The document appears to be a progress report showing 21 items of work, their quantities, unit prices, total costs, progress to date, and payment status. It provides details on the volume of work completed for each item, the total costs to date, and the percentage completion across all items which is reported as 97.54%. The progress update indicates that some items are over budget while others have lower completion than planned.
The document appears to be a progress report showing 21 items of work, their quantities, unit prices, total costs, progress to date, and payment status. It provides details on the volume of work completed for each item, the total costs to date, and the percentage completion across all items which is reported as 97.54%. The progress update indicates that some items are over budget while others have lower completion than planned.
The document appears to be a progress report showing 21 items of work, their quantities, unit prices, total costs, progress to date, and payment status. It provides details on the volume of work completed for each item, the total costs to date, and the percentage completion across all items which is reported as 97.54%. The progress update indicates that some items are over budget while others have lower completion than planned.
No Item Pekerjaan Sat. Volume Harga Satuan Harga Total Bobot Input Data Progress saat ini ini saat ini 1 Striping m3 12,26 Rp 22.700 Rp 278.302 0,05% 12,26 0,05% 0,05% Rp 278.302 100,00% 2 Galian Diatas Air tipe - A m3 393,37 Rp 18.200 Rp 7.159.334 1,31% 508,90 1,70% 1,70% Rp 9.261.980 129,37% 3 Galian Sedimen Tipe - B m3 553,19 Rp 26.200 Rp 14.493.578 2,66% 786,10 3,78% 3,78% Rp 20.595.820 142,10% 4 Galian Struktur tipe - C m3 560,71 Rp 18.200 Rp 10.204.922 1,87% 791,00 2,64% 2,64% Rp 14.396.200 141,07% 5 Buangan Tanah m3 1.519,71 Rp 34.000 Rp 51.670.140 9,47% 2.086,00 13,00% 13,00% Rp 70.924.000 137,26% 6 Tanah Merah Type - B m3 361,54 Rp 135.300 Rp 48.916.362 8,97% 361,54 8,97% 8,97% Rp 48.916.362 100,00% 7 Concrete type - B1 m3 444,47 Rp 102.800 Rp 45.691.516 8,38% 192,60 3,63% 3,63% Rp 19.799.280 43,33% 8 Concrete type - D1 m3 19,31 Rp 102.800 Rp 1.985.068 0,36% 15,33 0,29% 0,29% Rp 1.575.924 79,39% 9 Concrete type - D2 m3 8,45 Rp 896.600 Rp 7.576.270 1,39% 8,57 1,41% 1,41% Rp 7.683.862 101,42% 10 Bagcasting m2 1.395,29 Rp 79.150 Rp 110.437.204 20,25% 1.147,28 16,65% 16,65% Rp 90.807.212 82,23% 11 Pembesian ton 31,19 Rp 1.250.000 Rp 38.987.500 7,15% 25,77 5,91% 5,91% Rp 32.212.500 82,62% 12 Pemasangan Panel Preecast m2 1.687,00 Rp 87.500 Rp 147.612.500 27,07% 1.776,00 28,49% 28,49% Rp 155.400.000 105,28% 13 Split untuk PVC m3 3,58 Rp 290.700 Rp 1.040.706 0,19% 1,36 0,07% 0,07% Rp 395.352 37,99% 14 Pemadatan Sirtu m3 197,71 Rp 270.650 Rp 53.510.212 9,81% 198,61 9,86% 9,86% Rp 53.753.797 100,46% 15 Pemasangan pipa PVC m 40,00 Rp 1.768 Rp 70.720 0,01% 30,00 0,01% 0,01% Rp 53.040 75,00% 16 Pemasangan Filter m2 4,29 Rp 9.500 Rp 40.755 0,01% 4,92 0,01% 0,01% Rp 46.740 114,69% 17 Pengecatan nat Preecast m2 12,25 Rp 20.094 Rp 246.152 0,05% 9,65 0,04% 0,04% Rp 193.907 78,78% 18 Installation of flap valve, 50 mm nos 240,00 Rp 7.800 Rp 1.872.000 0,34% 238,00 0,34% 0,34% Rp 1.856.400 99,17% 19 Installation of flap valve, 100 mm nos 1 Rp 15.800 Rp 15.800 0,00% 0,00% 0,00% Rp - 0,00% 20 Intallation of geotextile type -1 m2 1.033,19 Rp 3.000 Rp 3.099.570 0,57% 1074,77 0,59% 0,59% Rp 3.224.310 104,02% 21 Fabrikasi + install plastic cor (bhn + upah) m2 130,36 Rp 3.500 Rp 456.260 0,08% 157,48 0,10% 0,10% Rp 551.180 120,80% Jumlah Rp 545.364.870 100,00% 9426,14 97,54% 97,54% Rp 531.926.168 97,54%