Reinforcement in opening

Columns Laps

No special link at crank


Link at knuckle of crank

Spacing of links at lap not Crank at bottom of lift GENERAL NOTES :


greater than: Length of crank is 10 x offset
50 1/Concrete fcu should not be less
- 12ø of longitudinal bar than ((30N/mm2))for
- 0.6 x lesser dimension of column Columns&foundations for 28days
- 240 strength and((25N/mm2)) for
50 to start to link run Beams&Slabs.
At least 3 No. links 2/Steel fy should not be less than
Nominal floor level 460N/mm.2 .
Kicker: 75 3/Max-aggregate size 20mm for
beams
Main bars rest on kicker
& cols &slabs and 30mm for
foundation.
4/Concrete cover for reinforcement
ø should not be less than 25mm
45
in beams
m
& cols & slabs and 50mm for
foundation.
5/Over laps of steel should not be
less
than 45times larger bar size &
should
always be located within concrete
being
under compression.
6/construction joint shall be located
at one fifth of span of slabs.
Cantilever 7/Slab thickness 250mm.
8/Bearing Capacity ((208 kN/m.2))
At least 50% of cantilever bars
9/ Depth of foundatoin from the
Curtailment of main cantilever bars as specified by designer
should be anchored a distance of top of the replacmen layer -3m
At least 50% of maximum area 1.5 x cantilever. No reinforcement from soil report.
continues to end of cantilever should be stopped less than 10/ /Steel fy should not be less than
unless specified otherwise by 0.75 x cantilever unless specified 460N/mm.2 for shear reinforced for
designer by designer Punching shear and the number of
sttirups branches is not less then 6
branches and the maximum
spaceing. between sttirups
is((100mm))

jestackengineering@
Gmail gmail.com
. . 00249999420418
TEL
00249902877734
Owner Mohamed Abd Allah
TOWN Bahri / Khartoum
Plot: 1/911 PROJECT:
RESIDENTIAL
Block: 51 BUILDING

SHEET columns Layout


Title
SCALE:
Build Area 172 m2 1:100

Designer Adeeb Motwali DATE:


5/11
Abdallah 2022