Steam-water P&ID
29.10.2014
P100170 For Construction M01
Skup. dok. Vypracoval Kontroloval HIP
Project No. Design Stage Doc. Group Elaborated by Checked by Approved by Chief Engineer

Pt6008795_1_e_3.dwg Sheet No.:


1 Sheets: 1

0186-PLN-DSP-025-071-0001-02 5
Pt6008795 e
Rev.