Fro} To
a R.Satish Kumar, B.E. The Chief Engineer,
Gngineer-in-Chiet (Admn), FAC. PIPHW Unit,
Fi ‘ater Resources Department, Dowlaiswaram.
1.No. 48-10-9/1, NH Feeder Road,
Near Ramavarappadu Circle.
Vijayawada - 520008.
Letter No Re/ENC/82/22061086/2022 Dated: _01- 08 -2022—
vy
Sub: Estt. - W.R. Dept. - APIES - Sri P.Sudhakara Rao, Executive Engineer,
PIPHW Division No.4, Polovaram of PIPHW Circle, Dowlaiswaram — wl
Proposal for necessary Permission for claiming additionai charge
‘allowances - Rejected - Reg. x
“es. Ref: 1. Chief Engineer, PIP Unit, Dowlaiswaram Lr. No. CE/PIP/Sn.D/D1/
1963/ 2022, Dated. 04.02.2022
2. T.0.Proc.No.Rc/ENC/B2/22021530/2022, Dated 11 03.2022
3. Chief Engineer, PIP Unit, Dowlaiswaram L.No. Re/CE/PIP/Sn.D/D1/
1963/2022, Dated. 29.04.2022
-000-
With reference to the letter 3° cited, it is informed that, the proposals
received for ratification orders in placing Sri P.Sudhakara Rao, Executive Engineer,
PIPHW Division No.4, Polavaram of PIP4W Circle, Dowlaiswaram to the post of
Deputy Superintending Engineer, PIPHW Circle, Dowlaiswaram since 01.09.2021 as
v full additional charge instead of look after the current duties wilh Telrospective
date were already rejected vide referer.ce 2" cited. Therefore, the Chief Engineer
is requested fo not fo make any correspondence on the above subject in future.
Yours faithfully,
RSatish Kumar
Engineer-in-Chief (Admn.}
~S
n forEngifieer-in-Chief (Ai
Office of the Chief Engineer,
Polavaram Irigation Project, Dowlaiswaram.
Re/CE/PIP/Sn.DID. 1/1963/2022, Dated |9-9-2022.
Copy of Engineer-in-Chief, Admn., Vijayawada Lr.No.Re/ENC/B2/22061086/
2022, dt.1-8-2022 is herewith communicated to the Superintending Engineer,
PIPHW Circle, Dowlaiswaram for information and necessary action.
PE Hemawroic
Wichiet Leeda ~ .
Polavaram Irrigation Project,
Dowlaiswaram.
. Agta’a a
Office of the Superintending Engineer,
PIPHW Circle, Dowlaiswaram
Endt.No.SE/PIPHW/AB/EC1/E3/Vol.10 92 Eby pate: 22.11.2022.
No.RC/ENC/B2/22061086
Enat
Copy of Engineer-in-Chief, Admn, Vijayawada letter
Communicated vide Chief — Engineer, ~PIP-—=—sUnit_ ~—-Dowlaiswaram:
No.RC/CE/PIP/Sn.D/Di/1963/2022 dt 19.09.2022 is herewith communicated to the Executive
Engineer, PIPHW, Division no.4,Polavaram for information and necessary action.
J VSipoitenlitf Eraineer,
Ce PIPHW Circle, Dowlaiswaram
am
c
ar -&
=a
DOR
€)
— {7 5. From the E-in-c (Aamn..)
‘8
220 AWE
ps
Fi
lle No.ICDO1-MwiRo\c05/285°202
GOVERNMENT OF ANDHRA PRADESH
WATER RESOURCES (SERVICES-Il) DEPARTMENT
Sub:- Establish:
ment ~ Water Resources Department ~ APIES - Placing
pen Engineers on FAC post = Request for ratification for pp
e FAC allowances (2% spell) - i
FR-a9 - Regarding, (2 spell) ~ Request is not feasible as per 7/0
Bet. From the Engineer-in-Chief (AW), Water Resources Department,
2. layawada, LrNo Re/ENC/B2/E-21082421/ 2021, dated 16.09.2021.
Govt. Memo.No.1552271/ICD01/285/2021-SERH1,
dated: 17.11.2021. |
3, From the En-C (Admn.,), W.8.Deptt., Vijayawada, Letter No.
No.RC / ENC / 82 / 21112072-3 / 2021, ot.22.12.2021.
4, From the E-in-C (Admn.,), W.R.Deptt., Vijayawada, Letter No. RC / ENC/
B2 | 21112072-4 /2021 dt.22.12.2021.
/.R.Deptt., Vijayawada, Letter No. RC / ENC /
72021 dt.22.12.2021.
‘Vijayawada, Letter No, RC/ ENC /
-B2 / 2111207;
uo 6. From the E-in-C (Admn.,), W.R.Deptt.
QD B2 /21212072-1/2021 dt.22.12.2021.
Vijayawada, Letter No. RC / ENC /
ot
Me
sb
Dave
<
7, From the E-in-C (Admon.,), W.R.Deptt.
82 / 21081906-2/2021 dt.19.01.2022.
8. From the E-in-C (Admn.,), W.R.Deptt., Vijayawada, Letter No. RC/ ENC/
B2 /21121714-2/2021, dt.19.01.2022.
9. From the E-in-C (Admn..), W.R.Deptt., Vijayawada, Letter No. RC / ENC /
B2 / 21121564-2/2021, dt.19.01.2022.
da, Letter No. RC / ENC
10. From the E-in-C (Admn.,), W.R.Deptt., Vijayawa
7 B2 / 21121734 / 2021, dt.19.01.2022.
Lt erom the E-in-C (Admn.,), W.R Deptt. Vijayawada, Letter No, RC / ENC
782 / 21211551 / 2021, dt.19.01.2022,
fo erom the E-in-C (Admn.,), W.R.Deptt., Vijayawada, Letter No. RC/ ENC
7 B2 / 211215642 / 2021, dt.19.01.2022. .
43, From the E-in-C (Admn.,), W.R.Deptt., Vijayawada, Letter No RC/ ENC
72 / 22611159-2/2022. dt.01.02.2022
14, From the E-in-C (Admn.,), W.R.Deptt., Vijayawada, Letter No. RC/ ENC
7B2 / 22011902 / 2022 at.10.02,2022
WA .Deptt., Vijayawada, Letter No. RC / ENC
15, From the E-in-C (Admn.,), Wt
7 B2 / 22021266 / 2022 dt.24.02,2022.
46. From the E:in-C (Admn.,), W.R.Dept., Vijayawada, Letter No. RC /
ENC / B2 / 22021182 / 2022, dt.24.02.2022.
17. From the E-in-C (Admn.,). W.R.Deptt., Vijayawadi
7 B2 / 22012012 / 2022, dt.02.03.2022.
{8 From the E.in-C (Admn,,), W.R.Deptt., Vijayawada, Letter No. RC / ENC
7 B2 / 22021854 / 2022 at. 28.03.2022.
49. From the E-in-C (Admn.,), W.R.Deptt, Vijayawada, Letter No. RC/ ENC
/B2 / 22031691 / 2022 dt.30.03.2022.
50, From the E-in-C (Admn..), W.R.Deptt., Vijayawada, Letter No. RC/ ENC
72 / 22021973 / 2022 at.31.03.2022
oy rom the Exin-C (Admn.,), W.R.Deptt., Vijayawada, Letter No. RC/ ENC
7B2 / 22031418 / 2022, dt.08.04.2022.
22. From the E-in-C (Admn.,), W.R.Deptt., Vijayawada, Letter No. RC / ENC
a
a, Letter No. RC / ENC——~
4-SERH
File No 1cpot-msiRoic0s/265/207
182 / 22031517 / 2022, dt.22.04.2022,
23. From the En-c (admn,), W.A.Deptt. Vee"
(82 / 22041366 / 2022, 6t.26.04,2022, - viayawader
Letter. No.
24, From the E-in-C (Admn.,), W.R.DeI
ENC /B2/ 22041174 / 2022, dt.04.05.2022; sua,
25. From the E-in-C (Admn.,), W.R.Dept., vijay
1 82 / 22041676 / 2022, d.09.05.2022. \awada, Letter NO
26, From the E-in-C (Admn.,), W.R.Deptt
8 19.05.2022.
182 / 22051270 / 2022, dt.19.05.2! t. Vijayawada, Le
27. From the E-in-C (Admn.,), W.R.Deptt
ada, Letter No
Letter No. RC iP
RC / ENC
RC / ENC
RC / ENC
etter No. RC / ENC
182 / 22051464 / 2022, dt.30.05.2022,° 0, RC / ENC
eat 20Rinan,) Wa Deptt. vjayawade. Letter N
1182122052008 /2022, db 24.06.2022. yjayawada, Letter
29. From the E-in-C _(Admn.,),
No.RC/ENC/B2 /21112072-3/2022, dt.21.06.2022.
<<>>
dmn.,),
Water Resources
The attention of the Engineer-in-Chief (A‘
fayewada ts Invited tthe referer ited and he is informed that
Department, Vijayawada is invited to the references ci
placing of certain Executive Engineers on full addi
his action by the Government, as per F.R-49 is not feasibl
itional charge
je and time barred.
for ratification of
Shashi Bhushan Kumar | AS
Principal Secretary To Government
To
fe Engineer-in-Chief, (Admn.,), Water Resources Department,
Near Ramavarappadu Ring, Currency Nagar, Vijayawada.
‘SffSc.
/IFORWARDED BY ORDER//
SECTION OFFICER.
af
Signed by Shashi Bhushan
Kumar! AS
Date: 31-08-2022 12:07:05
Reason: Approved
—inte 3
a ecient ts lacing of certain oe 288/2021-BER 2, Dated 91.08:
Gov
22, have
- 5
questing 1 Executive Ingineer on full additional charge and for
‘tification of
Gov of the acti 1
}overnment, isnot feasible nee ee Eglneern-chet (Admin), Vijayawada by the
‘Therefore,
submitted prop aah emneutn Engineers and Superintending Engineers, who have
informed that, thelt peyton OF 2 apell adaltional pay and allowances are hereby
» conn Proposals for additional pay and allowances are hereby rejected, as
Per FR 49, The cone
‘The concerned Unit/Circle officers ‘are requented to take necessary action,
Sd/-R Satish Kumar, 16.09.2022
To Engineer-in-Chiet (Admin)
Sri, ‘AYenkatramaiah, Executive Engineer
Sti, S.gutth the Superintending Engineer, SSLC & SB Circle, Nellore
SMadhu Prasad Reddy, Executive Engineer
eee... Through the Commissioner, Commissionerate of Tenders, Vjayawada,
Sti, M.V.Mohana Murthy, Executive Engineer
Through the Superintending Engineer, TBP HLC Circle, Ananthapuramu,
Sri. P.Krishna Mohan, Executive Engineer
Through the Superintending Engineér, Irrigation Circle, Nellore,
Sri, B.Venkata Swamy, Deputy Director (P&A)
‘Through the Chief Engineer, IS & WR, Vijayawada,
Sri, C.R.Raja Gopal, Executive Engineer
‘Through the Superintending Engineer, AVR HNSS Circle No.3, Madanapalle,
S.Mallikarjuna, Deputy Superintending Engineer
‘Through the Superintending Engineer, Irrigation Circle, Guntur.
N.Ramakrishna Yadav, Deputy Superintending Engineer
‘Through the Superintending Engineer, Irigation Circle, Ananthapuram,
Sri, C.Naga Murali Mohan, Executive Engineer
‘Through the Superintending Engineer, Construction Circle, Ongole
Sri, A.Suresh, Executive Engineer
‘Through the Chief Engineer, Hydrology, Vijayawada,
Smit. Y.V.Ryja Rajeswari, Superintending Engineer
‘Through the Commissioner, CADA, Vijayawada,
Sri, A.Chandra Sekhara Reddy, Executive Engineer
‘Through the Superintending Engineer, PIPLMC Circle, Tani,
Sri. Y.Srihari, Executive Engineer
‘Through the Superintending Engineer, NSJC O&M Circle, Lingamguntla,
\ASri, P.Venkata Ramana, Executive Engineer
‘Through the Superintending Engineer, PIPHW Circle, Dowlaiswaram,
Sri, B.Ramesh Babu, Executive Engineer
‘Through the Superintending Engineer, TOP GNSS Circle, Tirupati.
Sri, RAppa Rao, Deputy Superintending Engineer
‘Through the Superintending Engineer, Pulichintala Project Circle, Visannapeta
Sri. N.Rajasekhar, Superintending Engineer
‘Through the Superintending Engineer, TBP HLC Circle, Ananthapuramu.
Sri, M.R.Mohideen, Deputy Chief Engineer
‘Through the Chief Engineer, N.S.Project, Guntur.
Smt. M.Revathi, Executive Engineer
‘Through the Superintending Engineer, QCV & E Circle, Dowlaiswaram,
Sri, P.V.Tirupathi Rao, Deputy Superintending Engineer
‘Through the Superintending Engineer, TTPR Circle, Vizianagaram.
Copy submitted to the Principal Secretary to Government, Water Resources Department,
Secretariat, Velagapudi,
Copy to the Deputy Executi
He is directed to mail the Govt. Memo with endorsement to
Copy to file.
Sri
Sri,
Engineer (computers), 0/0 the ENC (Admin.), Viayavwada.
SSE een the congerned offices.
ret (
i ) forEng)
a
“ao
(voffice
preHw circler laiswar
___pate:plp 11-2022.
Endt.
Endtno.se/preHw/apyecieswva.sol AY
pIPHW, Division 10.8
Copy
to
anniireda Sri P.venkata Ramana/Executive Engineet,
{ygudem for information.