2. B. Cost of Construction:
Total Area Sft Construction Cost Rs. (Sft Rate) Total Cost (Rs.)
1800/-
3. Construction Specifications:
S.No Item Specification
.
1. Bricks (Super structure Table mould 4” brick masonry with red burnt, light
brick Work) weight, First Class clay bricks in CM ratio 1:6 for
super structure.
2. Wall thickness All External Walls 9” thick. All Internal Walls 4.5”.
Slab thickness Slab 4 ½” for all floors or 5” (as per structural
design).
3. Cement: For frame work 53 Grade Cement Ultratech/ Bharthi/Ramco.
i.e., Footings, Columns,
Plinth Beams, Slabs etc.
4. Cement (Super Structure, 43 Grade Cement (Priya/ Penna/
Brickwork & Plastering Raasi/CCI/Birla/Chettinadu)
etc.)
5. Sand (Structure) Using River Sand from ( Kaleswaram /Nizamabad/
Karimnagar).
Sand (Plastering) Using River Sand from Kaleswaram/ Nizamabad for
first Coat CM ratio 1:5 and from Kaleswaram for
the 2nd Coat CM ratio 1:3.
Sand (Floorings) Using Robo Sand shall be used for all floorings.
The "Owners" will also pay the "Builder/ Civil Contractor" an advance of Rs. 2,00,000/- at the
time of this agreement, the amount of which will be adjusted in the first two or three payments of
instalments shown above.
Name : Name :
Place : Place :
Date : Date :
Name :
Place :
Date :
SIGNED AND SWORN IN MY PRESENCE
NOTARY (SIGNATURE & STAMP)