Sarawak - Job Safety Analysis (JSA) Status: Approved

Job: Concrete cutting using engine driven concrete cutter equipment Job Owner: Construction JSA No. Sarawak-JOB-2022-01278
Work Location : BORF RECEPTION BUILDING AREA Last updated: 05/08/2022
General Safety Precaution/Resources required for the job: JSA team member:
1. All personnel must wear basic PPE required for the job. 1. joshua emang
2. Conduct and maintain housekeeping and make the area safe to work. 2. Elfera Mauris
3. To apply stop-work authority for unsafe act/condition and report to Supervisor. 3. Chia Shuck Ping
4. Ensure all colleagues are fit to work and not under drug & alcohol influence. 4. Chung Tech Poh
5. Inspect tools and equipment before use. 5. Sarkawi Ahmad
6. Indang Jenggeng
7. Stewad Akau

Related LSR/PSR
(Tick mose
appropriate)

Potential Initial Residual Action Verified


Work Step Work Activities Top Event Barriers & Mitigation
Hazards Risk Risk Party By
Work preparation barricade work area, Manual materials Incorrect manual MEDIUM - New employee training program LOW Work leader
marks the existing handling handling (2E) on related ergonomic hazards (1B)
concrete and preparation - Provide adequate manpower
of equipment / tools - Provide specific training for safe
work practice
- Work with buddy system for
heavy tools, material /equipment
or get mechanical aid if possible.

Slip, trip, fall Loss of control MEDIUM - Proper work LOW Work leader
(2E) instruction/procedure (1B)
- Provide specific training for safe
work practice
- Supervision by team leader
- Barricades work areas properly
and display warning sign.
- To maintain proper
housekeeping at all time.
- To ensure work material does not
block road or emergency access
walkway

JSA No. Sarawak-JOB-2022-01278 Page 1 of 4


Potential Initial Residual Action Verified
Work Step Work Activities Top Event Barriers & Mitigation
Hazards Risk Risk Party By
concrete cutting using cutting concrete Diesel fuel Ignition MEDIUM - Available of SDS LOW Work leader
engine driven concrete (2E) - Fire extinguisher available on (1B)
cutting machine site
- Tool & equipment being used is
certified
- Fire Watcher to be stationed at
operating equipment
- Fully comply with valid PTW
precautions

Flying objects Others MEDIUM - cutting blade safety guard in LOW work leader
(2E) good condition (1B)
- To wear face shield on top of
safety glass.
- full supervision by team leader

Dusts (particulate) Others MEDIUM - Hazard control measures LOW Work leader
(2E) communication (1B)
- Proper work
instruction/procedure
- Supervision by team leader
- To wear dust mask type N95
- continous wet the floor and
cutting blade to minimize dust

Loud steady noise > Others MEDIUM - Hazard control measures LOW Work leader
85 dBA (2E) communication (1B)
- Proper work
instruction/procedure
- Supervision by team leader
- Training & communication on
work instruction/procedure
- 1. Wear ear plug / ear muff

JSA No. Sarawak-JOB-2022-01278 Page 2 of 4


Potential Initial Residual Action Verified
Work Step Work Activities Top Event Barriers & Mitigation
Hazards Risk Risk Party By
concrete cutting using cutting concrete Vibration Others MEDIUM - Hazard control measures LOW Work leader
engine driven concrete (2E) communication (1B)
cutting machine - Job rotation/team work/alteration
of workplace
- Proper work
instruction/procedure
- Supervision by team leader
- Training & communication on
work instruction/procedure
- to wear handgloves when
operating the concrete cutter

Others Contact with MEDIUM - Look for any cable marker Signs LOW Work leader
Electricity (2E) before start work (1B)
- • Fully comply with valid PTW
precautions
- cutting deep is set to follow the
existing concrete thickness
- full supervision by team leader

Fatigue Others MEDIUM - Establish proper work plan LOW Work leader
(2E) - Promote regular break and (1B)
exercise
- Provide adequate manpower
- Provide job rotation /team
work/alteration of workplace

to remove concrete cut Equipment with Struck by moving MEDIUM - To cordon excavator working LOW Work leader
using excavator moving or rotating object (2E) area by install barricade and (1B)
parts e.g. engines, display signage
motors, compressors, - to provide signalman to monitor
lifting equipment etc. the work

housekeeping housekeeping of Physical condition e.g. Others MEDIUM - Hazard control measures LOW work leader
equipment , tools and pinch point, sharp (2E) communication (1B)
work material object etc. - Proper work
instruction/procedure
- Supervision by team leader
- Training & communication on
work instruction/procedure

JSA No. Sarawak-JOB-2022-01278 Page 3 of 4


Potential Initial Residual Action Verified
Work Step Work Activities Top Event Barriers & Mitigation
Hazards Risk Risk Party By
housekeeping housekeeping of Slip, trip, fall Others MEDIUM - Hazard control measures LOW Work leader
equipment , tools and (2E) communication (1B)
work material - Proper work
instruction/procedure
- Supervision by team leader

Prepared by: Prepared By Reviewed by: Reviever 1 (Line Supv.) Reviewed by: Reviewer 2 (Area Owner) Approved by: Area Authority/Field Manager
Name: BWS Engineering Sdn Bhd Name: BORF CCR Name: SHO_BORF Name: BORF OPS

Date: 04/08/2022 Date: 05/08/2022 Date: 06/08/2022 Date: 06/08/2022

JSA No. Sarawak-JOB-2022-01278 Page 4 of 4