BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB1.

oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56

Type in the Job Description yourself


Span Stress-N/mm2 Vc-N/mm2 Link Defl'n
No L R L R L S R ratio
ALONG GRID : U;/1-4; FILE NAME : 1FB1; Code : BS8110:1985
1FB1 0.45 0.58 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 7.96
D.L. L.L. fcu fy fyv cover span cantilever 1FB1A 0.28 0.44 0.41 0.50 1R 6-200 1R 6-200 1R 6-200 8.54
1.40 1.60 25 410 250 25 3 Right 1FB1B 0.56 0.00 0.50 0.50 1R 6-200 1R 6-200 1R 6-200 4.37

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB1 3.75 150 600 150 0


1FB1A 3.75 150 600 150 0
1FB1B 1.73 150 600 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.55 0.00


1 trapeziodal 6.01 4.51 X1 = 0.00 X2 = 3.75 X = 1.50

2 udl 9.55 0.00

3 udl 9.55 0.00


3 point load 8.85 2.41 1.72
3 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

Support Support Reaction-kN


No D.L. L.L.

1 21.3 4.7
2 40.8 6.7
3 51.5 6.7

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB1 0.0 37.1 -25.7 38.2 49.6


1FB1A -25.7 0.1 -54.6 23.4 36.9
1FB1B -54.6 -22.8 0.0 47.1 0.0

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB1 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 189 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB1A 135 165 285 2Y12= 2x1 2Y12= 2x1 2Y16= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB1B 285 142 135 2Y16= 2x1 2Y16= 2x1 2Y16= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB2.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB2B 553 276 135 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
Type in the Job Description yourself

ALONG GRID : T;/1-4; FILE NAME : 1FB2; Code : BS8110:1985 Span Stress-N/mm2 Vc-N/mm2 Link Defl'n
No L R L R L S R ratio
D.L. L.L. fcu fy fyv cover span cantilever
1FB2 0.77 1.00 0.50 0.50 1R 6-200 1R 6-200 1R 6-150 6.82
1.40 1.60 25 410 250 25 3 Right 1FB2A 0.63 0.90 0.50 0.58 1R 6-200 1R 6-200 1R 6-200 8.97
1FB2B 0.81 0.00 0.58 0.58 1R 6-200 1R 6-200 1R 6-200 3.10
Span No Span-m Width-mm Depth-mm F-width F-depth

1FB2 3.75 150 600 150 0


1FB2A 3.75 150 600 150 0
1FB2B 1.73 150 600 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.55 0.00


1 trapeziodal 6.01 4.51 X1 = 0.00 X2 = 3.75 X = 1.50

2 udl 9.55 0.00


2 partial udl 6.01 4.51 -3.75 6.01 4.51 3.75

3 udl 2.15 0.00


3 point load 26.12 6.98 1.72
3 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
3 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

Support Support Reaction-kN


No D.L. L.L.

1 31.2 12.8
2 60.5 27.8
3 74.4 24.1

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB2 0.0 60.9 -47.9 65.5 84.8


1FB2A -47.9 10.2 -99.9 53.0 76.2
1FB2B -99.9 -49.2 0.0 68.4 0.0

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB2 135 135 248 2Y12= 2x1 2Y12= 2x1 2Y16= 2x1 Top
159 319 116 2Y16= 2x1 2Y16= 2x1 2Y12= 2x1 Bot

1FB2A 248 318 553 2Y16= 2x1 2Y16= 2x1 2Y20= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB3.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB3A 0.51 0.00 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.25

Type in the Job Description yourself

ALONG GRID : S;/1-4; FILE NAME : 1FB3; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Right

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB3 7.50 225 600 225 0


1FB3A 1.73 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 10.63 0.00


1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

2 udl 3.23 0.00


2 point load 21.98 6.60 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

Support Support Reaction-kN


No D.L. L.L.

1 78.6 33.9
3 124.9 46.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB3 0.0 300.6 -91.2 166.7 185.2


1FB3A -91.2 -43.9 0.0 64.6 0.0

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB3 202 202 481 2Y12= 2x1 2Y12= 2x1 2Y20= 2x1 Top
972 1945 583 2Y25= 2x1 4Y25= 3x2 2Y20= 2x1 Bot

1FB3A 481 240 202 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB3 1.31 1.46 0.58 0.50 1R10-125 1R10-125 1R10-125 1.82

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB4.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB4A 0.53 0.00 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.13

Type in the Job Description yourself

ALONG GRID : R;/1-4; FILE NAME : 1FB4; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Right

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB4 7.50 225 600 225 0


1FB4A 1.73 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

2 udl 3.23 0.00


2 point load 23.10 6.77 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

Support Support Reaction-kN


No D.L. L.L.

1 50.6 33.9
3 98.5 47.1

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB4 0.0 226.8 -94.3 127.6 146.8


1FB4A -94.3 -45.6 0.0 66.5 0.0

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB4 202 202 499 2Y12= 2x1 2Y12= 2x1 2Y20= 2x1 Top
682 1364 409 2Y25= 2x1 3Y25= 3x1 2Y20= 2x1 Bot

1FB4A 499 249 202 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB4 1.00 1.16 0.58 0.50 1R10-300 1R10-300 1R10-225 2.14

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB5.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB5A 0.52 0.00 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.16

Type in the Job Description yourself

ALONG GRID : Q;/1-4; FILE NAME : 1FB5; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Right

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB5 7.50 225 600 225 0


1FB5A 1.73 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 8.22 0.00


1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

2 udl 3.23 0.00


2 point load 22.77 6.73 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

Support Support Reaction-kN


No D.L. L.L.

1 69.4 33.9
3 116.8 47.1

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB5 0.0 276.2 -93.4 153.9 172.9


1FB5A -93.4 -45.1 0.0 65.9 0.0

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB5 202 202 493 2Y12= 2x1 2Y12= 2x1 2Y20= 2x1 Top
906 1813 543 2Y25= 2x1 4Y25= 3x2 2Y20= 2x1 Bot

1FB5A 493 246 202 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB5 1.21 1.36 0.58 0.50 1R10-125 1R10-125 1R10-125 1.93

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB6.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB6A 0.53 0.00 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.14

Type in the Job Description yourself

ALONG GRID : N;/1-4; FILE NAME : 1FB6; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Right

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB6 7.50 225 600 225 0


1FB6A 1.73 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

2 udl 3.23 0.00


2 point load 22.96 6.77 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

Support Support Reaction-kN


No D.L. L.L.

1 50.6 33.9
3 98.3 47.1

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB6 0.0 226.9 -94.0 127.6 146.8


1FB6A -94.0 -45.4 0.0 66.3 0.0

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB6 202 202 497 2Y12= 2x1 2Y12= 2x1 2Y20= 2x1 Top
682 1365 409 2Y25= 2x1 3Y25= 3x1 2Y20= 2x1 Bot

1FB6A 497 248 202 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB6 1.00 1.16 0.58 0.50 1R10-300 1R10-300 1R10-225 2.14

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB7.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56


1FB7 1.29 1.45 0.67 0.58 1R10-225 1R10-225 1R10-175 1.95
Type in the Job Description yourself 1FB7A 0.52 0.00 0.58 0.58 1R 6-125 1R 6-125 1R 6-125 4.42

ALONG GRID : M;/1-4; FILE NAME : 1FB7; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Right

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB7 7.50 225 600 225 0


1FB7A 1.73 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 10.63 0.00


1 point load 22.53 6.77 3.75
1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
1 trapeziodal 6.01 4.51 X1 = 0.00 X2 = 3.75 X = 1.50
1 trapeziodal 6.01 4.51 X1 = 3.75 X2 = 7.50 X = 1.50

2 udl 3.23 0.00


2 point load 22.52 6.74 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

Support Support Reaction-kN


No D.L. L.L.

1 80.7 30.5
3 127.8 43.7

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB7 0.0 335.6 -92.9 164.3 183.2


1FB7A -92.9 -44.8 0.0 65.6 0.0

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB7 202 411 490 2Y16= 2x1 2Y20= 2x1 2Y20= 2x1 Top
1078 2156 647 3Y25= 3x1 5Y25= 3x2 2Y25= 2x1 Bot

1FB7A 490 245 202 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y25= 2x1 2Y25= 2x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB8.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 No L R L R L S R ratio

Type in the Job Description yourself 1FB8 1.21 1.22 0.58 0.50 1R10-125 1R10-125 1R10-125 1.83
1FB8A 0.54 0.00 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.00
ALONG GRID : L;/1-4; FILE NAME : 1FB8; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Right

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB8 7.50 225 600 225 0


1FB8A 1.73 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 22.53 6.76 3.75
1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
1 partial udl 7.40 0.00 0.00 7.40 0.00 3.75
1 trapeziodal 6.01 4.51 X1 = 0.00 X2 = 3.75 X = 1.50
1 trapeziodal 6.01 4.51 X1 = 3.75 X2 = 7.50 X = 1.50

2 udl 3.23 0.00


2 point load 24.07 7.11 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

Support Support Reaction-kN


No D.L. L.L.

1 73.4 30.5
3 108.9 44.2

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB8 0.0 297.9 -97.6 154.3 154.7


1FB8A -97.6 -47.4 0.0 68.4 0.0

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB8 202 202 517 2Y12= 2x1 2Y12= 2x1 2Y20= 2x1 Top
965 1930 579 2Y25= 2x1 4Y25= 3x2 2Y20= 2x1 Bot

1FB8A 517 258 202 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB9.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB9A 0.47 0.00 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.63

Type in the Job Description yourself

ALONG GRID : K;/1-4; FILE NAME : 1FB9; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Right

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB9 7.50 225 600 225 0


1FB9A 1.73 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

2 udl 3.23 0.00


2 point load 18.32 6.67 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

Support Support Reaction-kN


No D.L. L.L.

1 51.7 33.9
3 92.6 47.0

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB9 0.0 230.9 -82.6 128.7 145.2


1FB9A -82.6 -39.2 0.0 59.6 0.0

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB9 202 202 432 2Y12= 2x1 2Y12= 2x1 2Y20= 2x1 Top
698 1396 418 2Y25= 2x1 3Y25= 3x1 2Y20= 2x1 Bot

1FB9A 432 216 202 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB9 1.01 1.15 0.58 0.50 1R10-300 1R10-300 1R10-225 2.11

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB10.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB10A 0.67 0.00 0.59 0.59 1R 6-125 1R 6-125 1R 6-125 3.55

Type in the Job Description yourself

ALONG GRID : J;/1-4; FILE NAME : 1FB10; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Right

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB10 7.50 225 600 225 0


1FB10A 1.73 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

2 udl 3.23 0.00


2 point load 36.81 10.91 1.72
2 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

Support Support Reaction-kN


No D.L. L.L.

1 47.8 33.9
3 112.0 49.8

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB10 0.0 217.3 -132.1 124.8 151.8


1FB10A -132.1 -68.4 0.0 84.6 0.0

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB10 202 202 724 2Y12= 2x1 2Y12= 2x1 2Y25= 2x1 Top
646 1293 388 2Y25= 2x1 3Y25= 3x1 2Y16= 2x1 Bot

1FB10A 724 362 202 2Y25= 2x1 2Y25= 2x1 2Y25= 2x1 Top
175 202 175 2Y16= 2x1 2Y16= 2x1 2Y16= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB10 0.98 1.20 0.58 0.59 1R10-300 1R10-300 1R10-225 2.23

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB11.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:57

Type in the Job Description yourself

ALONG GRID : H;/1-3; FILE NAME : 1FB11; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB11 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 10.63 0.00


1 point load 12.38 2.52 1.20
1 point load 12.38 2.52 2.40
1 point load 12.38 2.52 3.60
1 point load 36.99 8.20 4.80
1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
1 isos. tri-lar 2.41 1.80 X1 = 0.00 X2 = 1.20
1 isos. tri-lar 2.41 1.80 X1 = 1.20 X2 = 2.40
1 isos. tri-lar 2.41 1.80 X1 = 2.40 X2 = 3.59
1 isos. tri-lar 2.41 1.80 X1 = 3.59 X2 = 4.80
1 isos. tri-lar 5.40 4.05 X1 = 4.80 X2 = 7.50

Support Support Reaction-kN


No D.L. L.L.

1 106.3 29.0
3 105.8 30.5

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB11 0.0 408.3 0.0 195.0 196.9

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB11 202 853 202 2Y25= 2x1 2Y25= 2x1 2Y25= 2x1 Top
1291 2582 1291 3Y25= 3x1 6Y25= 3x2 3Y25= 3x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB11 1.55 1.56 0.67 0.67 1R10-150 1R10-300 1R10-150 1.47

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB12.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56


1FB12B 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
Type in the Job Description yourself 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

ALONG GRID : G;/3-7; FILE NAME : 1FB12; Code : BS8110:1985


Span Stress-N/mm2 Vc-N/mm2 Link Defl'n
D.L. L.L. fcu fy fyv cover span cantilever No L R L R L S R ratio
1.40 1.60 25 410 250 25 3 Nil
1FB12 0.26 0.49 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.53
1FB12A 0.30 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.81
Span No Span-m Width-mm Depth-mm F-width F-depth 1FB12B 0.30 0.21 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67

1FB12 3.04 150 600 150 0


1FB12A 2.96 150 600 150 0
1FB12B 3.00 150 600 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 2.15 0.00


1 point load 14.93 4.66 1.72
1 partial udl 3.00 0.00 1.72 3.00 0.00 3.02
1 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.02 X = 0.86

2 udl 5.15 0.00


2 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 2.96 X = 0.86

3 udl 5.15 0.00


3 trapeziodal 3.46 2.58 X1 = -0.02 X2 = 3.00 X = 0.86

Support Support Reaction-kN


No D.L. L.L.

3 10.8 4.0
5 35.0 10.6
6 23.3 6.9
7 9.4 2.6

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB12 0.0 25.2 -22.1 21.9 41.8


1FB12A -22.1 5.1 -13.4 25.1 20.3
1FB12B -13.4 13.2 0.0 25.1 17.7

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB12 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB12A 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB13.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:55 9 udl 5.15 0.00
9 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
Type in the Job Description yourself
10 udl 5.15 0.00
10 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
ALONG GRID : G;/7-26; FILE NAME : 1FB13; Code : BS8110:1985
11 udl 5.15 0.00
D.L. L.L. fcu fy fyv cover span cantilever 11 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1.40 1.60 25 410 250 25 19 Nil
12 udl 5.15 0.00
12 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
Span No Span-m Width-mm Depth-mm F-width F-depth

13 udl 5.15 0.00


1FB13 3.00 150 600 150 0 13 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB13A 3.00 150 600 150 0
1FB13B 3.00 150 600 150 0
1FB13C 3.00 150 600 150 0 14 udl 5.15 0.00
1FB13D 3.00 150 600 150 0 14 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB13E 3.00 150 600 150 0
1FB13F 3.00 150 600 150 0 15 udl 5.15 0.00
1FB13G 3.00 150 600 150 0 15 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB13H 3.00 150 600 150 0
1FB13I 3.00 150 600 150 0
1FB13J 3.00 150 600 150 0 16 udl 5.15 0.00
1FB13K 3.00 150 600 150 0 16 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB13L 3.00 150 600 150 0
1FB13M 3.00 150 600 150 0 17 udl 5.15 0.00
1FB13N 3.00 150 600 150 0 17 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB13P 3.00 150 600 150 0
1FB13Q 3.00 150 600 150 0
18 udl 5.15 0.00
1FB13R 3.00 150 600 150 0
18 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB13S 3.00 150 600 150 0

19 udl 5.15 0.00


19 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
Span Load Type D.L. L.L. X1 D.L. L.L. X2
No kN;kN/m m kN;kN/m m

Support Support Reaction-kN


1 udl 5.15 0.00 No D.L. L.L.
1 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86

7 8.9 2.5
2 udl 5.15 0.00
8 26.2 7.0
2 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
9 22.0 6.6
10 23.1 6.8
3 udl 5.15 0.00 11 22.8 6.8
3 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 12 22.9 6.8
13 22.9 6.8
4 udl 5.15 0.00 14 22.9 6.8
4 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 15 22.9 6.8
16 22.9 6.8
17 22.9 6.8
5 udl 5.15 0.00 18 22.9 6.8
5 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 19 22.9 6.8
20 22.9 6.8
6 udl 5.15 0.00 21 22.9 6.8
6 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 22 22.8 6.8
23 23.1 6.8
24 22.0 6.6
7 udl 5.15 0.00 25 26.2 7.0
7 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 26 8.9 2.5

8 udl 5.15 0.00


8 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
FACTORED MOMENT-kNm FACTORED SHEAR-kN

Page 1 of 4 Page 2 of 4
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB13.oo1 ...Continue

Span No Left Span Right Left Right 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB13 0.0 12.0 -15.1 16.8 25.5 1FB13L 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB13A -15.1 7.7 -12.5 23.2 21.3 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
1FB13B -12.5 8.7 -13.3 22.1 22.6
1FB13C -13.3 8.4 -13.1 22.4 22.3 1FB13M 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB13D -13.1 8.5 -13.1 22.3 22.3 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
1FB13E -13.1 8.5 -13.1 22.3 22.3
1FB13F -13.1 8.5 -13.1 22.3 22.3
1FB13G -13.1 8.5 -13.1 22.3 22.3 1FB13N 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB13H -13.1 8.5 -13.1 22.3 22.3 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
1FB13I -13.1 8.5 -13.1 22.3 22.3
1FB13J -13.1 8.5 -13.1 22.3 22.3 1FB13P 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB13K -13.1 8.5 -13.1 22.3 22.3 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
1FB13L -13.1 8.5 -13.1 22.3 22.3
1FB13M -13.1 8.5 -13.1 22.3 22.3
1FB13N -13.1 8.5 -13.1 22.3 22.3 1FB13Q 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB13P -13.1 8.4 -13.3 22.3 22.4 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
1FB13Q -13.3 8.7 -12.5 22.6 22.1
1FB13R -12.5 7.7 -15.1 21.3 23.2 1FB13R 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB13S -15.1 12.0 0.0 25.5 16.8 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB13S 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
No. Left Span Right Left Span Right Bar

1FB13 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top Span Stress-N/mm2 Vc-N/mm2 Link Defl'n
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot No L R L R L S R ratio

1FB13A 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB13 0.20 0.30 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB13A 0.28 0.25 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB13B 0.26 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB13B 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB13C 0.27 0.26 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB13D 0.27 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB13E 0.27 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB13F 0.27 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB13C 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB13G 0.27 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB13H 0.27 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB13I 0.27 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB13D 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB13J 0.27 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB13K 0.27 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB13L 0.27 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB13M 0.27 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB13E 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB13N 0.27 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB13P 0.26 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB13Q 0.27 0.26 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB13F 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB13R 0.25 0.28 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB13S 0.30 0.20 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67

1FB13G 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB13H 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB13I 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB13J 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB13K 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top

Page 3 of 4 Page 4 of 4
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB14.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56

Type in the Job Description yourself

ALONG GRID : G1;/1-2a; FILE NAME : 1FB14; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB14 4.80 150 550 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.36 0.00


1 point load 12.38 2.52 1.20
1 point load 12.38 2.52 2.40
1 point load 12.38 2.52 3.60
1 partial udl 2.00 1.50 0.00 2.00 1.50 4.80
1 isos. tri-lar 2.41 1.80 X1 = 0.00 X2 = 1.20
1 isos. tri-lar 2.41 1.80 X1 = 1.20 X2 = 2.40
1 isos. tri-lar 2.41 1.80 X1 = 2.40 X2 = 3.59
1 isos. tri-lar 2.41 1.80 X1 = 3.59 X2 = 4.80

Support Support Reaction-kN


No D.L. L.L.

1 48.8 9.6
2a 48.8 9.6

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB14 0.0 113.1 0.0 83.5 83.5

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB14 123 123 123 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
364 728 364 2Y25= 2x1 2Y25= 2x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB14 1.08 1.08 0.69 0.69 1R 6-200 1R 6-200 1R 6-200 2.76

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB15.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:57


1FB15 1.02 1.89 0.58 0.74 1R10-250 1R10-250 1R10-125 2.13
Type in the Job Description yourself 1FB15A 0.99 0.52 0.74 0.59 1R 6-125 1R 6-125 1R 6-125 12.60

ALONG GRID : F;/1-5; FILE NAME : 1FB15; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB15 7.50 225 600 225 0


1FB15A 3.00 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 10.63 0.00


1 point load 52.11 10.54 4.80
1 partial udl 2.00 1.50 0.00 2.00 1.50 4.80
1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
1 isos. tri-lar 5.40 4.05 X1 = 4.80 X2 = 7.50

2 udl 3.23 0.00


2 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.02 X = 0.86
2 trapeziodal 6.01 4.51 X1 = 0.00 X2 = 3.02 X = 1.50

Support Support Reaction-kN


No D.L. L.L.

1 68.9 21.0
3 188.4 57.0
5 -37.1 5.8

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB15 0.0 237.0 -281.3 130.2 233.0


1FB15A -281.3 0.0 0.0 122.0 -65.2

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB15 202 368 1841 2Y12= 2x1 2Y16= 2x1 4Y25= 3x2 Top
721 1443 433 2Y25= 2x1 3Y25= 3x1 2Y20= 2x1 Bot

1FB15A 1840 1166 202 4Y25= 3x2 3Y25= 3x1 2Y25= 2x1 Top
175 202 175 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB16.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:55 1FB16A 0.65 0.38 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67

Type in the Job Description yourself

ALONG GRID : F;/5-7; FILE NAME : 1FB16; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB16 3.00 150 600 150 0


1FB16A 3.00 150 600 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 10.14 8.00


1 isos. tri-lar 5.92 4.44 X1 = 0.02 X2 = 3.00
1 trapeziodal 3.46 2.58 X1 = 0.02 X2 = 3.00 X = 0.86

2 udl 9.55 0.00


2 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
2 trapeziodal 5.40 4.05 X1 = 0.00 X2 = 3.00 X = 1.35

Support Support Reaction-kN


No D.L. L.L.

5 17.1 15.6
6 58.3 31.0
7 16.3 5.2

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB16 0.0 35.0 -42.2 50.0 75.7


1FB16A -42.2 23.3 0.0 55.3 32.4

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB16 135 135 216 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 177 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB16A 216 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB16 0.59 0.89 0.41 0.41 1R 6-200 1R 6-200 1R 6-150 10.49

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB17.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:55 9 udl 9.01 0.00
9 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
Type in the Job Description yourself
10 udl 9.01 0.00
10 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
ALONG GRID : F;/7-26; FILE NAME : 1FB17; Code : BS8110:1985
11 udl 9.01 0.00
D.L. L.L. fcu fy fyv cover span cantilever 11 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1.40 1.60 25 410 250 25 19 Nil
12 udl 9.01 0.00
12 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
Span No Span-m Width-mm Depth-mm F-width F-depth

13 udl 9.01 0.00


1FB17 3.00 150 450 150 0 13 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB17A 3.00 150 450 150 0
1FB17B 3.00 150 450 150 0
1FB17C 3.00 150 450 150 0 14 udl 9.01 0.00
1FB17D 3.00 150 450 150 0 14 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB17E 3.00 150 450 150 0
1FB17F 3.00 150 450 150 0 15 udl 9.01 0.00
1FB17G 3.00 150 450 150 0 15 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB17H 3.00 150 450 150 0
1FB17I 3.00 150 450 150 0
1FB17J 3.00 150 450 150 0 16 udl 9.01 0.00
1FB17K 3.00 150 450 150 0 16 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB17L 3.00 150 450 150 0
1FB17M 3.00 150 450 150 0 17 udl 9.01 0.00
1FB17N 3.00 150 450 150 0 17 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB17P 3.00 150 450 150 0
1FB17Q 3.00 150 450 150 0
18 udl 9.01 0.00
1FB17R 3.00 150 450 150 0
18 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB17S 3.00 150 450 150 0

19 udl 9.60 8.00


19 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
Span Load Type D.L. L.L. X1 D.L. L.L. X2
No kN;kN/m m kN;kN/m m

Support Support Reaction-kN


1 udl 16.40 0.00 No D.L. L.L.
1 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86

7 23.1 2.5
2 udl 9.01 0.00
8 53.7 7.0
2 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
9 30.8 6.6
10 35.5 6.8
3 udl 9.01 0.00 11 34.2 6.8
3 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 12 34.6 6.8
13 34.5 6.8
4 udl 9.01 0.00 14 34.5 6.8
4 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 15 34.5 6.8
16 34.5 6.8
17 34.5 6.8
5 udl 9.01 0.00 18 34.5 6.8
5 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 19 34.5 6.8
20 34.5 6.8
6 udl 9.01 0.00 21 34.5 6.8
6 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 22 34.4 6.8
23 34.9 7.5
24 33.0 6.6
7 udl 9.01 0.00 25 40.4 22.7
7 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 26 14.2 12.8

8 udl 9.01 0.00


8 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
FACTORED MOMENT-kNm FACTORED SHEAR-kN

Page 1 of 4 Page 2 of 4
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB17.oo1 ...Continue

Span No Left Span Right Left Right 87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB17 0.0 24.8 -26.7 36.9 53.0 1FB17L 121 101 120 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB17A -26.7 8.5 -15.5 34.7 27.6 87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
1FB17B -15.5 12.0 -18.3 30.0 31.9
1FB17C -18.3 10.9 -17.4 31.1 30.6 1FB17M 120 101 121 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB17D -17.4 11.2 -17.6 30.8 30.9 87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
1FB17E -17.6 11.1 -17.6 30.9 30.8
1FB17F -17.6 11.1 -17.6 30.9 30.9
1FB17G -17.6 11.1 -17.6 30.9 30.9 1FB17N 121 101 120 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB17H -17.6 11.1 -17.6 30.9 30.9 87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
1FB17I -17.6 11.1 -17.6 30.9 30.9
1FB17J -17.6 11.1 -17.6 30.9 30.9 1FB17P 120 101 126 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB17K -17.6 11.1 -17.6 30.9 30.9 87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
1FB17L -17.6 11.1 -17.6 30.9 30.9
1FB17M -17.6 11.1 -17.6 30.8 30.9
1FB17N -17.6 11.2 -17.5 30.9 30.8 1FB17Q 126 101 113 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB17P -17.5 11.0 -18.4 30.7 31.2 87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
1FB17Q -18.4 12.2 -16.6 32.2 30.4
1FB17R -16.6 9.8 -28.6 29.3 35.5 1FB17R 113 101 201 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB17S -28.6 27.5 0.0 58.5 41.1 87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB17S 201 101 101 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side 87 193 96 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
No. Left Span Right Left Span Right Bar

1FB17 101 101 187 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top Span Stress-N/mm2 Vc-N/mm2 Link Defl'n
87 173 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot No L R L R L S R ratio

1FB17A 187 101 106 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB17 0.59 0.85 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 7.33
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB17A 0.56 0.44 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB17B 0.48 0.51 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB17B 106 101 125 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB17C 0.50 0.49 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB17D 0.49 0.50 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB17E 0.50 0.49 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB17F 0.49 0.49 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB17C 125 101 119 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB17G 0.49 0.49 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB17H 0.49 0.49 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB17I 0.49 0.49 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB17D 119 101 121 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB17J 0.49 0.49 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB17K 0.49 0.49 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB17L 0.49 0.49 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB17M 0.49 0.50 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB17E 121 101 120 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB17N 0.50 0.49 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB17P 0.49 0.50 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB17Q 0.52 0.49 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB17F 120 101 121 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB17R 0.47 0.57 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB17S 0.94 0.66 0.45 0.45 1R 6-150 1R 6-200 1R 6-200 6.66

1FB17G 121 101 121 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB17H 121 101 121 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB17I 121 101 121 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB17J 121 101 121 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB17K 121 101 121 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top

Page 3 of 4 Page 4 of 4
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB18.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56

Type in the Job Description yourself

ALONG GRID : F1;/6-7; FILE NAME : 1FB18; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB18 3.00 150 550 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.36 0.00


1 point load 48.73 9.54 1.00
1 trapeziodal 5.40 4.05 X1 = 0.00 X2 = 3.00 X = 1.35
1 trapeziodal 2.41 1.80 X1 = 1.00 X2 = 3.00 X = 0.60

Support Support Reaction-kN


No D.L. L.L.

6 52.2 10.6
7 37.0 8.2

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB18 0.0 80.9 0.0 89.9 65.0

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB18 123 123 123 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
244 489 244 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB18 1.16 0.84 0.59 0.59 1R 6-125 1R 6-200 1R 6-200 5.00

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB19.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:55 1FB19A 0.73 0.25 0.67 0.59 1R 6-125 1R 6-125 1R 6-125 11.72

Type in the Job Description yourself

ALONG GRID : E;/1-5; FILE NAME : 1FB19; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB19 7.50 225 600 225 0


1FB19A 3.04 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

2 udl 3.23 0.00


2 isos. tri-lar 6.07 4.55 X1 = 0.00 X2 = 3.02
2 trapeziodal 6.01 4.51 X1 = 0.00 X2 = 3.02 X = 1.50

Support Support Reaction-kN


No D.L. L.L.

1 46.6 27.9
3 108.3 62.5
5 -12.2 6.2

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB19 0.0 168.5 -187.1 109.9 159.2


1FB19A -187.1 0.6 0.0 92.4 -31.0

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB19 202 215 1078 2Y12= 2x1 2Y12= 2x1 3Y25= 3x1 Top
477 954 286 2Y25= 2x1 2Y25= 2x1 2Y16= 2x1 Bot

1FB19A 1078 698 202 3Y25= 3x1 2Y25= 2x1 2Y25= 2x1 Top
175 202 175 2Y16= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB19 0.86 1.26 0.58 0.67 1R10-300 1R10-300 1R10-250 2.33

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB20.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:55

Type in the Job Description yourself

ALONG GRID : D;/5-6; FILE NAME : 1FB20; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB20 3.00 150 450 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.01 0.00


1 isos. tri-lar 5.92 4.44 X1 = 0.02 X2 = 3.00
1 isos. tri-lar 5.92 4.44 X1 = 0.02 X2 = 3.00

Support Support Reaction-kN


No D.L. L.L.

5 22.3 6.6
6 22.4 6.7

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB20 0.0 37.2 0.0 41.7 42.1

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB20 101 101 101 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
134 268 134 2Y16= 2x1 2Y16= 2x1 2Y16= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB20 0.67 0.67 0.55 0.55 1R 6-200 1R 6-200 1R 6-200 5.07

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB21.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:55

Type in the Job Description yourself

ALONG GRID : D;/25-26; FILE NAME : 1FB21; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB21 2.83 150 450 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.01 0.00


1 isos. tri-lar 6.01 4.51 X1 = -0.07 X2 = 2.91

Support Support Reaction-kN


No D.L. L.L.

25 17.2 3.4
26 17.3 3.4

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB21 0.0 23.4 0.0 29.5 29.5

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB21 101 101 101 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 162 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB21 0.47 0.47 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 6.28

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB22.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:55

Type in the Job Description yourself

ALONG GRID : D1;/6a-7; FILE NAME : 1FB22; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB22 2.00 150 450 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.01 0.00


1 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60
1 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60

Support Support Reaction-kN


No D.L. L.L.

6a 12.4 2.6
7 12.4 2.6

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB22 0.0 11.9 0.0 21.4 21.4

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB22 101 101 101 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB22 0.34 0.34 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 9.28

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB23.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:55

Type in the Job Description yourself

ALONG GRID : D2;/6a-7; FILE NAME : 1FB23; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB23 2.00 150 450 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.01 0.00


1 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60
1 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60

Support Support Reaction-kN


No D.L. L.L.

6a 12.4 2.6
7 12.4 2.6

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB23 0.0 11.9 0.0 21.4 21.4

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB23 101 101 101 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB23 0.34 0.34 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 9.28

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB24.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:55

Type in the Job Description yourself

ALONG GRID : C;/1-3; FILE NAME : 1FB24; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB24 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
1 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

1 57.2 33.9
3 57.2 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB24 0.0 251.6 0.0 134.2 134.2

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB24 202 202 202 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
810 1620 810 2Y25= 2x1 4Y25= 3x2 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB24 1.05 1.05 0.58 0.58 1R 6-100 1R 6-125 1R 6-100 1.60

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB25.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:55

Type in the Job Description yourself

ALONG GRID : C1;/6a-7; FILE NAME : 1FB25; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB25 2.00 150 450 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.01 0.00


1 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60
1 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60

Support Support Reaction-kN


No D.L. L.L.

6a 12.4 2.6
7 12.4 2.6

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB25 0.0 11.9 0.0 21.4 21.4

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB25 101 101 101 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB25 0.34 0.34 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 9.28

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB26.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB26A 1.09 0.47 0.50 0.50 1R 6-125 1R 6-150 1R 6-150 10.63

Type in the Job Description yourself

ALONG GRID : B;/5-7; FILE NAME : 1FB26; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB26 3.00 150 600 150 0


1FB26A 3.00 150 600 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.14 0.00


1 isos. tri-lar 5.92 4.44 X1 = 0.02 X2 = 3.00

2 udl 9.14 0.00


2 point load 48.73 9.54 1.00
2 trapeziodal 2.41 1.80 X1 = 1.00 X2 = 3.00 X = 0.60

Support Support Reaction-kN


No D.L. L.L.

5 9.3 2.8
6 83.2 13.7
7 23.4 3.8

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB26 0.0 12.0 -44.8 20.0 45.7


1FB26A -44.8 44.9 0.0 92.7 39.8

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB26 135 135 231 2Y12= 2x1 2Y12= 2x1 2Y16= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB26A 231 135 135 2Y16= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 231 116 2Y12= 2x1 2Y16= 2x1 2Y16= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB26 0.24 0.54 0.41 0.50 1R 6-200 1R 6-200 1R 6-200 10.67

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB27.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:55


13 udl 9.14 0.00
Type in the Job Description yourself
14 udl 9.14 0.00
ALONG GRID : B;/7-26; FILE NAME : 1FB27; Code : BS8110:1985
15 udl 9.14 0.00
D.L. L.L. fcu fy fyv cover span cantilever
1.40 1.60 25 410 250 25 19 Nil 16 udl 9.14 0.00

17 udl 9.14 0.00


Span No Span-m Width-mm Depth-mm F-width F-depth
18 udl 9.14 0.00
1FB27 3.00 150 600 150 0
1FB27A 3.00 150 600 150 0
1FB27B 3.00 150 600 150 0 19 udl 9.14 0.00
1FB27C 3.00 150 600 150 0 19 isos. tri-lar 6.01 4.51 X1 = 0.00 X2 = 3.00
1FB27D 3.00 150 600 150 0
1FB27E 3.00 150 600 150 0
1FB27F 3.00 150 600 150 0
Support Support Reaction-kN
1FB27G 3.00 150 600 150 0
1FB27H 3.00 150 600 150 0 No D.L. L.L.
1FB27I 3.00 150 600 150 0
1FB27J 3.00 150 600 150 0 7 10.9 0.0
1FB27K 3.00 150 600 150 0 8 31.1 0.0
1FB27L 3.00 150 600 150 0 9 26.5 0.0
1FB27M 3.00 150 600 150 0 10 27.7 0.0
1FB27N 3.00 150 600 150 0 11 27.4 0.0
1FB27P 3.00 150 600 150 0 12 27.5 0.0
1FB27Q 3.00 150 600 150 0 13 27.5 0.0
1FB27R 3.00 150 600 150 0 14 27.5 0.0
1FB27S 3.00 150 600 150 0 15 27.5 0.0
16 27.5 0.0
17 27.5 0.0
18 27.5 0.0
Span Load Type D.L. L.L. X1 D.L. L.L. X2 19 27.5 0.0
No kN;kN/m m kN;kN/m m 20 27.5 0.0
21 27.5 0.1
1 udl 9.14 0.00 22 27.3 0.0
23 28.1 0.3
24 25.3 0.0
2 udl 9.14 0.00 25 37.4 4.7
26 14.6 2.9
3 udl 9.14 0.00

4 udl 9.14 0.00 FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right
5 udl 9.14 0.00
1FB27 0.0 9.7 -12.7 15.8 23.5
6 udl 9.14 0.00 1FB27A -12.7 5.4 -10.0 21.1 19.3
1FB27B -10.0 6.4 -10.8 20.0 20.5
7 udl 9.14 0.00 1FB27C -10.8 6.2 -10.6 20.3 20.2
1FB27D -10.6 6.2 -10.7 20.2 20.3
1FB27E -10.7 6.2 -10.6 20.2 20.2
8 udl 9.14 0.00 1FB27F -10.6 6.2 -10.6 20.2 20.2
1FB27G -10.6 6.2 -10.6 20.2 20.2
9 udl 9.14 0.00 1FB27H -10.6 6.2 -10.6 20.2 20.2
1FB27I -10.6 6.2 -10.6 20.2 20.2
1FB27J -10.6 6.2 -10.6 20.2 20.2
10 udl 9.14 0.00 1FB27K -10.6 6.2 -10.6 20.2 20.2
1FB27L -10.6 6.2 -10.6 20.2 20.2
11 udl 9.14 0.00 1FB27M -10.6 6.2 -10.7 20.2 20.3
1FB27N -10.7 6.3 -10.6 20.3 20.2
1FB27P -10.6 6.1 -11.2 20.1 20.5
12 udl 9.14 0.00

Page 1 of 4 Page 2 of 4
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB27.oo1 ...Continue

1FB27Q -11.2 7.0 -9.4 21.2 19.7


1FB27R -9.4 4.7 -18.6 18.3 23.6 1FB27R 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB27S -18.6 18.5 0.0 37.1 25.5 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB27S 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
No. Left Span Right Left Span Right Bar

1FB27 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top Span Stress-N/mm2 Vc-N/mm2 Link Defl'n
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot No L R L R L S R ratio

1FB27A 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
1FB27 0.19 0.28 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
1FB27A 0.25 0.23 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB27B 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB27B 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB27C 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB27D 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB27E 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB27C 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB27F 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB27G 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB27H 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB27I 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB27D 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB27J 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB27K 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB27L 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB27E 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB27M 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot 1FB27N 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB27P 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB27Q 0.25 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB27F 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top 1FB27R 0.22 0.28 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
1FB27S 0.44 0.30 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB27G 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB27H 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB27I 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB27J 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB27K 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB27L 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB27M 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB27N 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB27P 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB27Q 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Page 3 of 4 Page 4 of 4
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB28.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:55

Type in the Job Description yourself


Span Stress-N/mm2 Vc-N/mm2 Link Defl'n
No L R L R L S R ratio
ALONG GRID : A;/1-5; FILE NAME : 1FB28; Code : BS8110:1985
1FB28 0.53 0.79 0.41 0.50 1R 6-200 1R 6-200 1R 6-200 8.37
D.L. L.L. fcu fy fyv cover span cantilever 1FB28A 0.72 0.64 0.50 0.41 1R 6-200 1R 6-200 1R 6-200 8.54
1.40 1.60 25 410 250 25 3 Nil 1FB28B 0.50 0.31 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.53

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB28 3.75 150 600 150 0


1FB28A 3.75 150 600 150 0
1FB28B 3.04 150 600 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.55 0.00

2 udl 9.55 0.00


2 partial udl 6.01 4.51 -3.75 6.01 4.51 3.75

3 udl 9.55 0.00


3 isos. tri-lar 6.07 4.55 X1 = 0.00 X2 = 3.02

Support Support Reaction-kN


No D.L. L.L.

1 23.0 7.5
2 66.8 20.2
3 51.3 14.3
5 14.0 3.3

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB28 0.0 35.1 -45.4 45.1 66.5


1FB28A -45.4 21.7 -31.6 60.5 54.5
1FB28B -31.6 19.4 0.0 42.7 26.4

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB28 135 135 234 2Y12= 2x1 2Y12= 2x1 2Y16= 2x1 Top
116 178 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB28A 234 135 160 2Y16= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB28B 160 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB29.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56


13 udl 9.14 0.00
Type in the Job Description yourself
14 udl 9.14 0.00
ALONG GRID : 1;/U-A; FILE NAME : 1FB29; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever Support Support Reaction-kN
1.40 1.60 25 410 250 25 14 Nil No D.L. L.L.

U 14.6 2.9
Span No Span-m Width-mm Depth-mm F-width F-depth
T 37.4 4.7
S 25.3 0.1
1FB29 3.00 150 600 150 0 R 28.0 0.3
1FB29A 3.00 150 600 150 0 Q 27.6 0.2
1FB29B 3.00 150 600 150 0 N 26.5 0.1
1FB29C 3.00 150 600 150 0 M 32.8 4.0
1FB29D 3.00 150 600 150 0 L 32.4 4.0
1FB29E 3.00 150 600 150 0 K 27.8 0.4
1FB29F 3.00 150 600 150 0 J 22.9 0.2
1FB29G 3.00 150 600 150 0 H 48.4 5.6
1FB29H 3.00 150 600 150 0 F 68.0 8.7
1FB29I 3.00 150 600 150 0 E 19.6 0.0
1FB29J 3.00 150 600 150 0 C 32.8 0.4
1FB29K 3.00 150 600 150 0 A 10.6 0.0
1FB29L 3.00 150 600 150 0
1FB29M 3.00 150 600 150 0
FACTORED MOMENT-kNm FACTORED SHEAR-kN
Span No Left Span Right Left Right
Span Load Type D.L. L.L. X1 D.L. L.L. X2
No kN;kN/m m kN;kN/m m
1FB29 0.0 18.5 -18.6 25.5 37.1
1FB29A -18.6 4.7 -9.5 23.6 18.3
1 udl 9.14 0.00 1FB29B -9.5 7.0 -11.2 19.8 21.1
1 isos. tri-lar 6.01 4.51 X1 = 0.00 X2 = 3.00 1FB29C -11.2 6.0 -10.9 20.4 20.3
1FB29D -10.9 6.7 -10.2 20.7 20.1
2 udl 9.14 0.00 1FB29E -10.2 5.5 -15.4 19.5 22.2
1FB29F -15.4 13.4 -15.1 32.1 31.9
1FB29G -15.1 5.3 -11.3 21.9 20.0
3 udl 9.14 0.00 1FB29H -11.3 8.3 -8.6 21.9 19.7
1FB29I -8.6 3.4 -26.7 16.6 27.0
4 udl 9.14 0.00 1FB29J -26.7 41.9 -33.3 51.7 81.0
1FB29K -33.3 3.0 -6.6 30.0 14.6
1FB29L -6.6 8.1 -14.2 17.9 23.6
5 udl 9.14 0.00 1FB29M -14.2 9.4 0.0 23.9 15.5

6 udl 9.14 0.00


Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side
7 udl 9.14 0.00 No. Left Span Right Left Span Right Bar
7 isos. tri-lar 6.01 4.51 X1 = 0.00 X2 = 3.00
1FB29 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
8 udl 9.14 0.00 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

9 udl 9.14 0.00 1FB29A 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
10 udl 9.14 0.00
1FB29B 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
11 udl 9.14 0.00 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
11 point load 48.73 9.54 2.00
11 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60 1FB29C 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
12 udl 9.14 0.00

Page 1 of 3 Page 2 of 3
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB29.oo1 ...Continue

1FB29D 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB29E 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB29F 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB29G 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB29H 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB29I 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB29J 135 135 169 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 214 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB29K 169 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB29L 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB29M 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB29 0.30 0.44 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67


1FB29A 0.28 0.22 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB29B 0.24 0.25 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB29C 0.24 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB29D 0.25 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB29E 0.23 0.26 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB29F 0.38 0.38 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB29G 0.26 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB29H 0.26 0.24 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB29I 0.20 0.32 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB29J 0.61 0.95 0.41 0.41 1R 6-175 1R 6-175 1R 6-150 8.82
1FB29K 0.36 0.17 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB29L 0.21 0.28 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB29M 0.28 0.19 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67

Page 3 of 3
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB30.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56

Type in the Job Description yourself

ALONG GRID : 1a;/H-G1; FILE NAME : 1FB30; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB30 2.00 150 450 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.01 0.00


1 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60
1 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60

Support Support Reaction-kN


No D.L. L.L.

H 12.4 2.6
G1 12.4 2.6

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB30 0.0 11.9 0.0 21.4 21.4

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB30 101 101 101 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB30 0.34 0.34 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 9.28

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB31.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56

Type in the Job Description yourself

ALONG GRID : 1b;/H-G1; FILE NAME : 1FB31; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB31 2.00 150 450 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.01 0.00


1 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60
1 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60

Support Support Reaction-kN


No D.L. L.L.

H 12.4 2.6
G1 12.4 2.6

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB31 0.0 11.9 0.0 21.4 21.4

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB31 101 101 101 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB31 0.34 0.34 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 9.28

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB32.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56

Type in the Job Description yourself

ALONG GRID : 1c;/H-G1; FILE NAME : 1FB32; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB32 2.00 150 450 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.01 0.00


1 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60
1 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60

Support Support Reaction-kN


No D.L. L.L.

H 12.4 2.6
G1 12.4 2.6

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB32 0.0 11.9 0.0 21.4 21.4

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB32 101 101 101 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB32 0.34 0.34 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 9.28

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB33.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56

Type in the Job Description yourself

ALONG GRID : 2;/U-T; FILE NAME : 1FB33; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB33 2.93 150 450 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.01 0.00


1 isos. tri-lar 6.01 4.51 X1 = -0.02 X2 = 2.96

Support Support Reaction-kN


No D.L. L.L.

U 17.7 3.4
T 17.7 3.4

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB33 0.0 24.9 0.0 30.1 30.2

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB33 101 101 101 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 173 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB33 0.48 0.48 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 5.76

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB34.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56

Type in the Job Description yourself

ALONG GRID : 2;/M-L; FILE NAME : 1FB34; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB34 3.00 150 450 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.01 0.00


1 isos. tri-lar 6.01 4.51 X1 = 0.00 X2 = 3.00
1 isos. tri-lar 6.01 4.51 X1 = 0.00 X2 = 3.00

Support Support Reaction-kN


No D.L. L.L.

M 22.6 6.8
L 22.6 6.8

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB34 0.0 37.7 0.0 42.4 42.4

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB34 101 101 101 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
135 271 135 2Y16= 2x1 2Y16= 2x1 2Y16= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB34 0.68 0.68 0.55 0.55 1R 6-200 1R 6-200 1R 6-200 5.02

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB35.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56

Type in the Job Description yourself

ALONG GRID : 2a;/H-F; FILE NAME : 1FB35; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB35 3.00 150 550 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.36 0.00


1 point load 48.73 9.54 2.00
1 trapeziodal 5.40 4.05 X1 = 0.00 X2 = 3.00 X = 1.35
1 trapeziodal 2.41 1.80 X1 = 0.00 X2 = 2.00 X = 0.60

Support Support Reaction-kN


No D.L. L.L.

H 37.0 8.2
F 52.2 10.6

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB35 0.0 80.9 0.0 65.0 89.9

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB35 123 123 123 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
244 489 244 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB35 0.84 1.16 0.59 0.59 1R 6-200 1R 6-200 1R 6-125 5.00

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB36.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 10 partial udl 3.45 2.58 0.00 3.45 2.58 4.26

Type in the Job Description yourself 11 udl 9.01 0.00


11 point load 10.73 4.00 1.27
11 isos. tri-lar 3.46 2.58 X1 = 1.26 X2 = 3.00
ALONG GRID : 3;/U-A; FILE NAME : 1FB36; Code : BS8110:1985 11 trapeziodal 5.40 4.05 X1 = 0.00 X2 = 3.00 X = 1.35

D.L. L.L. fcu fy fyv cover span cantilever 12 udl 9.01 0.00
1.40 1.60 25 410 250 25 14 Nil 12 isos. tri-lar 6.01 4.51 X1 = 0.00 X2 = 3.00

13 udl 9.01 0.00


Span No Span-m Width-mm Depth-mm F-width F-depth

14 udl 9.01 0.00


1FB36 3.00 150 450 150 0 14 trapeziodal 6.07 4.55 X1 = -3.00 X2 = 3.00 X = 1.50
1FB36A 3.00 150 450 150 0
1FB36B 3.00 150 450 150 0
1FB36C 3.00 150 450 150 0
1FB36D 3.00 150 450 150 0 Support Support Reaction-kN
1FB36E 3.00 150 450 150 0 No D.L. L.L.
1FB36F 3.00 150 450 150 0
1FB36G 3.00 150 450 150 0
1FB36H 3.00 150 450 150 0 U 14.2 12.8
1FB36I 3.00 150 450 150 0 T 40.4 22.7
1FB36J 3.00 150 450 150 0 S 33.0 6.7
1FB36K 3.00 150 450 150 0 R 34.8 7.5
1FB36L 3.00 150 450 150 0 Q 34.6 7.0
1FB36M 3.00 150 450 150 0 N 33.5 6.8
M 39.8 10.8
L 39.6 10.8
K 34.0 7.1
Span Load Type D.L. L.L. X1 D.L. L.L. X2 J 34.1 8.2
No kN;kN/m m kN;kN/m m H 49.0 15.2
F 45.2 13.0
E 33.3 8.8
1 udl 9.60 8.00 C 50.3 15.3
1 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 A 14.2 3.4

2 udl 9.01 0.00


2 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
FACTORED MOMENT-kNm FACTORED SHEAR-kN
Span No Left Span Right Left Right
3 udl 9.01 0.00
3 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB36 0.0 27.6 -28.6 41.1 58.5
4 udl 9.01 0.00 1FB36A -28.6 9.8 -16.6 35.5 29.3
4 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 1FB36B -16.6 12.3 -18.4 30.5 32.1
1FB36C -18.4 11.0 -17.8 31.1 30.9
1FB36D -17.8 11.6 -17.2 31.4 30.7
5 udl 9.01 0.00 1FB36E -17.2 10.4 -22.3 30.1 32.8
5 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 1FB36F -22.3 18.3 -22.2 42.6 42.6
1FB36G -22.2 10.4 -17.7 32.8 30.4
6 udl 9.01 0.00 1FB36H -17.7 12.4 -17.4 31.6 31.2
6 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 1FB36I -17.4 10.1 -27.6 33.2 38.6
1FB36J -27.6 26.2 -27.1 56.9 49.9
1FB36K -27.1 11.9 -18.4 36.9 31.8
7 udl 9.01 0.00 1FB36L -18.4 13.6 -27.0 32.9 46.6
7 isos. tri-lar 6.01 4.51 X1 = 0.00 X2 = 3.00 1FB36M -27.0 19.5 0.0 49.6 26.2
7 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86

8 udl 9.01 0.00


8 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side
No. Left Span Right Left Span Right Bar
9 udl 9.01 0.00
9 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86 1FB36 101 101 201 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
96 193 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
10 udl 9.01 0.00

Page 1 of 3 Page 2 of 3
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB36.oo1 ...Continue

1FB36A 201 101 114 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB36B 114 101 126 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB36C 126 101 122 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB36D 122 101 118 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB36E 118 101 154 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB36F 154 101 154 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 125 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB36G 154 101 122 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB36H 122 101 120 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB36I 120 101 194 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB36J 194 101 190 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 183 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB36K 190 101 126 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB36L 126 101 189 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 101 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB36M 189 101 101 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
87 134 87 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB36 0.66 0.94 0.45 0.45 1R 6-200 1R 6-200 1R 6-150 6.66


1FB36A 0.57 0.47 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB36B 0.49 0.52 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB36C 0.50 0.50 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB36D 0.50 0.49 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB36E 0.48 0.53 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB36F 0.68 0.68 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB36G 0.53 0.49 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB36H 0.51 0.50 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB36I 0.53 0.62 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB36J 0.91 0.80 0.45 0.45 1R 6-175 1R 6-200 1R 6-200 6.98
1FB36K 0.59 0.51 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB36L 0.53 0.74 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05
1FB36M 0.79 0.42 0.45 0.45 1R 6-200 1R 6-200 1R 6-200 8.05

Page 3 of 3
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB37.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 No D.L. L.L.

Type in the Job Description yourself U 8.9 2.5


T 26.2 7.0
S 22.0 6.6
ALONG GRID : 4;/U-G; FILE NAME : 1FB37; Code : BS8110:1985 R 23.1 6.8
Q 22.8 6.8
D.L. L.L. fcu fy fyv cover span cantilever N 23.0 6.8
M 22.6 6.8
1.40 1.60 25 410 250 25 10 Nil L 24.1 7.2
K 18.4 6.7
Span No Span-m Width-mm Depth-mm F-width F-depth J 36.9 11.0
G 15.0 4.7
1FB37 3.00 150 600 150 0
1FB37A 3.00 150 600 150 0
1FB37B 3.00 150 600 150 0 FACTORED MOMENT-kNm FACTORED SHEAR-kN
1FB37C 3.00 150 600 150 0 Span No Left Span Right Left Right
1FB37D 3.00 150 600 150 0
1FB37E 3.00 150 600 150 0
1FB37F 3.00 150 600 150 0 1FB37 0.0 12.0 -15.1 16.8 25.5
1FB37G 3.00 150 600 150 0 1FB37A -15.1 7.7 -12.5 23.2 21.3
1FB37H 3.00 150 600 150 0 1FB37B -12.5 8.7 -13.3 22.1 22.6
1FB37I 4.28 150 600 150 0 1FB37C -13.3 8.5 -13.0 22.4 22.3
1FB37D -13.0 8.5 -13.2 22.3 22.4
1FB37E -13.2 8.6 -12.9 22.5 22.3
1FB37F -12.9 8.3 -14.2 22.1 22.8
Span Load Type D.L. L.L. X1 D.L. L.L. X2 1FB37G -14.2 10.2 -10.7 24.1 21.3
No kN;kN/m m kN;kN/m m 1FB37H -10.7 5.7 -28.0 18.6 28.6
1FB37I -28.0 25.7 0.0 41.2 28.7
1 udl 5.15 0.00
1 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side
2 udl 5.15 0.00 No. Left Span Right Left Span Right Bar
2 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB37 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
3 udl 5.15 0.00 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
3 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB37A 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
4 udl 5.15 0.00 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
4 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB37B 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
5 udl 5.15 0.00 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
5 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB37C 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
6 udl 5.15 0.00 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
6 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB37D 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
7 udl 5.15 0.00 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
7 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB37E 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
8 udl 5.15 0.00 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
8 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB37F 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
9 udl 5.15 0.00 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
9 trapeziodal 3.46 2.58 X1 = 0.00 X2 = 3.00 X = 0.86
1FB37G 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
10 udl 5.15 0.00 116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
10 partial udl 3.45 2.58 0.00 3.45 2.58 4.26
1FB37H 135 135 141 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
Support Support Reaction-kN

Page 1 of 3 Page 2 of 3
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB37.oo1 ...Continue

1FB37I 141 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB37 0.20 0.30 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67


1FB37A 0.28 0.25 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB37B 0.26 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB37C 0.27 0.26 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB37D 0.27 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB37E 0.27 0.26 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB37F 0.26 0.27 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB37G 0.29 0.25 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB37H 0.22 0.34 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 10.67
1FB37I 0.49 0.34 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 7.48

Page 3 of 3
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB38.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:57


1FB38 202 368 737 2Y25= 2x1 2Y25= 2x1 2Y25= 2x1 Top
Type in the Job Description yourself 175 202 175 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

ALONG GRID : 5;/G-A; FILE NAME : 1FB38; Code : BS8110:1985 1FB38A 737 420 202 2Y25= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
D.L. L.L. fcu fy fyv cover span cantilever
1FB38B 202 202 307 2Y20= 2x1 2Y12= 2x1 2Y16= 2x1 Top
1.40 1.60 25 410 250 25 4 Both 175 278 175 2Y12= 2x1 2Y16= 2x1 2Y12= 2x1 Bot

Span No Span-m Width-mm Depth-mm F-width F-depth 1FB38C 307 202 202 2Y16= 2x1 2Y16= 2x1 2Y16= 2x1 Top
175 202 175 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot
1FB38 1.73 225 600 225 0
1FB38A 3.75 225 600 225 0
1FB38B 3.75 225 600 225 0 Span Stress-N/mm2 Vc-N/mm2 Link Defl'n
1FB38C 1.50 225 600 225 0 No L R L R L S R ratio

1FB38 0.00 0.71 0.59 0.59 1R 6-125 1R 6-125 1R 6-125 3.37


Span Load Type D.L. L.L. X1 D.L. L.L. X2 1FB38A 0.75 0.34 0.59 0.50 1R 6-125 1R 6-125 1R 6-125 9.00
No kN;kN/m m kN;kN/m m 1FB38B 0.58 0.71 0.50 0.43 1R 6-125 1R 6-125 1R 6-125 8.31
1FB38C 0.47 0.00 0.43 0.43 1R 6-125 1R 6-125 1R 6-125 5.33
1 udl 3.23 0.00
1 point load 34.98 10.57 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 10.63 0.00


2 point load -12.28 6.20 3.00
2 isos. tri-lar 6.01 4.51 X1 = 0.00 X2 = 3.00
2 trapeziodal 5.92 4.44 X1 = 0.00 X2 = 3.75 X = 1.48

3 udl 10.63 0.00


3 trapeziodal 5.92 4.44 X1 = 0.00 X2 = 3.75 X = 1.48
3 trapeziodal 6.07 4.55 X1 = -0.75 X2 = 5.25 X = 1.50

4 udl 10.63 0.00


4 point load 13.96 3.28 1.50

Support Support Reaction-kN


No D.L. L.L.

F 93.8 31.5
D 32.8 33.5
B 80.6 22.1

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB38 0.0 -67.7 -134.2 0.0 89.2


1FB38A -134.2 19.4 -38.7 94.5 43.2
1FB38B -38.7 54.4 -59.9 73.2 90.5
1FB38C -59.9 -26.5 0.0 59.0 0.0

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB39.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:57 116 298 116 2Y12= 2x1 2Y16= 2x1 2Y12= 2x1 Bot

Type in the Job Description yourself 1FB39B 381 135 135 2Y16= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 193 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

ALONG GRID : 6;/G-B; FILE NAME : 1FB39; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever Span Stress-N/mm2 Vc-N/mm2 Link Defl'n
No L R L R L S R ratio
1.40 1.60 25 410 250 25 3 Left
1FB39 0.00 0.76 0.58 0.58 1R 6-200 1R 6-200 1R 6-200 3.31
Span No Span-m Width-mm Depth-mm F-width F-depth 1FB39A 1.10 1.47 0.58 0.50 1R10-300 1R10-300 1R10-225 7.23
1FB39B 0.84 0.51 0.50 0.41 1R 6-200 1R 6-200 1R 6-200 7.81
1FB39 1.73 150 600 150 0
1FB39A 3.75 150 600 150 0
1FB39B 3.75 150 600 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 2.15 0.00


1 point load 23.22 6.85 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 9.55 0.00


2 point load 52.11 10.54 2.70
2 isos. tri-lar 5.40 4.05 X1 = 0.00 X2 = 2.70
2 trapeziodal 5.92 4.44 X1 = 0.00 X2 = 3.75 X = 1.48

3 udl 9.55 0.00


3 partial udl 2.00 1.50 -1.04 2.00 1.50 3.75
3 trapeziodal 5.92 4.44 X1 = 0.00 X2 = 3.75 X = 1.48

Support Support Reaction-kN


No D.L. L.L.

F 81.1 26.1
D 99.9 30.4
B 19.5 7.8

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB39 0.0 -45.7 -93.2 0.0 64.2


1FB39A -93.2 57.0 -71.7 92.6 124.9
1FB39B -71.7 37.9 0.0 71.4 43.1

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB39 135 255 511 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB39A 511 217 381 2Y20= 2x1 2Y12= 2x1 2Y16= 2x1 Top

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB40.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56

Type in the Job Description yourself

ALONG GRID : 6a;/F1-B; FILE NAME : 1FB40; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 1 Nil

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB40 4.80 150 550 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.36 0.00


1 point load 12.38 2.52 1.20
1 point load 12.38 2.52 2.40
1 point load 12.38 2.52 3.60
1 partial udl 2.00 1.50 0.00 2.00 1.50 4.80
1 isos. tri-lar 2.41 1.80 X1 = 0.00 X2 = 1.20
1 isos. tri-lar 2.41 1.80 X1 = 1.20 X2 = 2.40
1 isos. tri-lar 2.41 1.80 X1 = 2.40 X2 = 3.59
1 isos. tri-lar 2.41 1.80 X1 = 3.59 X2 = 4.80

Support Support Reaction-kN


No D.L. L.L.

F1 48.8 9.6
B 48.8 9.6

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB40 0.0 113.1 0.0 83.5 83.5

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB40 123 123 123 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
364 728 364 2Y25= 2x1 2Y25= 2x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB40 1.08 1.08 0.69 0.69 1R 6-200 1R 6-200 1R 6-200 2.76

Page 1 of 1
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB41.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:57


1FB41 337 337 337 2Y16= 2x1 2Y16= 2x1 2Y16= 2x1 10Y12
Type in the Job Description yourself 292 337 292 2Y16= 2x1 2Y16= 2x1 2Y16= 2x1 Bot

ALONG GRID : 7;/G-B; FILE NAME : 1FB41; Code : BS8110:1985 1FB41A 337 337 337 2Y16= 2x1 2Y16= 2x1 2Y16= 2x1 10Y12
292 337 292 2Y16= 2x1 2Y16= 2x1 2Y16= 2x1 Bot
D.L. L.L. fcu fy fyv cover span cantilever
1FB41B 337 337 337 2Y16= 2x1 2Y16= 2x1 2Y16= 2x1 10Y12
1.40 1.60 25 410 250 25 3 Left 292 337 292 2Y16= 2x1 2Y16= 2x1 2Y16= 2x1 Bot

Span No Span-m Width-mm Depth-mm F-width F-depth


Span Stress-N/mm2 Vc-N/mm2 Link Defl'n
1FB41 1.73 150 1500 150 0 No L R L R L S R ratio
1FB41A 3.75 150 1500 150 0
1FB41B 3.75 150 1500 150 0
1FB41 0.00 0.29 0.36 0.36 1R 6-200 1R 6-200 1R 6-200 12.56
1FB41A 0.45 0.61 0.36 0.36 1R 6-200 1R 6-200 1R 6-200 21.51
1FB41B 0.61 0.35 0.36 0.36 1R 6-200 1R 6-200 1R 6-200 21.51
Span Load Type D.L. L.L. X1 D.L. L.L. X2
No kN;kN/m m kN;kN/m m

1 udl 5.38 0.00


1 point load 18.20 4.96 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 12.78 0.00


2 point load 36.99 8.20 2.70
2 isos. tri-lar 5.40 4.05 X1 = 0.00 X2 = 2.70
2 isos. tri-lar 2.41 1.80 X1 = 2.70 X2 = 3.90

3 udl 12.78 0.00


3 point load 12.38 2.52 0.15
3 point load 12.38 2.52 1.35
3 point load 12.38 2.52 2.55
3 partial udl 6.01 4.51 -3.75 6.01 4.51 3.75
3 isos. tri-lar 2.41 1.80 X1 = 0.15 X2 = 1.35
3 isos. tri-lar 2.41 1.80 X1 = 1.35 X2 = 2.54
3 isos. tri-lar 2.41 1.80 X1 = 2.54 X2 = 3.75

Support Support Reaction-kN


No D.L. L.L.

F 83.6 25.8
D 139.4 40.1
B 38.7 12.0

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB41 0.0 -38.2 -82.6 0.0 61.9


1FB41A -82.6 48.5 -92.3 99.1 132.3
1FB41B -92.3 67.3 0.0 134.1 76.6

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB42.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB42A 1.17 1.00 0.50 0.58 1R10-225 1R10-300 1R10-300 2.17

Type in the Job Description yourself

ALONG GRID : 8;/G-B; FILE NAME : 1FB42; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB42 1.73 225 600 225 0


1FB42A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 26.12 6.98 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 3.23 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 102.3 47.4
B 49.9 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB42 0.0 -50.4 -102.8 0.0 71.0


1FB42A -102.8 224.3 0.0 147.9 126.9

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB42 202 273 547 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB42A 547 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
403 1345 672 2Y20= 2x1 3Y25= 3x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB42 0.00 0.56 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 3.81

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB43.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB43A 1.16 1.00 0.50 0.58 1R10-225 1R10-300 1R10-300 2.14

Type in the Job Description yourself

ALONG GRID : 9;/G-B; FILE NAME : 1FB43; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB43 1.73 225 600 225 0


1FB43A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 21.98 6.60 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 3.23 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 97.2 46.9
B 50.8 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB43 0.0 -44.3 -91.8 0.0 64.6


1FB43A -91.8 227.6 0.0 146.5 127.8

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB43 202 242 484 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB43A 484 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
411 1370 685 2Y20= 2x1 3Y25= 3x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB43 0.00 0.51 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.23

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB44.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB44A 1.37 1.21 0.50 0.58 1R10-125 1R10-125 1R10-125 1.93

Type in the Job Description yourself

ALONG GRID : 10;/G-B; FILE NAME : 1FB44; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB44 1.73 225 600 225 0


1FB44A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 23.09 6.77 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 8.22 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 117.2 47.2
B 69.3 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB44 0.0 -46.1 -94.9 0.0 66.5


1FB44A -94.9 275.8 0.0 173.1 153.8

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB44 202 251 502 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB44A 502 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
543 1811 905 2Y20= 2x1 4Y25= 3x2 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB44 0.00 0.53 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.10

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB45.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB45A 1.16 1.00 0.50 0.58 1R10-225 1R10-300 1R10-300 2.14

Type in the Job Description yourself

ALONG GRID : 11;/G-B; FILE NAME : 1FB45; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB45 1.73 225 600 225 0


1FB45A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 22.79 6.73 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 3.23 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 98.2 47.1
B 50.6 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB45 0.0 -45.6 -94.1 0.0 66.0


1FB45A -94.1 226.9 0.0 146.8 127.6

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB45 202 248 497 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB45A 497 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
409 1365 682 2Y20= 2x1 3Y25= 3x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB45 0.00 0.52 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.14

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB46.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB46A 1.16 1.00 0.50 0.58 1R10-225 1R10-300 1R10-300 2.14

Type in the Job Description yourself

ALONG GRID : 12;/G-B; FILE NAME : 1FB46; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB46 1.73 225 600 225 0


1FB46A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 22.87 6.74 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 3.23 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 98.3 47.1
B 50.6 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB46 0.0 -45.7 -94.3 0.0 66.1


1FB46A -94.3 226.8 0.0 146.8 127.6

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB46 202 249 498 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB46A 498 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
409 1365 682 2Y20= 2x1 3Y25= 3x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB46 0.00 0.52 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.13

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB47.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB47A 1.36 1.21 0.50 0.58 1R10-125 1R10-125 1R10-125 1.93

Type in the Job Description yourself

ALONG GRID : 13;/G-B; FILE NAME : 1FB47; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB47 1.73 225 600 225 0


1FB47A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 22.85 6.74 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 8.22 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 116.9 47.1
B 69.3 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB47 0.0 -45.7 -94.2 0.0 66.1


1FB47A -94.2 276.0 0.0 173.0 153.8

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB47 202 249 498 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB47A 498 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
543 1812 906 2Y20= 2x1 4Y25= 3x2 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB47 0.00 0.52 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.13

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB48.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB48A 1.16 1.00 0.50 0.58 1R10-225 1R10-300 1R10-300 2.14

Type in the Job Description yourself

ALONG GRID : 14;/G-B; FILE NAME : 1FB48; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB48 1.73 225 600 225 0


1FB48A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 22.86 6.74 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 3.23 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 98.2 47.1
B 50.6 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB48 0.0 -45.7 -94.2 0.0 66.1


1FB48A -94.2 226.9 0.0 146.8 127.6

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB48 202 249 498 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB48A 498 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
409 1365 682 2Y20= 2x1 3Y25= 3x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB48 0.00 0.52 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.13

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB49.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB49A 1.16 1.00 0.50 0.58 1R10-225 1R10-300 1R10-300 2.14

Type in the Job Description yourself

ALONG GRID : 15;/G-B; FILE NAME : 1FB49; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB49 1.73 225 600 225 0


1FB49A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 22.85 6.74 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 3.23 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 98.2 47.1
B 50.6 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB49 0.0 -45.7 -94.2 0.0 66.1


1FB49A -94.2 226.9 0.0 146.8 127.6

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB49 202 249 498 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB49A 498 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
409 1365 682 2Y20= 2x1 3Y25= 3x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB49 0.00 0.52 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.13

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB50.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB50A 1.36 1.21 0.50 0.58 1R10-125 1R10-125 1R10-125 1.93

Type in the Job Description yourself

ALONG GRID : 16;/G-B; FILE NAME : 1FB50; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB50 1.73 225 600 225 0


1FB50A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 22.85 6.74 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 8.22 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 116.9 47.1
B 69.3 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB50 0.0 -45.7 -94.2 0.0 66.1


1FB50A -94.2 276.0 0.0 173.0 153.8

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB50 202 249 498 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB50A 498 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
543 1812 906 2Y20= 2x1 4Y25= 3x2 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB50 0.00 0.52 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.13

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB51.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB51A 1.16 1.00 0.50 0.58 1R10-225 1R10-300 1R10-300 2.14

Type in the Job Description yourself

ALONG GRID : 17;/G-B; FILE NAME : 1FB51; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB51 1.73 225 600 225 0


1FB51A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 22.85 6.74 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 3.23 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 98.2 47.1
B 50.6 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB51 0.0 -45.7 -94.2 0.0 66.1


1FB51A -94.2 226.9 0.0 146.8 127.6

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB51 202 249 498 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB51A 498 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
409 1365 682 2Y20= 2x1 3Y25= 3x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB51 0.00 0.52 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.13

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB52.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB52A 1.16 1.00 0.50 0.58 1R10-225 1R10-300 1R10-300 2.14

Type in the Job Description yourself

ALONG GRID : 18;/G-B; FILE NAME : 1FB52; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB52 1.73 225 600 225 0


1FB52A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 22.85 6.74 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 3.23 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 98.2 47.1
B 50.6 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB52 0.0 -45.7 -94.2 0.0 66.1


1FB52A -94.2 226.9 0.0 146.8 127.6

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB52 202 249 498 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB52A 498 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
409 1365 682 2Y20= 2x1 3Y25= 3x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB52 0.00 0.52 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.13

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB53.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB53A 1.36 1.21 0.50 0.58 1R10-125 1R10-125 1R10-125 1.93

Type in the Job Description yourself

ALONG GRID : 19;/G-B; FILE NAME : 1FB53; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB53 1.73 225 600 225 0


1FB53A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 22.86 6.74 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 8.22 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 116.9 47.1
B 69.3 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB53 0.0 -45.7 -94.2 0.0 66.1


1FB53A -94.2 276.0 0.0 173.0 153.8

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB53 202 249 498 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB53A 498 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
543 1812 906 2Y20= 2x1 4Y25= 3x2 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB53 0.00 0.52 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.13

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB54.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB54A 1.16 1.00 0.50 0.58 1R10-225 1R10-300 1R10-300 2.14

Type in the Job Description yourself

ALONG GRID : 20;/G-B; FILE NAME : 1FB54; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB54 1.73 225 600 225 0


1FB54A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 22.85 6.74 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 3.23 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 98.2 47.1
B 50.6 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB54 0.0 -45.7 -94.2 0.0 66.1


1FB54A -94.2 226.9 0.0 146.8 127.6

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB54 202 249 498 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB54A 498 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
409 1365 682 2Y20= 2x1 3Y25= 3x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB54 0.00 0.52 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.13

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB55.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB55A 1.16 1.00 0.50 0.58 1R10-225 1R10-300 1R10-300 2.14

Type in the Job Description yourself

ALONG GRID : 21;/G-B; FILE NAME : 1FB55; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB55 1.73 225 600 225 0


1FB55A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 22.87 6.74 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 3.23 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 98.3 47.1
B 50.6 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB55 0.0 -45.7 -94.3 0.0 66.1


1FB55A -94.3 226.8 0.0 146.8 127.6

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB55 202 249 498 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB55A 498 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
409 1365 682 2Y20= 2x1 3Y25= 3x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB55 0.00 0.52 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.13

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB56.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB56A 1.36 1.21 0.50 0.58 1R10-125 1R10-125 1R10-125 1.93

Type in the Job Description yourself

ALONG GRID : 22;/G-B; FILE NAME : 1FB56; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB56 1.73 225 600 225 0


1FB56A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 22.79 6.73 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 8.22 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 116.9 47.1
B 69.4 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB56 0.0 -45.6 -94.1 0.0 66.0


1FB56A -94.1 276.0 0.0 173.0 153.8

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB56 202 248 497 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB56A 497 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
543 1812 906 2Y20= 2x1 4Y25= 3x2 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB56 0.00 0.52 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.14

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB57.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB57A 1.16 1.00 0.50 0.58 1R10-225 1R10-300 1R10-300 2.14

Type in the Job Description yourself

ALONG GRID : 23;/G-B; FILE NAME : 1FB57; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB57 1.73 225 600 225 0


1FB57A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 23.09 6.77 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 3.23 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 98.5 47.2
B 50.6 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB57 0.0 -46.1 -94.9 0.0 66.5


1FB57A -94.9 226.7 0.0 146.9 127.6

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB57 202 251 502 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB57A 502 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
409 1363 681 2Y20= 2x1 3Y25= 3x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB57 0.00 0.53 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.10

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB58.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB58A 1.16 1.00 0.50 0.58 1R10-225 1R10-300 1R10-300 2.14

Type in the Job Description yourself

ALONG GRID : 24;/G-B; FILE NAME : 1FB58; Code : BS8110:1985

D.L. L.L. fcu fy fyv cover span cantilever


1.40 1.60 25 410 250 25 2 Left

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB58 1.73 225 600 225 0


1FB58A 7.50 225 600 225 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 3.23 0.00


1 point load 21.98 6.60 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 3.23 0.00


2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50
2 partial udl 6.01 4.51 0.00 6.01 4.51 7.50

Support Support Reaction-kN


No D.L. L.L.

F 97.2 46.9
B 50.8 33.9

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB58 0.0 -44.3 -91.8 0.0 64.6


1FB58A -91.8 227.6 0.0 146.5 127.8

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB58 202 242 484 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
175 202 175 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Bot

1FB58A 484 202 202 2Y20= 2x1 2Y12= 2x1 2Y12= 2x1 Top
411 1370 685 2Y20= 2x1 3Y25= 3x1 2Y25= 2x1 Bot

Span Stress-N/mm2 Vc-N/mm2 Link Defl'n


No L R L R L S R ratio

1FB58 0.00 0.51 0.50 0.50 1R 6-125 1R 6-125 1R 6-125 4.23

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB59.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56 1FB59B 247 135 135 2Y16= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 320 160 2Y12= 2x1 2Y16= 2x1 2Y16= 2x1 Bot
Type in the Job Description yourself

ALONG GRID : 25;/G-B; FILE NAME : 1FB59; Code : BS8110:1985 Span Stress-N/mm2 Vc-N/mm2 Link Defl'n
No L R L R L S R ratio
D.L. L.L. fcu fy fyv cover span cantilever
1FB59 0.00 0.81 0.58 0.58 1R 6-200 1R 6-200 1R 6-200 3.08
1.40 1.60 25 410 250 25 3 Left 1FB59A 0.91 0.63 0.58 0.50 1R 6-200 1R 6-200 1R 6-200 8.97
1FB59B 1.00 0.77 0.50 0.50 1R 6-150 1R 6-200 1R 6-200 6.81
Span No Span-m Width-mm Depth-mm F-width F-depth

1FB59 1.73 150 600 150 0


1FB59A 3.75 150 600 150 0
1FB59B 3.75 150 600 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 2.15 0.00


1 point load 26.12 6.98 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 9.55 0.00

3 udl 9.55 0.00


3 partial udl 6.01 4.51 -3.75 6.01 4.51 3.75
3 trapeziodal 6.01 4.51 X1 = 0.00 X2 = 3.75 X = 1.50

Support Support Reaction-kN


No D.L. L.L.

F 74.5 24.2
D 60.4 27.8
B 31.2 12.8

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB59 0.0 -49.7 -100.5 0.0 68.4


1FB59A -100.5 10.1 -47.8 76.4 52.9
1FB59B -47.8 60.9 0.0 84.8 65.5

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB59 135 278 557 2Y20= 2x1 2Y20= 2x1 2Y20= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB59A 557 320 247 2Y20= 2x1 2Y16= 2x1 2Y16= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

Page 1 of 2 Page 2 of 2
BEAM OUTPUT : f:\esteemwin\prk\sktamil\tamil\1fb\1FB60.oo1

Type in the Company Name yourself; 7-4-2016, Thursday, 0:54:56

Type in the Job Description yourself


Span Stress-N/mm2 Vc-N/mm2 Link Defl'n
No L R L R L S R ratio
ALONG GRID : 26;/G-B; FILE NAME : 1FB60; Code : BS8110:1985
1FB60 0.00 0.56 0.50 0.50 1R 6-200 1R 6-200 1R 6-200 4.36
D.L. L.L. fcu fy fyv cover span cantilever 1FB60A 0.44 0.28 0.50 0.41 1R 6-200 1R 6-200 1R 6-200 8.54
1.40 1.60 25 410 250 25 3 Left 1FB60B 0.58 0.45 0.41 0.41 1R 6-200 1R 6-200 1R 6-200 7.95

Span No Span-m Width-mm Depth-mm F-width F-depth

1FB60 1.73 150 600 150 0


1FB60A 3.75 150 600 150 0
1FB60B 3.75 150 600 150 0

Span Load Type D.L. L.L. X1 D.L. L.L. X2


No kN;kN/m m kN;kN/m m

1 udl 9.55 0.00


1 point load 8.85 2.41 0.00
1 isos. tri-lar 3.46 2.58 X1 = 0.00 X2 = 1.72

2 udl 9.55 0.00

3 udl 9.55 0.00


3 trapeziodal 6.01 4.51 X1 = 0.00 X2 = 3.75 X = 1.50

Support Support Reaction-kN


No D.L. L.L.

F 51.5 6.7
D 40.8 6.7
B 21.3 4.7

FACTORED MOMENT-kNm FACTORED SHEAR-kN


Span No Left Span Right Left Right

1FB60 0.0 -23.0 -54.9 0.0 47.1


1FB60A -54.9 0.1 -25.7 37.0 23.4
1FB60B -25.7 37.2 0.0 49.5 38.3

Span AREA OF REBAR-mm2 REBAR ARRANGEMENT -Top/Bottom Side


No. Left Span Right Left Span Right Bar

1FB60 135 143 286 2Y16= 2x1 2Y16= 2x1 2Y16= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB60A 286 166 135 2Y16= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 135 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot

1FB60B 135 135 135 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Top
116 189 116 2Y12= 2x1 2Y12= 2x1 2Y12= 2x1 Bot