Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

48500

Banda

Mixing

3000
Shed

3000

38000
3000
Excavated soil

Godown

Bricks

Office Stones

Excavated soil Aggrigates

Sand

Excavated soil
Drawn by
Firm name and adress Project name Building Supervisor Mngumi. E Coordinates
Sustainable Agricultural Kigoma Region Proposed construction of Godown SAKIRP S...........................
Project - SAKIRP AMCOS group in Kigoma Chacked by .......................... E...........................
Enabel Belgian Development Agency ENABEL $ AMCOS PROJECT ..........................
P.O.BOX 24 Kigoma - Tanzania
Ward Mugunzu Drawing name F & R elevation General notes
Sheet No GODW-02/11 All dimensions are in cm unless otherwise
In paternership with Village Mugunzu specified
District Council Date July 2021
Kigoma region Hamlet Hamlet Scale NTS

GSPublisherEngine 0.0.100.100
Drawn by
Firm name and adress Project name Building Supervisor Mngumi. E Coordinates
Sustainable Agricultural Kigoma Region Proposed construction of Godown SAKIRP S...........................
Project - SAKIRP AMCOS group in Kigoma Chacked by .......................... E...........................
Enabel Belgian Development Agency ENABEL $ AMCOS PROJECT ..........................
P.O.BOX 24 Kigoma - Tanzania
Ward Drawing name R&L Elevation General notes
In paternership with Sheet No GODW-03/11
Village
District Council Date July 2021
Kigoma region Hamlet Scale NTS

GSPublisherEngine 0.0.100.100
4 3 2 1

21,448

D
1,503
21,696
shed

3,262
C

C
450

450
external masonry
wall 300mm
2,350

2,350
thick

450
450

2,400

8,300
15,156
23,
2,400

001
godown
external masonry external masonry

450
wall 400mm wall 400mm
450

thick thick
external masonry

2,350
wall 300mm
2,350

thick
450 2,200 450 2,250 450 2,250 450 2,250 450 2,250 450 2,250 450 2,252 450 2,200 449
B

B
450

450
masonry
450 2,200 450 column
450*450
7,5 store 6,1 office

3,594
10,5
36 shed 13 18

A
A

9,903 6,598 4,952


21,453
4 3 2 1

Drawn by
Firm name and adress Project name Building Supervisor Mngumi. E Coordinates
Sustainable Agricultural Kigoma Region Proposed construction of Godown SAKIRP S...........................
Project - SAKIRP AMCOS group in Kigoma Chacked by .......................... E...........................
Enabel Belgian Development Agency ENABEL $ AMCOS PROJECT ..........................
P.O.BOX 24 Kigoma - Tanzania
Ward Drawing name Foundation plan General notes
In paternership with Sheet No GODW-04/11
Village
District Council Date
Kigoma region Hamlet Scale NTS

GSPublisherEngine 0.0.100.100
4 3 2 1
water tank post
21,450

3,250
shed

450
W2 W2 W2 W2 W2 W2 W2

C
W2

21,050

2,350
fixed on concrete
2,350

70mm GS pipe

700mm deep
VB
VB

450
VB

2,400
8,000

ramp

8,300
15,127

ramp

VB D1
godown

450
2,158
11,877

2,350
VB
400 external masonry VB
wall 300mm
thick

450
W2 W2 W2 W2 W2 W2 W2 W2
B

B
masonry
column
450*450

3,577
Window and Door schedule store office
shed VB VB

item name width height Qty


masonry wall 300mm
W1 Window 1 2200 600 2

D2

D2
thick

A
A

W2 Window 2 2200 300 16 W1


1,200 W1
1,200
1,584 2,250 663 1,000 1,101 726 2,250 387 1,000 588
VB vent block 2300 600 16

2,158
4 3 ramp 2 ramp 1
water tank post
D1 Door 1 2400 2500 2
D2 Door 2 1000 2500 2 9,902 6,598 4,952

Drawn by
Firm name and adress Project name Building Supervisor Mngumi. E Coordinates
Sustainable Agricultural Kigoma Region Proposed construction of Godown SAKIRP S...........................
Project - SAKIRP AMCOS group in Kigoma Chacked by .......................... E...........................
Enabel Belgian Development Agency ENABEL $ AMCOS PROJECT ..........................
P.O.BOX 24 Kigoma - Tanzania Ward Drawing name Ground plan General notes
Sheet No GODW-05/11
In paternership with Village
District Council Date
Kigoma region Hamlet Scale NTS

GSPublisherEngine 0.0.100.100
40 1,138

40cm thick Flemish bond


5*7.5cm 0.5cm thick welded to GS and
Timber plate painted with antrust

gable wall

5
bolt

72
240 2,030 240 270
2,780

masonry column

2,595
450x450 masonry column

285
30cm thick header bond

3,044
330
and office wall
side, store

ramp

7.5m/3inch GS pipe

450
ground level
30

2,293
894
450
1,287

15C concrete

650
70
5
50
450
1,308
300

Masonry wall brick bond plan veranda shed detail

Drawn by
Firm name and adress Project name Building Supervisor Mngumi. E Coordinates
Sustainable Agricultural Kigoma Region Proposed construction of Godown SAKIRP S...........................
Project - SAKIRP AMCOS group in Kigoma Chacked by .......................... E...........................
Enabel Belgian Development Agency ENABEL $ AMCOS PROJECT ..........................
P.O.BOX 24 Kigoma - Tanzania
Ward Drawing name Veranda detail General notes
In paternership with Sheet No GODW-06/11
Village
District Council Date
Kigoma region Hamlet Scale NTS

GSPublisherEngine 0.0.100.100
1 2 3 4

A
A
1,600 1,600 1,600 1,552 1,600 1,600 1,600
shed
office store
B

B
295 1,000 1,000 1,700 1,700 1,712 1,689 1,700 1,700 1,700 1,700 1,700 1,703 1,697 1,700
1,200
2,950

godown
C

C
shed
D

D
1 2 3 4

Drawn by
Firm name and adress Project name Building Supervisor Mngumi. E Coordinates
Sustainable Agricultural Kigoma Region Proposed construction of Godown SAKIRP S...........................
Project - SAKIRP AMCOS group in Kigoma Chacked by .......................... E...........................
Enabel Belgian Development Agency ENABEL $ AMCOS PROJECT ..........................
P.O.BOX 24 Kigoma - Tanzania Ward Drawing name Trusses plan General notes
Sheet No GODW-06/11
In paternership with Village
District Council Date
Kigoma region Hamlet Scale NTS

GSPublisherEngine 0.0.100.100
roof ridge +7,350
ecocline iron sheets
5cm roof purlins spaced 1m
15cm roof rafter
00 10cm king post
54 1,0 double 15cm tie beam
5,5

2,695
2,
32
4
7
1,82
300

1,
48

23
1,0
00

5
1,0 +4650
+4450
500

+3850
80 ecoline roof Detail 1
500 80

2,300
20cm ring beam
Reinforced
600

600

concrete 20C 20cm ventilation blocks


lintel beam
Front window 2,300
ventilation block
2,800

2,800
75mm/3inch GS pipe
2,005

header bond wall

DPC Membrane extending


10cm both side 2,350 2,350
+450

100

332
Ground Level
0 Ground Level
5cm well compacted and finished
2,158

200
foundation depth varies from cement paste (1:3 ratio) hardcore under wall
100cm to 150cm depending 15cm concrete 20C
on ground nature approved hard stones
30cm stones

450
well compacted for floor and foundation -1000 to -1500
hardcore
crushed stones 15C concrete for
100

600 800
100 800 100
GS pipe column only
800 1,000

Drawn by
Firm name and adress Project name Building Supervisor Mngumi. E Coordinates
Sustainable Agricultural Kigoma Region Proposed construction of Godown SAKIRP S...........................
Project - SAKIRP AMCOS group in Kigoma Chacked by .......................... E...........................
Enabel Belgian Development Agency ENABEL $ AMCOS PROJECT ..........................
P.O.BOX 24 Kigoma - Tanzania
Ward Drawing name SECTON S General notes
In paternership with Sheet No GODW-07/11
Village
District Council Date
Kigoma region Hamlet Scale NTS

GSPublisherEngine 0.0.100.100
150
1,096

150
1,096

10cm roof rafter


50
321

5cm roof purlins spaced 1m


glued Z- Lap timber joint

ecocline iron sheets

700 galvanized wire atleast 2laps

roof gutter fixed with screw to


double15cm tie beam roof rafter
1cm bar for tying roof truss

4Y1.2 tied with Y0.6-25c/c 2.4cm

20cm thick ring beam


with 2.5cm cover
facia board

Drawn by
Firm name and adress Project name Building Supervisor Mngumi. E Coordinates
Sustainable Agricultural Kigoma Region Proposed construction of Godown SAKIRP S...........................
Project - SAKIRP AMCOS group in Kigoma Chacked by .......................... E...........................
Enabel Belgian Development Agency ENABEL $ AMCOS PROJECT ..........................
P.O.BOX 24 Kigoma - Tanzania
Ward Drawing name Detail 1 General notes
In paternership with Sheet No GODW-08/11
Village
District Council Date
Kigoma region Hamlet Scale NTS

GSPublisherEngine 0.0.100.100
10cm roof rafter ecocline iron sheets
10cm king post
5cm roof purlins spaced 1m
single 15cm tie beam
4,285

385
300
890 537
3,770

roof ridge Office truss


ecocline iron sheets

5cm roof purlins spaced 1m

7.5cm roof rafter


5
1,51

435
7.5cm king post

32
0
single 7.5cm tie beam

2,910

Veranda truss
Drawn by
Firm name and adress Project name Building Supervisor Mngumi. E Coordinates
Sustainable Agricultural Kigoma Region Proposed construction of Godown SAKIRP S...........................
Project - SAKIRP AMCOS group in Kigoma Chacked by .......................... E...........................
Enabel Belgian Development Agency ENABEL $ AMCOS PROJECT ..........................
P.O.BOX 24 Kigoma - Tanzania
Ward Drawing name Truss detail General notes
In paternership with Sheet No GODW-09/11
Village
District Council Date
Kigoma region Hamlet Scale NTS

GSPublisherEngine 0.0.100.100
6000litre water tank

1.5inch plastic
pipe
100

water tap 150 wire mesh reinforced


concrete 15C

250

50
400

plastered masonry wall

450
500
ground level
100

400
hard stone hardcore
foundation
400

2,300
plastered masonry bucket
stand

water tank post elevation


Drawn by
Firm name and adress Project name Building Supervisor Mngumi. E Coordinates
Sustainable Agricultural Kigoma Region Proposed construction of Godown SAKIRP S...........................
Project - SAKIRP AMCOS group in Kigoma Chacked by .......................... E...........................
Enabel Belgian Development Agency ENABEL $ AMCOS PROJECT ..........................
P.O.BOX 24 Kigoma - Tanzania
Ward Drawing name Tank elevation General notes
In paternership with Sheet No GODW-11/11
Village
District Council Date
Kigoma region Hamlet Scale NTS

GSPublisherEngine 0.0.100.100
plastered masonry
wall in stratcher bond

1.5inch water
plastic pipe

water tap 40
496

2,300
600

536
plastered masonry
bucket stand

masonry wall in
stratcher bond well backfilled gravel
sand

water tank post plan


Drawn by
Firm name and adress Project name Building Supervisor Mngumi. E Coordinates
Sustainable Agricultural Kigoma Region Proposed construction of Godown SAKIRP S...........................
Project - SAKIRP AMCOS group in Kigoma Chacked by .......................... E...........................
Enabel Belgian Development Agency ENABEL $ AMCOS PROJECT ..........................
P.O.BOX 24 Kigoma - Tanzania
Ward Drawing name Tank plan General notes
In paternership with Sheet No GODW-10/11
Village
District Council Date
Kigoma region Hamlet Scale NTS

GSPublisherEngine 0.0.100.100
B1

C5 Warehouse
A3 A3 A3 A3
B1
A3

B1 B1

A3

A3 A3 A3 A3 C4

C3

LEGEND
C2 C1
Office Storage
Ceiling mounted luminairy
B1 A2 A1 B1
Wall mounted luminairy
B1
Single wall outlet

Double wall outlet


A2 A1

One way switch

Two way switch B1


Fuse box and main switch

Drawn by
Firm name and adress Project name Building Supervisor Mngumi. E Coordinates
Sustainable Agricultural Kigoma Region Proposed construction of Godown SAKIRP S...........................
Project - SAKIRP AMCOS group in Kigoma Chacked by .......................... E...........................
ENABEL Belgian Development Agency ENABEL $ AMCOS PROJECT ..........................
P.O.BOX 24 Kigoma - Tanzania
Ward Drawing name Wiring plan General notes
In parternership with Village
Sheet No GODW-02/06 All dimensions are in mm
District Municipal Council Date March 2021
Kigoma Kigoma region Hamlet Scale NTS

GSPublisherEngine 0.0.100.100
Bill of Quantities
C5 Description amount
Warehouse A3 C4
1. Switches
C3
Tronic TR 5111 1 gang 1 way 1 pcs
Tronic TR 5112 1 gang 2 way 1 pcs
Tronic TR 5122 2 gang 2 way 2 pcs
Office A2 C2
2. Power outlets
Tronic TR 5213-WN 13A switch socket twin 3 pcs
Tronic TR 5113-WN 13A switch socket 2 pcs
Storage A1 C1
3. Luminaries
Tronic LE 2027-T2 20W LED bulb 16 pcs
Tronic TR 0614 E27 pendant lamp holder 10 pcs
Tronic TR0626 E27 angled lamp holder 6 pcs
From TANESCO post

Exterior B1
4. Cricuit breakers
Tronic MC ISO1-25 isolator 1 pcs
Tronic MC RC 02-30 RCCB 30mA 1 pcs
Tronic MC 1016 circuit breaker 1-pole 2 pcs
Tronic MC 1020 circuit breaker 1-pole 1 pcs
XVB 3 x 1,52

XVB 3 x 1,52

XVB 3 x 2,52
5. Boxes
Tronic DB 2004-10 fuse box 1 pcs

6. Cables
C16A C16A C20A XVB 3 x 1.5 mm2 145 m
XVB 2 x 2.5 mm2 35 m
PVC tube 1.5 cm diameter 190 m
Clips every 1.5 m to fix tubes 130 pcs
∆30mA A B C Screws to fix tubes 130 pcs
Luminaries Luminaries Power outlets
kWh interior exterior

Drawn by
Firm name and adress Project name Building Supervisor Mngumi. E Coordinates
Sustainable Agricultural Kigoma Region Proposed construction of Godown SAKIRP S...........................
Project - SAKIRP AMCOS group in Kigoma Chacked by .......................... E...........................
ENABEL Belgian Development Agency ENABEL $ AMCOS PROJECT ..........................
P.O.BOX 24 Kigoma - Tanzania
Ward Drawing name Wiring diagram General notes
In parternership with Village
Sheet No GODW-02/06 All dimensions are in mm
District Municipal Council Date March 2021
Kigoma Kigoma region Hamlet Scale NTS

GSPublisherEngine 0.0.100.100