Professional Documents
Culture Documents
Project Engineer 01
Project Engineer 01
1. In pile driving, when the desired penetration cannot be obtained by driving alone, other schemes are
used. Which of the following is not acceptable?
a. Water jets
b. Pilot holes
c. Both jet and holes
d. Square hole