Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B

Enriczar T. Tia
Assistant Vice President Engineering
C C

Substation and Electrical Equipment

D D

Arnel D. Bersabe
Department Manager

Power System Design


E

CONSTRUCTION OF SITE DEVELOPMENT Eric T. Camerino


E

@ BINUGAO SUB-STATION
Department Manager

F Power System Design F

B I N U G A O , T O R I L D I S T R I C T ,
Jesse Talavera
DAVAO CITY Supervisor- Civil Works

G G

Allan Christian Calag


Supervisor- PSDD

H H

David Jayson Oquendo


Project Engineer - PSDD

I I

Planning and Design

J Jeffrey O. Lampara J
Project Inspector-MES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B

A B

Enriczar T. Tia
Assistant Vice President Engineering

C C

Substation and Electrical Equipment

Arnel D. Bersabe
D Department Manager D

Power System Design

Eric T. Camerino
E Department Manager
E

Power System Design

F E
F Jesse Talavera F
Supervisor- Civil Works

D C
Allan Christian Calag
Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
SCALE 1 Project Inspector-MES

LOT PLAN 1 : 250 A-01 A-02


CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION SHEET NO.
LOT PLAN
REG NO: 0143073 RODGER S. VELASCO 01/43 A-01
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
B B

Enriczar T. Tia
A Assistant Vice President Engineering

C B C

Substation and Electrical Equipment


C

Arnel D. Bersabe
D D Department Manager D

Power System Design


E

F Eric T. Camerino
E Department Manager
E

G
Power System Design

H Jesse Talavera
F F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
SCALE 1 Project Inspector-MES

SITE DEVELOPMENT PLAN 1 : 250 A-02 A-02


CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION SHEET NO.
SITE DEVELOPMENT PLAN
REG NO: 0143073 RODGER S. VELASCO 02/43 A-02
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Enriczar T. Tia
Assistant Vice President Engineering

C C

A
Substation and Electrical Equipment
B

Arnel D. Bersabe
D C Department Manager D

Power System Design


D

Eric T. Camerino
E E Department Manager
E

Power System Design


F

F G Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
SCALE 1 Project Inspector-MES

FACADE WALL, MAIN ENTRANCE AND ALTERNATE EXIT GATE LAYOUT PLAN 1 : 250 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION FACADE WALL, MAIN ENTRANCE AND SHEET NO.
REG NO: 0143073 RODGER S. VELASCO ALTERNATE EXIT GATE LAYOUT PLAN 03/43 A-03
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

A F H Mark A. Valencia
Vice President Engineering

B B

TOP OF PERIMETER FENCE


Enriczar T. Tia
Assistant Vice President Engineering

TOP OF CHB FENCE

C C

TOP OF CRUSHED GRAVEL


BRGY. ROAD ELEVATION Substation and Electrical Equipment

Arnel D. Bersabe
D Department Manager D

Power System Design

SCALE 1
E FACADE WALL AND MAIN ENTRANCE GATE FRONT ELEVATION 1 : 100 A-02 A-02
Eric T. Camerino
Department Manager
E

Power System Design

F
1 17 Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G TOP OF PERIMETER FENCE G

TOP OF CHB FENCE

David Jayson Oquendo


SLIDING GATE SWING GATE Project Engineer - PSDD
TOP OF CRUSHED GRAVEL
BRGY. ROAD ELEVATION

H H

Planning and Design

I I
Jeffrey O. Lampara
SCALE 1 Project Inspector-MES

ALTERNATE EXIT GATE FACADE FRONT ELEVATION 1 : 100 A-02 A-02


CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION ALTERNATE EXIT GATE FACADE FRONT ELEVATION SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 04/43 A-04
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

2" X 3" X 1.5mm THK.


TUBULAR STEEL SUPPORT 2"x 3mm THK FLAT BAR SUPPORT 20mmØ FABRICATED HEAVY DUTY BARREL BOLT
PAINT FINISHED PLATE (FULL WELD) WITH 2"x3mm THK FLAT BAR SUPPORT PLATE

B PERFORATED METAL SHEET


B
HEAVY DUTY FABRICATED
HINGES (8 SETS)

0.80mm G.I. PLAIN SHEET


PAINT FINISHED
SAMPLE PICTURE (UPPER GUIDE BRACKET)
2" X 6" X 1.5mm THK.
TUBULAR STEEL MAIN
GATE FRAME
Enriczar T. Tia
PAINT FINISHED
SECTION PLAN Assistant Vice President Engineering

C C

BARREL BOLT SPOT DETAIL


16mmØ PLAIN BAR
Substation and Electrical Equipment
MAIN GATE DETAIL
FOOT LOCK

SCALE 1:50 MTS

Arnel D. Bersabe
D Department Manager D

SLIDING GATE SAMPLE PICTURE


(BOTTOM ROLLING SLIDING GEAR)
Power System Design

ISOMETRIC UPPER & LOWER


GUIDE BRACKET SLIDING GATE Eric T. Camerino
E NOT ON SCALE Department Manager E
PLAN
2" X 3" X 1.5mm THK.
TUBULAR STEEL SUPPORT
PAINT FINISHED 2" X 6" X 1.5mm THK.
TUBULAR STEEL MAIN
GATE FRAME
0.80mm G.I. PLAIN SHEET PAINT FINISHED
Power System Design
PAINT FINISHED
2" X 6" X 1.5mm THK.
HEAVY DUTY FABRICATED
TUBULAR STEEL MAIN
HINGES (5 SETS)
GATE FRAME
PAINT FINISHED

F Jesse Talavera F
HEAVY DUTY FABRICATED Supervisor- Civil Works
HINGES (5 SETS)

PERFORATED METAL SHEET

2" X 3" X 1.5mm THK.


TUBULAR STEEL SUPPORT
PAINT FINISHED

20mmØ FABRICATED HEAVY DUTY BARREL BOLT


Allan Christian Calag
SLIDING GATE SWING GATE WITH 2"x3mm THK FLAT BAR SUPPORT PLATE Supervisor- PSDD

G G
0.80mm G.I. PLAIN SHEET
PAINT FINISHED

16mmØ PLAIN BAR PERFORATED METAL SHEET

SECTION FOOT LOCK

David Jayson Oquendo

ALTERNATE EXIT GATE DETAIL MAN ENTRANCE DOOR DETAIL Project Engineer - PSDD

SCALE 1:30 MTS


SCALE 1:60 MTS
H H

Planning and Design

I I

Jeffrey O. Lampara
SCALE 1 Project Inspector-MES

ALTERNATE EXIT GATE FACADE FRONT ELEVATION 1 : 100 A-02 A-02


CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT ALTERNATE EXIT GATE DETAIL J
@ BINUGAO SUB - STATION MAIN ENTRANCE DOOR DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO MAIN GATE DETAIL 05/43 A-05
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: ISOMETRIC UPPER & LOWER GUIDE BRACKET SLIDING GATE
EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

INDEX Mark A. Valencia


Vice President Engineering

1 1 DLPC LOGO
B B
2 2 CHB WALL PAINT FINISHED

3 20mm GROOVE
3 2
4 DECORATIVE STONE
Enriczar T. Tia
Assistant Vice President Engineering

TOP OF PERIMETER FENCE


C C

TOP OF CHB FENCE Substation and Electrical Equipment

4
Arnel D. Bersabe
D Department Manager D
TOP OF CRUSHED GRAVEL
BRGY. ROAD ELEVATION

FACADE FLOOR PLAN FACADE ELEVATION


Power System Design

SCALE 1:60 MTS


SCALE 1:60 MTS

Eric T. Camerino
E Department Manager
E

Power System Design

F Jesse Talavera F
Supervisor- Civil Works

TOP OF PERIMETER FENCE

TOP OF CHB FENCE Allan Christian Calag


Supervisor- PSDD

G G

SLIDING GATE SWING GATE

TOP OF CRUSHED GRAVEL David Jayson Oquendo


Project Engineer - PSDD
BRGY. ROAD ELEVATION

H
ALTERNATE EXIT GATE FACADE ELEVATION H

SCALE 1:60 MTS

ALTERNATE EXIT GATE FLOOR PLAN


Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT ALTERNATE EXIT GATE FACADE ELEVATION J
@ BINUGAO SUB - STATION FACADE ELEVATION SHEET NO.
REG NO: 0143073 RODGER S. VELASCO ALTERNATE GATE FLOOR PLAN 06/43 A-06
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: FACADE FLOOR PLAN
EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B

Enriczar T. Tia
Assistant Vice President Engineering

C C

Substation and Electrical Equipment

Arnel D. Bersabe
D LANDSCAPE Department Manager D

Power System Design

FACADE PERSPECTIVE ALONG MAIN ENTRANCE


Eric T. Camerino
E Department Manager
E

Power System Design

F Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G LANDSCAPE G

David Jayson Oquendo


Project Engineer - PSDD

H H
FACADE PERSPECTIVE
LANDSCAPE LAYOUT PLAN
SCALE 1:60 MTS

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT FACADE PERSPECTIVE J
@ BINUGAO SUB - STATION FACADE PERSPECTIVE ALONG MAIN ENTRANCE SHEET NO.
REG NO: 0143073 RODGER S. VELASCO LANDSCAPE LAYOUT PLAN 07/43 A-07
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation
7 6 1 5 8 3 2 1 3 2 6 2 1 4 3

TOP PARAPET WALL (CLADDING) TOP PARAPET WALL (CLADDING) TOP PARAPET WALL (CLADDING)
DLPC LOGO
Mark A. Valencia
Vice President Engineering
TOP ROOF BEAM TOP ROOF BEAM TOP ROOF BEAM

HARD HAT RACKS


GUARDS AREA

COMMON
B B
TOILET

FIN.FLR.LINE FIN.FLR.LINE FIN.FLR.LINE


Enriczar T. Tia
N.G.L N.G.L N.G.L Assistant Vice President Engineering

C
GUARD HOUSE FLOOR PLAN FRONT ELEVATION LEFT SIDE ELEVATION RIGHT SIDE ELEVATION C
SCALE 1:60 MTS SCALE 1:60 MTS SCALE 1:60 MTS SCALE 1:60 MTS

Substation and Electrical Equipment


INDEX
TOP PARAPET WALL (CLADDING) TOP PARAPET WALL (CLADDING) 1 100mm THK. CHB WALL
PAINT FINISHED
Arnel D. Bersabe
DLPC LOGO SEE TRUSS DETAIL 2 75mm THK. CONCRETE
D TOP ROOF BEAM TOP ROOF BEAM SEE TRUSS DETAIL Department Manager D
LEDGE W/ 10mm DRB
F1C1 F1C1 3 4mm THK. ACP
100mmTHK 9 1
CONCRETE SLAB (ALUMINUM CLADDING
(ON FILL)
PANEL) ALOCOBEST
GUARDS AREA Power System Design
4 600mm X 600mm
WF AWNING WINDOW W/
F1C1 F1C1 F1C1
6mm THK.ANNEALED
10
FIN.FLR.LINE FIN.FLR.LINE GLASS, ALUMINUM
TOILET
FRAME W/ COMP. Eric T. Camerino
E N.G.L N.G.L ACCESSORIES E
Department Manager
WF WF
5 1200mm X 1200mm
SLIDING WINDOW W/
6mm THK.ANNEALED
FOUNDATION PLAN GLASS, ALUMINUM
FRAME W/ COMP. Power System Design
SCALE 1:60 MTS ACCESSORIES

6 20mm GROOVE
TOP ROOF BEAM
SECTION "A" SECTION "B"
SCALE 1:60 MTS
F
SCALE 1:60 MTS 7 MAN GATE Jesse Talavera F
4-12mmØ VERTICAL BARS WITH Supervisor- Civil Works
12mmØ VERT. BARS SPACE AT 600mm &
10mmØ TIES SPACE AT 2-50mm,
12mmØ HOR BARS SPACE AT EVERY 3RD
8 600mm X 2100mm
7-100mm REST @ 200mm 0.C B.W PVC DOOR W/ COMP.
LAYER,
12mmØ BEDBARS ACCESSORIES
SPACE AS SHOWN
9 300mm X 300mm
GLAZED WALL TILE
3-12mmØ CONT. BARS WITH 10mmØ
TIES SPACE AT 200mm Allan Christian Calag
10 300mm X 300mm Supervisor- PSDD
GLAZED FLOOR TILE
G G

PLAN
FIN.FLR.LINE WALL FOOTING DETAIL
SCALE 1:40 MTS
NAT.GRD. LINE
12mmØ BEDBARS
SPACE AS SHOWN David Jayson Oquendo
Project Engineer - PSDD

SECTION

H F1C1 DETAIL H
SCALE 1:40 MTS

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT GUARD HOUSE FLOOR PLAN J
@ BINUGAO SUB - STATION SECTION A & B DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO WALL FOOTING DETAIL 08/43 A-08
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: F1C1 DETAIL
EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B
0.6mm THK. RIBTYPE CORBEL (SEE DET) CORBEL (SEE DET)
ROOF AND BENDED
ACC.

2-12mmØ TOP
SLOPE
10mmØ SAGROD Enriczar T. Tia
Assistant Vice President Engineering
2"x3"x1.8mm THK TUBULAR
USE 10mmØ STIRRUPS SPACE AT

RB

RB
PURLINS SPACE AS SHOWN
2-50mm, 2-100mm, REST AT
C 0.6mm THK PRE-PAINTED 200mm C
G.I GUTTER.

T-1
T-1

T-1
RB RB DLPC LOGO
DS Substation and Electrical Equipment
2-12mmØ BOTTOM
CORBEL (SEE DET) Sa

Arnel D. Bersabe
D RB DETAIL Department Manager D

ROOF FRAMING PLAN SCALE 1:5 MTS


C.O Sa
SCALE 1:30 MTS Power System Design

PB1
ELECTRICAL LIGHTING &
2"x2"x 3/16" THK
ANGLE BAR WITH STIFFENER POWER LAYOUT PLAN Eric T. Camerino
E SCALE 1:30 MTS E
(CENTER) Department Manager

AND EXPANSION BOLT


10mmØ SAGROD
2"x3"x1.8mm THK TUBULAR
TOP CHORD 0.60mm THK. RIBTYPE Power System Design
ROOF AND BENDED

EXPANSION BOLT
ACC.
LEGEND
F 2"x3"x1.8mm THK TUBULAR Jesse Talavera F
PURLINS SPACE AS SHOWN Supervisor- Civil Works
2"x2" ANGLE BAR CLEATS

CORBEL DETAIL
= 9 WATTS LED BULB (PHILIPS
BRAND)

SCALE 1:3 MTS Allan Christian Calag


RB RB CORBEL (SEE DET)
CORBEL (SEE DET) Supervisor- PSDD

G
2"x3"x1.8mm THK TUBULAR
BOTTOM CHORD
0.05mm THK
PRE-PAINTED G.I GUTTER. Sa = SINGLE SWITCH
G

250mm x 25mm FASCIA BOARD

David Jayson Oquendo


Project Engineer - PSDD

H T-1 DETAIL H

SCALE 1:20 MTS

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT ROOF FRAMING PLAN J
@ BINUGAO SUB - STATION RB DETAIL, CORBEL DETAIL, SHEET NO.
REG NO: 0143073 RODGER S. VELASCO T-1 DETAIL 09/43 A-09
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: ELECTRICAL LIGHTING AND POWER LAYOUT PLAN
EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
B B

A MP

B MP Enriczar T. Tia
Assistant Vice President Engineering
FIRE EXTINGUISHER SHED
C
C C

D Substation and Electrical Equipment

E
Arnel D. Bersabe
D Department Manager D
F

G FIRE EXTINGUISHER SHED


Power System Design
MP
H

MP
E
FIRE EXTINGUISHER SHED AND Eric T. Camerino
E
Department Manager

MARSHALING PANEL LOCATION PLAN


SCALE 1:300 MTS
Power System Design

CORR G.I SHEET .5mm THK

F Jesse Talavera F
Supervisor- Civil Works

2" Ø G.I PIPE SHED 40 (ROOF FRAME,


G.I POST)
Allan Christian Calag
Supervisor- PSDD

G 50 lbs type ABC, FIRE ESTINGUISHER G

4" THK CONCRETE FLOORING WITH David Jayson Oquendo


FIRE EXTINGUISHER SHED DETAIL 10mmØ R.C BARS SPACE 400mm O.C Project Engineer - PSDD

NOT TO SCALE BOTHWAYS

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT FIRE EXTINGUISHER SHED AND MARSHALING PANEL J
@ BINUGAO SUB - STATION LOCATION PLAN SHEET NO.
REG NO: 0143073 RODGER S. VELASCO FIRE EXTINGUISHER SHED DETAIL 10/43 A-10
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
B B

A b SL SL
Enriczar T. Tia
SL MP b SL MP SL b
a SL b Assistant Vice President Engineering
a WELDING b b WELDING
FL FL OUTLET
OUTLET C6
B C7
C PB1 C
PB1

Substation and Electrical Equipment


C C3
PB1
a
SL
SL
Arnel D. Bersabe
a
D D Department Manager D

FL
c

C2 Power System Design


E C1 a PB1
SL
PB1
Sa
C.O
Eric T. Camerino
S abc
Saab
S

E E
Sa

Department Manager

F
SL a

C9 C4 C5 Power System Design


G PB1 PB1 PB1
WELDING
C8
OUTLET FL FL b SL PB1
b SL b SL b SL b SL
MP a a
F H Jesse Talavera F
Supervisor- Civil Works

MP
WELDING
OUTLET

C5
PB1
LEGEND: a SL SL a



Allan Christian Calag
Supervisor- PSDD

G – G


David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES
SCALE 1
ELECTRICAL LIGHTING & POWER LAYOUT PLAN 1 : 200 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT ELECTRICAL LIGHTING AND POWER LAYOUT PLAN J
@ BINUGAO SUB - STATION SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 11/43 E-1
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B

5
5 5 Enriczar T. Tia
Assistant Vice President Engineering
5 6 5 6 5 6

3 4 3 4 3 4

4
C C
1 2 1 2 1 2

1 1
3 2 3 2 2
3 3 3 3
5
CP-1 CP-2 CP-3
5
6
Substation and Electrical Equipment
5 6 5 5 6 5 5
6

CP-2 CP-4 CP-6

3 3 3
3 2 3 2 2
3
1 1
Arnel D. Bersabe
2 1 2 1 2 1
4
D 4 3 4 3 4 3
Department Manager D
6 5 6 5 6 5

5
5 6 5 5 6

Power System Design


5 6 5 6 5 6

3 4 3 4 3 4

1 2 1 2 1 2

1 1 1
3 2 3
3
2 3
3
2
3
Eric T. Camerino
E Department Manager
E
CP-7 CP-8
5 6

Power System Design

F Jesse Talavera F
Supervisor- Civil Works

LEGEND:
Allan Christian Calag

G
C.P. Supervisor- PSDD

END BELL pcs


David Jayson Oquendo
Project Engineer - PSDD
COUPLER PIPE pcs

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES
SCALE 1
ELECTRICAL CIRCUIT LAYOUT PLAN 1 : 200 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT ELECTRICAL CONDUIT CIRCUIT LAYOUT PLAN J
@ BINUGAO SUB - STATION SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 12/43 E-2
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B
MARSHALLING PANEL

Enriczar T. Tia
Assistant Vice President Engineering

C C

Substation and Electrical Equipment

CONCRETE PEDESTAL
(SEE DETAIL) Arnel D. Bersabe
D Department Manager D

Power System Design

Eric T. Camerino
E Department Manager
E

Power System Design

F Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I

Jeffrey O. Lampara
Project Inspector-MES
SCALE 1
MARSHALLING PANEL PERSPECTIVE MARSHALLING PANEL FRONT ELEVATION 1 : 04 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT MARSHALING PANEL PERSPECTIVE J
@ BINUGAO SUB - STATION MARSHALING PANEL FRONT ELEVATION SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 13/43 E-3
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation
12mmØ Hilti Chemical 12mmØ Hilti Chemical
Anchor Bolt w/ HIT-HY 200 Anchor Bolt w/ HIT-HY 200
adhesive chemical anchor adhesive chemical anchor
714.29 471.43 842.86 1114.29 714.29
Mark A. Valencia
Vice President Engineering

B HILTI HILTI HILTI HILTI HILTI


B

2 @ 50mm rest @ 100mm o.c.


with10mmØ stirrups spaced
4-12mmØ vertical bars

4-12mmØ vertical bars


with10mmØ stirrups spaced
2 @ 50mm rest @ 100mm o.c.

Enriczar T. Tia
Assistant Vice President Engineering

C C

Substation and Electrical Equipment

SECTION (VIEW 1) SECTION (VIEW 2) Arnel D. Bersabe


D Department Manager D

9 -12MMØ BED BARS


SPACE AS SHOWN Power System Design

Eric T. Camerino
E Department Manager
E

Power System Design

F TOP VIEW Jesse Talavera


Supervisor- Civil Works
F

PLAN Allan Christian Calag


Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I

Jeffrey O. Lampara
Project Inspector-MES
SCALE 1 SCALE 1
TOP VIEW 1 : 07 A-02 A-02
CONCRETE PEDESTAL DETAIL 1 : 07 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT TOP VIEW J
@ BINUGAO SUB - STATION CONCRETE PEDESTAL DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 14/43 E-4
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B

Enriczar T. Tia
Assistant Vice President Engineering

C C

Substation and Electrical Equipment

D A Arnel D. Bersabe

Power System Design


Department Manager D

Eric T. Camerino
E Department Manager
E

Power System Design

F Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES
SCALE 1 SCALE 1
PANEL FABRICATION LEGEND 1 : 07 A-02 A-02
FABRICATION DRAWING (PANEL COVER) 1 : 07 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT PANEL FABRICATION LEGEND J
@ BINUGAO SUB - STATION FABRICATION DRAWING (PANEL COVER) SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 15/43 E-5
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B

Enriczar T. Tia
Assistant Vice President Engineering

C C

Substation and Electrical Equipment

SECTION (VIEW 1) Arnel D. Bersabe


D Department Manager D

E
B Power System Design

Eric T. Camerino
Department Manager
E

Power System Design

F Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G G

SECTION (VIEW 2) David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES
SCALE 1 SCALE 1
SECTION DETAIL (MARSHALLING PANEL) 1 : 03 A-02 A-02
PANEL COVER DETAIL 1 : 03 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT SECTION DETAIL J
@ BINUGAO SUB - STATION PANEL COVER DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 16/43 E-6
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B

Enriczar T. Tia
Assistant Vice President Engineering

C C

Substation and Electrical Equipment

Arnel D. Bersabe
D Department Manager D
30mmØ hole
Power System Design

E
D Eric T. Camerino
Department Manager E

Power System Design

F C G E
F Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES
SCALE 1
FABRICATION DRAWING (PANEL) 1 : 03 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT FABRICATION DRAWING (PANEL) J
@ BINUGAO SUB - STATION SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 17/43 E-7
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Mark A. Valencia
Vice President Engineering

B B
A

C Enriczar T. Tia
Assistant Vice President Engineering

D
C C

E
Substation and Electrical Equipment

Arnel D. Bersabe
G
D Department Manager D

H
Power System Design

GROUNDING LAYOUT PLAN


SCALE 1:300 MTS

Eric T. Camerino
E Department Manager
E

Power System Design

F LEGEND DETAILS OF GROUND WIRE CONNECTION Jesse Talavera F


Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G G

10 ft Copper Grounding Rod

4/0 Bare Copper Conductor


David Jayson Oquendo
4/0 Insulated Copper Conductor Project Engineer - PSDD

H H

Planning and Design

I I

Jeffrey O. Lampara
Project Inspector-MES
SCALE 1
GROUNDING LAY-OUT PLAN 1 : 03 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT FABRICATION DRAWING (PANEL) J
@ BINUGAO SUB - STATION SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 18/43 E-8
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

DESCRIPTION Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

LEGEND:
Mark A. Valencia
12W LED PIN LIGHT Vice President Engineering

CONVENIENCE
B B
27W- STREET LIGHT
OUTLET

1 21 ''Ø G.I PIPE SCH.40 MP MARSHALING


STREET LIGHT SUPPORT
WELD TO THE VERTICAL SUPPORT PANEL
Enriczar T. Tia
2"Ø G.I PIPE SCH.40 VERTICAL
STREET LIGHT SUPPORT Assistant Vice President Engineering
( PROVIDED END CAP ) SL PERIMETER LIGHT
2"Ø G.I PIPE SCH.40 VERTICAL
C STREET LIGHT SUPPORT C
( PROVIDED END CAP ) PANEL BOARD
PB
Substation and Electrical Equipment

Arnel D. Bersabe
D Department Manager D

Power System Design

Eric T. Camerino
E Department Manager
E

Power System Design

4" CHB WALL

F Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G
ELEVATION G

SECTION David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I

Jeffrey O. Lampara
Project Inspector-MES
SCALE 1
TYPICAL DETAIL OF STREET LIGHT SUPPORT 1 : 30 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT TYPICAL DETAIL OF STREET LIGHT J
@ BINUGAO SUB - STATION ELEVATION / SECTION SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 19/43
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
B B

A Enriczar T. Tia
PERIMETER OPEN CANAL Assistant Vice President Engineering
CONNECT TO
EXISTING OPEN
B CANAL
MH1
C C

Substation and Electrical Equipment


C

Arnel D. Bersabe
D D Department Manager D

CONNECT TO
EXISTING OPEN
CANAL

PERIMETER OPEN CANAL


Power System Design
E
MH2 40 0
mm
WA RC
TA TER
NK LAV
CP
C.O

C.O
WC

FD

Eric T. Camerino
E 400mm RCCP 400mm RCCP 400mm RCCP Department Manager
E

F MH3 MH4 MH5 MH6 400


mm
RC
CP
400mm RCCP

Power System Design


G
MH7

PERIMETER OPEN CANAL


PERIMETER OPEN CANAL PERIMETER OPEN CANAL
MH8
F H Jesse Talavera F
Supervisor- Civil Works

PERIMETER OPEN CANAL

Allan Christian Calag


Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES
SCALE 1
PROVISION DRAINAGE LAYOUT PLAN 1 : 200 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT PROVISION DRAINAGE LAYOUT PLAN J
@ BINUGAO SUB - STATION SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 20/43 P-1
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

10mmØ R.C BARS SPACE 10mmØ HORR BARS SPACE


AS SHOWN 4" THK CHB ON CONC. AS SHOWN WITH 10mmØ
B PLASTERED FIN. REBARS SPACE @ 400mm B

CONCRETE MANHOLE
COVER
PLAN
Enriczar T. Tia
Assistant Vice President Engineering
10mmØ R.C BARS SPACE 10mmØ R.C BARS SPACE
AS SHOWN AS SHOWN

C C

LONGITUDINAL SECTION CROSS SECTION Substation and Electrical Equipment

OPEN CANAL DETAIL


SCALE 1:40 MTS

CONC. MANHOLE COVER DETAIL


SCALE 1:10 MTS
Arnel D. Bersabe
D Department Manager D

PLAN 300Ø - 400Ø RCCP

12mm SQUARE BAR Power System Design


SPACED @ 50mm O.C

SIDE VIEW Eric T. Camerino


E GRATINGS Department Manager
E

300Ø - 400Ø RCCP CONCRETE COLLAR

10mmØ VERT. & HOR. BARS


SPACED @ 400mm O.C
Power System Design

SIDE WALK
F FRONT VIEW
Jesse Talavera F
300Ø - 400Ø RCCP Supervisor- Civil Works

300Ø - 400Ø RCCP

Allan Christian Calag


Supervisor- PSDD

G ISOMETRIC (MANHOLE COVER) G


NOT TO SCALE
150mm THK CHB, (450 PSI)
PLASTERED INSIDE

10mmØ BED BARS David Jayson Oquendo


SPACED @ 400mm O.C
Project Engineer - PSDD

4" THK GRAVEL BASE


ISOMETRIC (CONCRETE COLLAR)
H
SECTION MANHOLE DETAIL
SCALE 1:10 MTS
NOT TO SCALE H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES
SCALE 1
MANHOLE DETAIL 1 : 10 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT MANHOLE DETAIL J
@ BINUGAO SUB - STATION ISOMETRIC (CONCRETE COLLAR) SHEET NO.
REG NO: 0143073 RODGER S. VELASCO CONCRETE MANHOLE COVER DETAIL 21/43 P-2
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: OPEN CANAL DETAIL
EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

TO EXISTING TO EXISTING
STREET CANAL STREET CANAL
C.O
B B

C.O C.O
Enriczar T. Tia
MH2 MH2 PLAN
Assistant Vice President Engineering

C C
WA WA
TA TER TA TER
NK NK
LA LA
V V
Substation and Electrical Equipment
C.O

WC WC

FD FD
8mmØ PULL BAR 12mmØ REBARS SP.@
C.O
150mm OC. BW.

Arnel D. Bersabe
D 12mmØ REBARS SP. @ 400mm Department Manager D
OC. BW. ON 100mm THK CHB
WALL

Power System Design

OUTLET

DIGESTIVE CHAMBER 12mmØ REBARS SP. @ 400mm


OC. BW. ON 100mm THK CHB
Eric T. Camerino
E E
GUARD HOUSE PLUMBING LAY-OUT PLAN GUARD HOUSE WATERLINE LAY-OUT PLAN WALL Department Manager

SCALE 1:60 MTS SCALE 1:60 MTS

LEACHING
CHAMBER Power System Design
5% SLUDGE PIT

F
SECTION 12mmØ REBARS SP. @ 400mm Jesse Talavera F
OC. BW. ON 100mm THK CHB Supervisor- Civil Works
WALL
SEPTIC TANK DETAIL
SCALE 1:20 MTS

Allan Christian Calag


Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES
SCALE 1
FABRICATION DRAWING (PANEL) 1 : 03 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT GUARD HOUSE PLUMBING LAYOUT PLAN J
@ BINUGAO SUB - STATION GUARD HOUSEWATER LINE LAYOUT PLAN SHEET NO.
REG NO: 0143073 RODGER S. VELASCO SEPTIC TANK DETAIL 22/43 P-3
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Mark A. Valencia
Vice President Engineering

B B
A

B
Enriczar T. Tia
Assistant Vice President Engineering

C
C C

Substation and Electrical Equipment


D

Arnel D. Bersabe
D
E Department Manager D

F
Power System Design

G Eric T. Camerino
E Department Manager E

H
Power System Design

F Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES
1
SITE DEVELOPMENT PLAN 1 : 200 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION SITE DEVELOPMENT PLAN SHEET NO.
REG NO: 0143073 RODGER S. VELASCO SECTION THRU "A" 23/43 S-01
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

DESIGN AND CONSTRUCTION NOTES (CIVIL AND ARCHITECTURAL)


GENERAL CONSTRUCTION: STRUCTURAL STEEL WORKS: Mark A. Valencia
Vice President Engineering
1. THESE CONSTRUCTION NOTES SHALL COMPLEMENT PLANS, DRAWINGS AND 4. THE CONTRACTOR SHALL REPORT TO THE ENGINEER ACTUAL UNUSUAL SOIL
CONDITIONS UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL IN 1. ALL STRUCTURAL STEEL WORKS SHALL BE DONE IN ACCORDANCE
SPECIFICATION THAT FORM PART OF THE CONTRACT. WHERE DETAILS OR
REQUIREMENTS ARE NOT COVERED BY PLANS AND SPECIFICATION, THESE WRITING BEFORE DEPOSITING CONCRETE. TABLE OF LAP SPLICE & ANCHORAGE LENGTH WITH THE 9TH EDITION OF THE MANUAL OF STEEL CONSTRUCTION.
CONSTRUCTION NOTES SHALL BE USED IN SO FAR AS THEY ARE APPLICABLE AMERICAN INSTITUTE OF STEEL CONSTRUCTION.
B 5. REMOVE ANY ARTIFICIAL OR DELETERIOUS MATERIALS DURING EXCAVATION AND B
TO SATISFY REQUIREMENTS OF CONSTRUCTION PRACTICE. BAR SIZES LAP SPLICE LENGTH (m) ANCHORAGE
REPLACE WITH COARSE -GRAINED FILLING. (mm) TYPE-A TYPE-B LENGTH (m) 2. ALL STRUCTURAL STEEL SHAPES, WIDE FLANGES, ANGLES, CHANNELS
2. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH OTHER ENGINEERING 6. BACKFILLING SHALL BE DONE IN LAYERS OF 200mm AND COMPACTED THOROUGHLY & PLATES SHALL CONFORM TO ASTM A36 FY=248MPA(36,000PSI) AND
DISCIPLINE DRAWINGS. Ø 1O 0.40 0.30 0.60
WITH APPROVED EQUIPMENT UNTIL DESIRED GRADE ELEVATION IS ATTAINED SHALL BE NOT HOT DIP GALVANIZED WITH MINIMUM COATING OF 3.4
Ø 12 0.45 0.35 0.60 MILS AFTER FABRICATION.
3. ALL DIMENSION ARE IN MILLIMETER (mm) UNLESS OTHERWISE NOTED IN THE
INTERPRETATION OF THE DRAWINGS , INDICATED DIMENSION SHALL GOVERN.
DISTANCES SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES,
CONCRETE WORKS: Ø 16 0.61 0.40 0.60 3. LIGHT GAGE STEEL MEMBERS SHALL DEVELOP A MINIMUM YIELD Enriczar T. Tia
STRENGTH OF FY=234MPA(34,000PSI). Assistant Vice President Engineering
1. ALL CONCRETE WORKS SHALL BE DONE IN ACCORDANCE WITH ACI-318-83 BUILDING Ø 20 0.76 0.58 0.60
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF ALL
CODE REQUIREMENTS FOR REINFORCED CONCRETE.
DIMENSIONS AND ACTUAL FIELD CONDITIONS. VERIFY DIMENSION ACCORDING Ø 25 1.10 0.90 0.68 4. STEEL PIPE SHALL CONFORM TO ASTM 501 OR A53 GRADE B AND SHALL
TO EQUIPMENT REQUIREMENT. 2. UNLESS OTHERWISE INDICATED IN PLANS OR NOTED IN THE SPECIFICATIONS, BE HOT DIP GALVANIZED WITH MINIMUM COATING OF 3.4MILS.
C C
CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS OF FC' = Ø 28 1.40 1.20 0.86
5. IN CASE OF QUESTION ARISING FROM INTERPRETATION OF/OR CONFLICT WITH 20.68 MPA (3000PSI).
OTHER DOCUMENTS, THE ATTENTION OF THE OWNER/ENGINEER SHALL BE 5. ALL WELDING WORKS SHALL CONFORM TO AWS STANDARD (LATEST
Ø 32 1.90 1.40 1.12
CALLED IN WRITING. 3. ALL REINFORCING BARS SHALL BE ASTM GRADE 40 OR PS GRADE 275 WITH MINIMUM EDITION). ALL WELDING WORKS SHOULD BE DONE AT THE FABRICATION
YIELD STRENGTH OF FY = 275.8MPA (40,000PSI). Ø 36 2.41 1.48 1.43 PLANT. WELDING WORKS SHALL NOT BE ALLOWED AT THE FIELD. Substation and Electrical Equipment
6. IN CASE OF DISCREPANCIES AS TO LAY-OUT, DIMENSIONS AND ELEVATIONS
BETWEEN STRUCTURAL PLANS AND OTHER DRAWINGS, THE CONTRACTOR 4. ALL REINFORCING BARS SHALL BE DEFORMED IN ACCORDANCE WITH ASTM-615. 6. ALL WELDED WORKS SHALL DEVELOP THE FULL STRENGTH OF THE
SHALL BOTH THE STRUCTURAL ENGINEER & THE OWNER'S REPRESENTATIVE MEMBERS CONNECTED. ALL WELDING WORKS SHALL CONFIRM TO AWS
OR SITE ENGINEER IN WRITING BEFORE PROCEEDING WITH THE AFFECTED 5. ALL BENDS & HOOKS OF BARS SHALL CONFORM TO REQUIREMENTS OF ACI CODE.
NOTES: STANDARD (LATEST EDITION). WELDING RODS SHALL BE E70XX.
WORKS.
1. TYPE-A - BUNDLE BARS
6. THE FOLLOWING
REQUIREMENT:
MINIMUM CONCRETE COVER SHALL BE PROVIDED FOR
TYPE-B - INDIVIDUAL BARS Arnel D. Bersabe
7. IN CASE OF ANY DISCREPANCY IN THE DESIGN AND /OR FIELD CONDITION, THE 7. ALL WELDS SHALL BE FREE FROM UNDER CUTS, PINHOLES & CRACKS.
2. NOT MORE THAN 33% OF THE BARS SHALL BE SPLICED WITHIN THE REQUIRED. Department Manager
D CONTRACTOR MUST FIRST CLARIFY THE MATTER WITH THE OWNER BEFORE NON-DESTRUCTIVE TESTING MAYBE CONDUCTED AT WELDS DEEMED D
A.) CONCRETE DEPOSIT DIRECTLY AGAINST GROUND 75mm
PROCEEDING. MASONRY WALLS: NOT IN CONFORMITY WITH THE SPECIFICATION & SHALL BE TO THE
B.) FORMED CONCRETE IN CONTACT WITH GROUND 50mm
C.) PRIMARY REINFORCEMENT, TIES & STIRRUPS OF BEAM CONTRACTOR'S ACCOUNT.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK
& COLUMN 50mm 1. REINFORCEMENT, AS TABULATED BELOW SHALL BE PROVIDED UNLESS
AMONG THE VARIOUS TRADES/DISCIPLINES AS NECESSARY TO AVOID D.) SLAB ON FILL 50mm OTHERWISE SPECIFIED IN THE PLAN. 8. FOR PAINTED METAL SURFACES, MINERAL SPIRIT OR DETERGENT
CONFLICTS AND ENSURE THE PROPER INSTALLATION AND COMMENCEMENT OF Power System Design
ALL WORK. SHALL BE USED TO WASH THE METAL SURFACE TO REMOVE ANY DIRT
7. ALL ANCHOR BOLTS, DOWELS AND OTHER INSERT SHALL BE PROPERLY POSITIONED
AND SECURED PRIOR TO PLACING OF CONCRETE. OR GREASE BEFORE APPLYING PAINT MATERIALS. WHERE RUST OR
9. THE CONTRACTOR MUST SUBMIT SAMPLES TO OWNER FOR APPROVAL PRIOR SCALE IS PRESENT, CLEAN BY WIRE BRUSH AND SAND PAPER BEFORE
TO INSTALLATION. 8. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SEGREGATION, PAINTING.
RE-HANDLING OR FLOWING, PLACING SHALL BE DONE PREFERABLY WITH BUGGIES,
BUCKETS OR WHEELBARROWS. NO CHUTE WILL BE ALLOWED EXCEPT TO TRANSFER
9. FOR OTHER METAL SURFACES NOT IN CONTACT WITH CONCRETE Eric T. Camerino
E DESIGN LOADS: CONCRETE FROM HOPPERS TO BUGGIES, WHEELBARROWS OR BUCKETS IN WHICH E
SHALL BE APPLIED WITH "TURCO" RUST CONVERTER PRIOR TO THE Department Manager
CASE THEY SHALL NOT EXCEED SIX (6) mts IN AGGREGATE LENGTH. CONCRETE HOLLOW BLOCKS REINFORCEMENTS
1. SUBSTATION CONTROL HOUSE APPLICATION OF TWO COATS OF EPOXY PAINT OF SILVER GRAY
9. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USED OF BLOCK REINFORCEMENT COLOR.
A.)ROOF LINE LOADS = 20.0PSF VIBRATORS UNLESS AUTHORIZED IN WRITING BY THE DESIGNER & ONLY FOR THICKNESS HORIZONTAL VERTICAL
B.)SEISMIC LOAD, ZONE 4 UNUSUAL CONDITION WHERE VIBRATION IS EXTREMELY DIFFICULT TO ACCOMPLISH. (mm)
V = ZICW/RW 10. THE FRAME OF STEEL STRUCTURE SHALL BE CARRIED UP TRUE & PLUMB Power System Design
WHERE: 10.CURING OF CONCRETE SHALL BE DONE IN ACCORDANCE WITH THE METHOD 100 10mmØ BARS AT EVERY 10Ømm BARS AT 600mm C/C
DESCRIBED IN SPECIFICATION. THIRD LAYER OF CHB WITHIN THE LIMITS DEFINE IN THE AISC CODE OF STANDARD PRACTICE.
I = 1.00 ALL ANCHOR BOLTS SHALL BE PROVIDED WITH LEVELING NUTS EACH
11.THE CONTRACTOR SHALL FURNISH & MAINTAIN ADEQUATE FORMS FOR SHORING FOR THESE PURPOSE AND GROUTED TO ACHIEVED MAXIMUM BEARING
Z = 0.40
UNTIL THE CONCRETE MEMBERS HAVE ATTAINED THEIR SUFFICIENT STRENGTH FOR 150 12mmØ BARS AT EVERY 12Ømm BARS AT 600mm C/C
C = 2.75 THE WORKING CONDITION ANTICIPATED. SURFACE BETWEEN STEEL STRUCTURE AND CONCRETE FOUNDATION.
THIRD LAYER OF CHB
F RW = 12.0 Jesse Talavera F
12. UNLESS OTHERWISE SPECIFIED THE SCHEDULE OF REMOVAL OF FORMS & SHORES 200 12mmØ BARS AT EVERY 12Ømm BARS AT 600mm C/C 11. THE MINIMUM DISTANCE BETWEEN ANY PART OF THE STEEL STRUCTURE Supervisor- Civil Works
2. SUBSTATION STRUCTURES OF THE FOLLOWING STRUCTURAL MEMBER ARE AS FOLLOWS: THIRD LAYER OF CHB AND/OR EQUIPMENT AND SURROUNDING GRAVEL SURFACING SHALL
BE 150mm UNLESS OTHERWISE SPECIFIED.
A.)BASIC WIND SPEED = 200KPH A.) FOUNDATION 5 DAYS
B.) WIND PRESSURE =0.00256xVxCD B.) PEDESTALS, COLUMNS & WALLS 7 DAYS
WHERE: C.) BEAMS 21 DAYS 12. ALL ANCHOR BOLTS, NUTS AND LEVELING NUTS SHALL BE ASTM A307
D.) SLABS ABOVE GROUND 14 DAYS AND SHALL BE HOT DIP GALVANIZED WITH MINIMUM COATING OF
NOTES:
CD = DRAG COEFFICIENT 3.4MILS UNLESS OTHERWISE NOTED.
13. UNLESS OTHERWISE NOTED IN PLANS, ALL BEDDED SLABS SHALL BE REINFORCED A. MINIMUM LAP SPLICE = 300mm
= 1.0 ROUND SURFACE
= 1.3 OCTAGONAL SURFACE WITH 12mm REINFORCING BARS @ 400mm O.C. EACH WAYS AT CENTER OF SLAB. B. PROVIDED RIGHT ANGLE REINFORCEMENT AT CORNERS 900mm LONG. Allan Christian Calag
C. WHERE CHB WALLS ADJOINS COLUMNS, BEAMS AND WALLS, DOWELS WITH 13. ALL FASTENERS, BOLTS SHALL BE ASTM A325 AND SHALL BE HOT DIP
= 2.0 FLAT SURFACE THE SAME SIZE AND SPACING AT THAT OF THE HORIZONTAL & VERTICAL
Supervisor- PSDD
14. CONSTRUCTION JOINTS FOR BEDDED SLABS SHALL NOT BE MORE THAN 6.O METER GALVANIZED WITH MINIMUM COATING OF 3.4MILS UNLESS OTHERWISE
G APART. REINFORCEMENTS SHALL BE PROVIDED EXCEPT AS SPECIFIED. G
C.) SEISMIC LOAD, ZONE 4 NOTED.
V = (0.5)ZW 2. ALL CONCRETE HOLLOW BLOCKS SHALL BE LAID OUT WITH THE CELL IN
15. SAMPLING FOR COMPREHENSIVE STRENGTH TEST SHALL BE MADE IN ACCORDANCE
UNOBSTRUCTED VERTICAL CONTINUITY. ALL CELLS ESPECIALLY THOSE WITH 14. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS SHOWING
WITH SPECIFICATIONS.
D.) LIVE LOAD, W = WEIGHT OF EQUIPMENT REINFORCEMENT SHALL BE FILLED WITH MORTAR. COMPLETE INFORMATION NECESSARY FOR THE FABRICATION OF THE
16. DEVELOPMENT LENGTH FOR ALL BARS SHALL BE MINIMUM OF 60 BARS DIAMETER COMPONENT PARTS OF THE STRUCTURE FOR APPROVAL BY THE
UNLESS OTHERWISE SPECIFIED. ENGINEER.
EARTHWORKS: David Jayson Oquendo
Project Engineer - PSDD
1. FOUNDATION SHALL REST ON STABLE NATURAL SOIL UNLESS OTHERWISE
NOTED BY THE ENGINEER. NO FOOTING SHALL REST ON FILL REFERENCE
ELEVATION OR DEPTH FROM NATURAL GRADE LINE (NGL).

H 2. FOOTING ARE DESIGN BASED ON ASSUMED ALLOWABLE SOIL BEARING H


CAPACITY OF 95.8 KPA (2000 PSF). UNLESS OTHERWISE SPECIFIED IN DRAWING.

3. THE TOP OF THE FOUNDATION PEDESTAL FOR STEEL STRUCTURE AND/OR


EQUIPMENT SHALL HAVE MINIMUM OF 150mm DISTANCE FROM THE TOP OF THE
GRAVEL SURFACING UNLESS OTHERWISE SPECIFIED.
DESIGN AND CONSTRUCTION NOTES
Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT DESIGN AND CONSTRUCTION NOTE J
@ BINUGAO SUB - STATION SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 24/43 S-02
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Vice President Engineering

B B

B Enriczar T. Tia
Assistant Vice President Engineering

C C C

Substation and Electrical Equipment


D
EMBANKMENT
(ON FILL 500mm)
E Arnel D. Bersabe
D Department Manager D

F Power System Design

Eric T. Camerino
E H Department Manager
E

Power System Design

F
EMBANKMENT / EARTHWORKS LAYOUT PLAN Jesse Talavera F
SCALE 1:300 MTS Supervisor- Civil Works

Allan Christian Calag


ITEM = 104 Supervisor- PSDD

G G

ON FILL = 500mm
David Jayson Oquendo
EXISTING Project Engineer - PSDD

H H

SECTION THRU "A"


SCALE 1:100 MTS

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES
1
1 : 200 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

EMBANKMENT / EARTHWORK LAYOUT PLAN CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT EMBANKMENT/EARTHWORKS LAYOUT PLAN J
@ BINUGAO SUB - STATION SECTION THRU "A" SHEET NO.
RODGER S. VELASCO SECTION THRU "A" 25/43 S-03
REG NO: 0143073
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B

F1
C1
WF
1
LANDSCAPE
F1
C 1
8-16mmØ VERT. BAR Enriczar T. Tia
TIES W/ 10mmØ,2-50mm,
Assistant Vice President Engineering
7-100mm, REST 200mm

100mmTHK CHB W/ 10mmØ


C VERTICAL BARS SP. @ 600mm C
AND 10mmØ HORIZONTAL BARS
SP. @ EVERY 3RD LAYER

8 - 16mmØ DRSB SPACED


EQUALLY BOTHWAYS
Substation and Electrical Equipment

Arnel D. Bersabe
D F1C1 PLAN Department Manager D
WF1

LANDSCAPE

Power System Design


FOUNDATION PLAN (MAIN ENTRANCE GATE)
SCALE 1:100 MTS

3-10mmØ LONG BARS WITH


10mmØ TRANSVERS BARS
Eric T. Camerino
E E
SPACE @ 300mm Department Manager

Power System Design


8 - 16mmØ DRSB SPACED
EQUALLY BOTHWAYS

F
100mmTHK GRAVEL BASE WF1 DETAIL (WALL FOOTING TYPICAL) Jesse Talavera
Supervisor- Civil Works
F

SCALE 1:10 MTS


SECTION

F1C1 DETAIL (TYPICAL)


SCALE 1:20 MTS Allan Christian Calag
Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I

Jeffrey O. Lampara
Project Inspector-MES
1
1 : 200 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT
FOUNDATION PLAN (MAIN ENTRANCE GATE) J
@ BINUGAO SUB - STATION SHEET NO.
REG NO: 0143073 RODGER S. VELASCO F1C1 DETAIL 26/43 S-04
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
WF1 DETAIL
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

B B

A Enriczar T. Tia
Assistant Vice President Engineering
OUTGOING 13.8kV FEEDER POWER CABLE TRENCH
B
C OUTGOING FEDDER POWER CABLE TRENCH C

BYPASS STRUCTURE
Substation and Electrical Equipment

Arnel D. Bersabe
D Department Manager
D D

E Power System Design

Eric T. Camerino
E Department Manager
E
F

G Power System Design

H
F Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CABLE TRENCH LAYOUT PLAN 1 : 200 A-02 A-02


1

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CABLE TRENCH LAYOUT PLAN CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION CABLE TRENCH LAYOUT PLAN SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 27/43 S-05
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

10mm THK. GRAVEL Mark A. Valencia


SURFACE 1-1/2"Ø Vice President Engineering

TRENCH COVER
FGL.
B B

COMPACTED 12mmØ HORIZONTAL


FILL
BARS SP. @ 250mm O.C
SECTION Enriczar T. Tia
16mmØ VERTICAL SCL 1:1 MTS Assistant Vice President Engineering
BARS SP. @ 250mm O.C

C C

CONSTRUCTION JOINT

SLOPE 1% Substation and Electrical Equipment


100mm THK. GRAVEL
BASE 2"Ø

12mmØ DOWEL BAR


CABLE RACK DETAIL
SCALE 1:10 MTS
Arnel D. Bersabe
Department Manager
D FOR CABLE TRAY D

PLAN ELEVATION

TYPICAL CABLE TRENCH SECTION "A" DETAIL


SCALE 1:10 MTS
Power System Design

Eric T. Camerino
E Department Manager
E

PLAN
Power System Design
CABLE TRAY DETAIL
SCALE 1:10 MTS
SECTION

F Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G G

CABLE TRAY SECTION DETAIL


SCALE 1:3 MTS
David Jayson Oquendo
Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES
1
CABLE TRENCH LAYOUT PLAN 1 : 200 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CABLE RACK DETAIL CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION CABLE TRAY SECTION DETAIL CABLE TRENCH SECTION "A" DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO CABLE TRENCH SECTION DETAIL CABLE TRAY SECTION DETAIL 28/43 S-06
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO CABLE RACK DETAIL
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


(FEMALE PAIR) for implementation
(MALE PAIR)
Mark A. Valencia
Vice President Engineering

TYPICAL SLOTTED HOLE


(BREATHER)
B TYPICAL SLOTTED HOLE
(BREATHER)
RIGHT SIDE B
RIGHT SIDE

LEFT SIDE TOP VIEW


LEFT SIDE Enriczar T. Tia
TOP VIEW FEMALE FEMALE
Assistant Vice President Engineering

MALE MALE
C C

TYPICAL FRONT VIEW TYPICAL FRONT VIEW

Substation and Electrical Equipment

ISOMETRIC RIGHT SIDE VIEW ISOMETRIC LEFT SIDE VIEW


NOTE: TRENCH COVER ( 3MM THICK
ISOMETRIC RIGHT SIDE VIEW ISOMETRIC LEFT SIDE VIEW CHECKERED PLATE, HDG )
Arnel D. Bersabe
D Department Manager D

Power System Design

MALE &
FEMALE
TRENCH COVER

Eric T. Camerino
E E
Department Manager

TRENCH

Power System Design

TRENCH COVER ( 3MM THICK


F CHECKERED PLATE, HDG ) Jesse Talavera F
Supervisor- Civil Works

ISOMETRIC

Allan Christian Calag


Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I

Jeffrey O. Lampara
Project Inspector-MES
1
CABLE TRENCH COVER DETAIL 1 : 200 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT CABLE TRENCH COVER DETAIL CHECKED BY: J. TALAVERA
J J
@ BINUGAO SUB - STATION CABLE TRENCH COVER DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 29/43 S-07
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B

SECTION A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Enriczar T. Tia
Assistant Vice President Engineering

C C
A

B
A Substation and Electrical Equipment
B D
C

Arnel D. Bersabe
D D SECTION B Department Manager D

E
Power System Design

C
F
Eric T. Camerino
E E
G Department Manager

H
Power System Design
SECTION C

F ACCESS ROAD LAYOUT PLAN


SCALE 1:300 MTS
Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G
SECTION D G

ROAD SECTION DETAIL (TYPICAL)


SCALE 1:60 MTS David Jayson Oquendo
Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

ROADWAY LAYOUT
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT ACCESS ROAD LAYOUT PLAN J
@ BINUGAO SUB - STATION ACCESS ROAD LAYOUT PLAN SHEET NO.
REG NO: 0143073 RODGER S. VELASCO ROAD SECTION DETAIL
ROAD SECTION DETAIL (TYPICAL) 30/43 S-08
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Mark A. Valencia
Vice President Engineering

B
A B

Enriczar T. Tia
Assistant Vice President Engineering

C
C C

D Substation and Electrical Equipment

Arnel D. Bersabe
D
E Department Manager D

F
Power System Design

G
Eric T. Camerino
E E
Department Manager

H
Power System Design

F Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I

Jeffrey O. Lampara
Project Inspector-MES
SCALE 1
FOUNDATION PLAN 1 : 200 A-02 A-02
CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION FOUNDATION PLAN SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 31/43 S-09
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B

PLAN PLAN
Enriczar T. Tia
PLAN Assistant Vice President Engineering

C C

Substation and Electrical Equipment

Arnel D. Bersabe
D Department Manager D

Power System Design

SECTION SECTION
Eric T. Camerino
E SECTION Department Manager
E

F2 DETAIL (H-FRAME SUPPORT FOUNDATION)


SCALE 1:30 MTS

F1 DETAIL (TYPICAL) Power System Design


SCALE 1:30 MTS

F Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G G

ANCHOR BOLT SETTING PLAN


SCALE 1:10 MTS
David Jayson Oquendo
Project Engineer - PSDD

H H

Planning and Design

I I

Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION F1 DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO F2 DETAIL 32/43 S-10
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

69 KV Davao Light and Power Company


Engineering Group
2-2"x41" ANGLE BAR
2 STIFFENER
A 1 2 2 1 Hereby Approved this Document A
for implementation
NOTE: FOR STEEL GRATINGS

USE: (HDG) 50mm x 6mm Flat Bar


4 3
Spaced at 40mm o.c. and
2"x41" Angle Bar stiffener Mark A. Valencia
4 3
1 in the middle for the length
more than 1 meter
Vice President Engineering

PLAN (SEE DETAILED PLAN)

B CRUSH GRAVELLING
B
DIMENSION OF STEEL GRATING OVERLAY ALUMINUM EXPANDED

1 2 2 1 NO. DIMENSIONS L X W
METAL 12"x0.081" RAISED

ALUMINUM MOSQUITO SCREEN


WITH FLAT ALUMINUM FRAME
1 1925 X 1250
2 1400 X 1250 150mm THK GRAVEL 50mmX6mm FLAT BAR
STEEL GRATING

3 1820 X 1275 150 mm THK


CONCRETE WALL
4 480 X 1275
SECTION "VIEW 2" "VIEW 1" DETAIL Enriczar T. Tia
STEEL GRATING LAYOUT PLAN
SCALE 1:60 MTS
STEEL GRATING DETAIL
SCALE 1:30 MTS
Assistant Vice President Engineering

C C

Substation and Electrical Equipment

Arnel D. Bersabe
D Department Manager D

SUBMERSIBLE PUMP SECTION DETAIL Power System Design


SCALE 1:30 MTS

69 KV

Eric T. Camerino
E Department Manager
E

Power System Design

F Jesse Talavera F
Supervisor- Civil Works

B B
Allan Christian Calag
Supervisor- PSDD

G A A G

David Jayson Oquendo


F3 DETAIL (TRANSFORMER FOUNDATION)
Project Engineer - PSDD

SCALE 1:40 MTS


H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION F3 DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 33/43 S-11
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation
20mmØ X 500mm ANCHOR BOLTS

Mark A. Valencia
FTB FTB 12 - 12mmØ VERTICAL BARS WITH 10mmØ TIES Vice President Engineering
20mmØ X 500mm ANCHOR BOLTS
SPACED @ 2-50mm, 2-100mm, REST @ 150mm O.C

B 12 - 12mmØ VERTICAL BARS WITH 10mmØ TIES B


SPACED @ 2-50mm, 2-100mm, REST @ 150mm

COLUMN PLAN
Enriczar T. Tia
Assistant Vice President Engineering

C 12 - 12mmØ VERTICAL BARS WITH 10mmØ TIES C


SPACED @ 2-50mm, 2-100mm, REST @ 150mm O.C

12 - 12mmØ VERTICAL BARS WITH 10mmØ TIES Substation and Electrical Equipment
SPACED @ 2-50mm, 2-100mm, REST @ 150mm 7 - 16mmØ DRSB SPACED EQUALLY BOTHWAYS
FTB FTB

Arnel D. Bersabe
7 - 16mmØ DRSB SPACED EQUALLY BOTHWAYS
D Department Manager D

PLAN
Power System Design

12 - 12mmØ VERTICAL BARS WITH 10mmØ TIES


SPACED @ 2-50mm, 2-100mm, REST @ 150mm O.C
FTB FTB Eric T. Camerino
E Department Manager
E
12 - 12mmØ VERTICAL BARS WITH 10mmØ TIES
SPACED @ 2-50mm, 2-100mm, REST @ 150mm
7 - 16mmØ DRSB SPACED EQUALLY BOTHWAYS

Power System Design


F5 DETAIL (69 KV HAPAM DISCONNECTOR FOUNDATION PLAN )
7 - 16mmØ DRSB SPACED EQUALLY BOTHWAYS 1:30
SCALE MTS

F Jesse Talavera F
SECTION Supervisor- Civil Works

4 - 12mmØ HORIZONTAL BARS WITH 10mmØ STIRRUPS


SPACED @ 1-50mm, 2-100mm, REST @ 150mm Allan Christian Calag

G
F4 DETAIL (TYPICAL) Supervisor- PSDD

G
SCALE 1:30 MTS
FOOTING TIE BEAM DETAIL
SCALE 1:20 MTS

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION F4 DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO F5 DETAIL 34/43 S-12
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

12-16mmØ VERTICAL BARS


10-12mmØ PEDESTAL
SP. AS SHOWN WITH 10mmØ TIES SP. Mark A. Valencia
BARS SP. AS SHOWN Vice President Engineering
4 @ 100mm, REST
WITH 10mmØ TIES SP. EMBANKMENT AT 200mm O.C
2@50, 2 @ 100, REST
AT 150mm O.C

B B

21-16mmØ BED BARS


BOTHWAYS (top bars)

10-16mmØ BED BARS Enriczar T. Tia


BOTHWAYS (top bars)
Assistant Vice President Engineering

C FRONT ELEVATION (SECTION) SIDE ELEVATION (SECTION) C


21-16mmØ BED BARS
SECTION BOTHWAYS

10-16mmØ BED BARS Substation and Electrical Equipment


BOTHWAYS

9-16mmØ BED BARS


SPACED EQUALLY, O.C.
BOTHWAYS 9-16mmØ BED BARS 21-16mmØ BED BARS Arnel D. Bersabe
SPACED EQUALLY, O.C. BOTHWAYS
D 4-20mmØ ANCHOR Department Manager D
BOTHWAYS
BOLT, HDG

Power System Design

Eric T. Camerino
E 20mmØ ANCHOR BOLTS, HDG 10-16mmØ BED BARS E
Department Manager
PLAN BOTHWAYS

F7 DETAIL (TYPICAL) Power System Design

TOP VIEW REBAR DETAILS SCALE 1:30 MTS

F WASHER
Jesse Talavera F
Supervisor- Civil Works
NUT
10mm THK 12-16mmØ VERTICAL
W 12x65
STIFFENER BARS SP. AS SHOWN
25mmØ ANCHOR

F6 DETAIL (TYPICAL) 10mm THK


BOLT (A325 BOLTS)
WITH 10mmØ TIES SP.
4 @ 100mm, REST
AT 200mm O.C
SCALE 1:30 MTS
STIFFENER WASHER
NUT
Allan Christian Calag
30mmØ Supervisor- PSDD
BOLTHOLE 25mmØ x 600mm
G ANCHOR BOLT G
(A325 BOLTS)
P6 (BASE PLATE) DETAIL OF ANCHOR BOLT PEDESTAL DETAIL P6

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION F6 DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO F7 DETAIL 35/43 S-13
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

8-16mmØ BED BARS SP. AS SHOWN

12-16mmØ VERTICAL BARS


SP. AS SHOWN WITH 10mmØ TIES SP.
Mark A. Valencia
2 @ 50mm, 5-100mm,REST Vice President Engineering
AT 250mm COLUMN PLAN

B COLUMN PLAN B

8-16mmØ BED BARS SP. AS SHOWN


Enriczar T. Tia
Assistant Vice President Engineering
7-16mmØ BED BARS SP. AS SHOWN
12-16mmØ VERTICAL BARS
C SP. AS SHOWN WITH 10mmØ TIES SP. C
@ 2-50mm, 5-100mm,REST
12-16mmØ VERTICAL BARS AT 250mm
SP. AS SHOWN WITH 10mmØ TIES SP.
2 @ 50mm, 5-100mm,REST
AT 250mm
Substation and Electrical Equipment

Arnel D. Bersabe
D
PLAN PLAN Department Manager D

Power System Design

12-16mmØ VERTICAL BARS


SP. AS SHOWN WITH 10mmØ TIES SP.
12-16mmØ VERTICAL BARS
SP. AS SHOWN WITH 10mmØ TIES SP.
Eric T. Camerino
E Department Manager E
2 @ 50mm, 5-100mm,REST @ 2-50mm, 5-100mm,REST
AT 250mm AT 250mm

Power System Design

F 8-16mmØ BED BARS SP. AS SHOWN Jesse Talavera F


Supervisor- Civil Works

SECTION 7-16mmØ BED BARS SP. AS SHOWN SECTION

Allan Christian Calag


F8 DETAIL (TYPICAL) F9 DETAIL (TYPICAL)
Supervisor- PSDD

G G
SCALE 1:30 MTS SCALE 1:30 MTS

David Jayson Oquendo


Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION F8 DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO F9 DETAIL 36/43 S-14
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

12-16mmØ VERTICAL BARS


SP. AS SHOWN WITH 10mmØ TIES SP.
@ 2-50mm, 5-100mm,REST
AT 250mm Mark A. Valencia
Vice President Engineering

COLUMN PLAN 12-16mmØ VERTICAL BARS


SP. AS SHOWN WITH 10mmØ TIES SP.
B B
4 @ 100mm, REST
AT 200mm O.C

8-16mmØ BED BARS


(bott bars)
Enriczar T. Tia
13-16mmØ BED BARS Assistant Vice President Engineering
(bott bars)

12-16mmØ VERTICAL BARS


C SP. AS SHOWN WITH 10mmØ TIES SP. C
13-16mmØ BED BARS
@ 2-50mm, 5-100mm,REST
AT 250mm
8-16mmØ BED BARS SECTION (bott bars)
(bott bars)

Substation and Electrical Equipment


8-16mmØ BED BARS
7-16mmØ BED BARS SP. AS SHOWN (bott bars)

Arnel D. Bersabe
D
PLAN 13-16mmØ BED BARS Department Manager D
(bott bars)

Power System Design

12-16mmØ VERTICAL BARS


SP. AS SHOWN WITH 10mmØ TIES SP.
Eric T. Camerino
E Department Manager
E
@ 2-50mm, 5-100mm,REST
AT 250mm

PLAN Power System Design

F11 DETAIL (TYPICAL)


SCALE 1:30 MTS

F 7-16mmØ BED BARS SP. AS SHOWN


WASHER
Jesse Talavera F
Supervisor- Civil Works
NUT
10mm THK 12-16mmØ VERTICAL
W 12x65
STIFFENER BARS SP. AS SHOWN
25mmØ ANCHOR
SECTION BOLT (A325 BOLTS)
WITH 10mmØ TIES SP.
4 @ 100mm, REST
AT 200mm O.C
10mm THK
STIFFENER WASHER
NUT
Allan Christian Calag
F10 DETAIL (TYPICAL)
30mmØ Supervisor- PSDD
BOLTHOLE 25mmØ x 600mm
G ANCHOR BOLT G
SCALE 1:30 MTS (A325 BOLTS)
P6 (BASE PLATE) DETAIL OF ANCHOR BOLT PEDESTAL DETAIL P6

BASE PLATE DETAIL


SCALE 1:30 MTS
David Jayson Oquendo
Project Engineer - PSDD

H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION F10 DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO F11 DETAIL 37/43 S-15
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering
12-16mmØ VERTICAL BARS
SP. AS SHOWN WITH 10mmØ TIES SP.
4 @ 100mm, REST
AT 200mm O.C
B 12-16mmØ VERTICAL BARS B
SP. AS SHOWN WITH 10mmØ TIES SP.
4 @ 100mm, REST
AT 200mm O.C

24-16mmØ BED BARS


Enriczar T. Tia
BOTHWAYS (top bars) Assistant Vice President Engineering

17-16mmØ BED BARS


13-16mmØ BED BARS BOTHWAYS (TOP BARS)
C C
BOTHWAYS 8-16mmØ BED BARS
BOTHWAYS (TOP BARS)

Substation and Electrical Equipment


13-16mmØ BED BARS
SECTION BOTHWAYS PLAN 8-16mmØ BED BARS
BOTHWAYS (TOP BARS)
24-16mmØ BED BARS
17-16mmØ BED BARS
BOTHWAYS (bot bars)
BOTHWAYS (TOP BARS) Arnel D. Bersabe
D Department Manager D

24-16mmØ BED BARS 17-16mmØ BED BARS


BOTHWAYS BOTHWAYS (TOP BARS)
Power System Design

Eric T. Camerino
E Department Manager
E

8-16mmØ BED BARS


BOTHWAYS (TOP BARS)

13-16mmØ BED BARS


Power System Design
BOTHWAYS

SECTION
PLAN
F Jesse Talavera F
F12 DETAIL (TYPICAL) F13 DETAIL (TYPICAL) Supervisor- Civil Works

SCALE 1:30 MTS SCALE 1:30 MTS

WASHER WASHER
NUT NUT
10mm THK 12-16mmØ VERTICAL 10mm THK 12-16mmØ VERTICAL
W 12x65 W 12x65
STIFFENER
25mmØ ANCHOR
BARS SP. AS SHOWN
WITH 10mmØ TIES SP.
STIFFENER
25mmØ ANCHOR
BARS SP. AS SHOWN
WITH 10mmØ TIES SP.
Allan Christian Calag
BOLT (A325 BOLTS) BOLT (A325 BOLTS) Supervisor- PSDD
4 @ 100mm, REST 4 @ 100mm, REST
AT 200mm O.C AT 200mm O.C
G 10mm THK 10mm THK G
STIFFENER WASHER STIFFENER WASHER
NUT NUT
30mmØ 30mmØ
BOLTHOLE 25mmØ x 600mm BOLTHOLE 25mmØ x 600mm
ANCHOR BOLT ANCHOR BOLT
(A325 BOLTS) (A325 BOLTS) David Jayson Oquendo
P6 (BASE PLATE) DETAIL OF ANCHOR BOLT PEDESTAL DETAIL P6 P6 (BASE PLATE) DETAIL OF ANCHOR BOLT PEDESTAL DETAIL P6 Project Engineer - PSDD

H
BASE PLATE DETAIL
SCALE 1:30 MTS
BASE PLATE DETAIL
SCALE 1:30 MTS
H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION F12 DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO F13 DETAIL 38/43 S-16
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
Vice President Engineering

B B

Enriczar T. Tia
Assistant Vice President Engineering

C C

Substation and Electrical Equipment

Arnel D. Bersabe
D Department Manager D

Power System Design

SECTION
Eric T. Camerino
E Department Manager
E

Power System Design

F Jesse Talavera F
Supervisor- Civil Works

Allan Christian Calag


Supervisor- PSDD

G G

David Jayson Oquendo


Project Engineer - PSDD

F13 DETAIL (85' POLE FOUNDATION)


H SCALE 1:20 MTS H

PLAN

Planning and Design

I I

Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION F12 DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO F13 DETAIL 39/43 S-17
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


INDEX Engineering Group

A Hereby Approved this Document A


for implementation

A B

Mark A. Valencia
1 16mmØ HOR. BARS SP. Vice President Engineering

@300mm BOTH SIDES


OUTSIDE
B
2 20mmØ VERTICAL BARS SP. B
@220mm BOTH SIDES

INSIDE 3 9-20mm∅ LONG BARS

4 20mm∅ TRANSVERSE
BARS SP. @90mm O.C. Enriczar T. Tia
Assistant Vice President Engineering
5 BLASTWALL FOUNDATION
PLAN
C 6 100mm THK. GRAVEL C
BASE, COMPACTED 95%
MDD
Substation and Electrical Equipment
7 25mm GROOVE

8 345mm THK. BLASTWALL

A B 9 8-20mmØ VERTICAL BARS Arnel D. Bersabe


D Department Manager D
10 12mm∅ STIRRUPS SP.@
2-50mm, 7-100mm Rest
@ 180mm
11 30 mm thk Concrete Molding Power System Design
12 30 mm thk Concrete Molding
13 10mm∅ sp. @ 300 mm O.C.
14 2-10mm∅ Continuous Bar Eric T. Camerino
E Department Manager
E

7 NOTE:

1.) SMOOTH PLASTER FINISHED W/


Power System Design
PLEXIBONF PAINT.

2.) INSERT 2"X2"X18" MESH WIRE


BOTH SIDES OF THE WALLING
F PRIOR TO POURING. Jesse Talavera F
Supervisor- Civil Works

3.) 12mm THK. CONCRETE GROOVE.

4.) 3000psi FOR CONCRETE


8
5.) ALL REBARS MUST BE GR. 40 Allan Christian Calag
Supervisor- PSDD
6.) THIS WILL COMPLY THE SUB-
G G
STATION FIRE PROTECTION STD.
5 SINCE THE TRANSFORMER IS
MORE THEN 2000gallons OF INSU-
6 LATING OIL.
David Jayson Oquendo
7.) THIS BLASTWALL WILL SUS- Project Engineer - PSDD
TAIN THE 2HRS. FIRING RATE.

H 8.) THE HEIGHT OF THE BLASTWALL H


SHOULD BE 1 FT. ABOVE THE CON-
SERVATOR TANK OF THE TX.

9.) THE WIDTH OF WALL SHOULD BE


EXTENDED AT LEAST 2FT. OF THE
EDGE OF TRANSFORMER BOTHSIDE. Planning and Design
ELEVATION (INSIDE)
I I
Jeffrey O. Lampara
BLASTWALL DETAIL
SCALE 1:40 MTS
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION SHEET NO.
RODGER S. VELASCO BLAST WALL DETAIL 40/43 S-18
REG NO: 0143073
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


INDEX Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
INSIDE 1 16mmØ HOR. BARS SP. Vice President Engineering

@300mm BOTH SIDES

B
2 20mmØ VERTICAL BARS SP. B
OUTSIDE @220mm BOTH SIDES

3 9-20mm∅ LONG BARS

4 20mm∅ TRANSVERSE
BARS SP. @90mm O.C. Enriczar T. Tia
B PLAN A Assistant Vice President Engineering
5 BLASTWALL FOUNDATION

C 6 100mm THK. GRAVEL C


BASE, COMPACTED 95%
MDD
Substation and Electrical Equipment
7 25mm GROOVE
11
B A 8 345mm THK. BLASTWALL

9 8-20mmØ VERTICAL BARS Arnel D. Bersabe


D Department Manager D
10 12mm∅ STIRRUPS SP.@
12 2-50mm, 7-100mm Rest
@ 180mm
11 30 mm thk Concrete Molding Power System Design
12 30 mm thk Concrete Molding
13 10mm∅ sp. @ 300 mm O.C.
14 2-10mm∅ Continuous Bar Eric T. Camerino
E Department Manager
E

7 NOTE:

1.) SMOOTH PLASTER FINISHED W/


Power System Design
PLEXIBONF PAINT.

2.) INSERT 2"X2"X18" MESH WIRE


BOTH SIDES OF THE WALLING
F PRIOR TO POURING. Jesse Talavera F
Supervisor- Civil Works

3.) 12mm THK. CONCRETE GROOVE.

4.) 3000psi FOR CONCRETE


11
5.) ALL REBARS MUST BE GR. 40 Allan Christian Calag
Supervisor- PSDD
6.) THIS WILL COMPLY THE SUB-
G G
STATION FIRE PROTECTION STD.
SINCE THE TRANSFORMER IS
MORE THEN 2000gallons OF INSU-
LATING OIL.
David Jayson Oquendo
7.) THIS BLASTWALL WILL SUS- Project Engineer - PSDD
TAIN THE 2HRS. FIRING RATE.

H 8.) THE HEIGHT OF THE BLASTWALL H


SHOULD BE 1 FT. ABOVE THE CON-
SERVATOR TANK OF THE TX.

9.) THE WIDTH OF WALL SHOULD BE


EXTENDED AT LEAST 2FT. OF THE
ELEVATION (OUTSIDE) EDGE OF TRANSFORMER BOTHSIDE. Planning and Design

I
BLASTWALL DETAIL
SCALE 1:40 MTS
Jeffrey O. Lampara
I

Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION SHEET NO.
RODGER S. VELASCO BLAST WALL DETAIL 41/43 S-19
REG NO: 0143073
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


INDEX Engineering Group

A Hereby Approved this Document A


for implementation

Mark A. Valencia
1 16mmØ HOR. BARS SP. Vice President Engineering

@300mm BOTH SIDES


2 20mmØ VERTICAL BARS SP.
B
14 @220mm BOTH SIDES
B

13
3 9-20mm∅ LONG BARS

9 4 20mm∅ TRANSVERSE
BARS SP. @90mm O.C. Enriczar T. Tia
1 10 5 BLASTWALL FOUNDATION
Assistant Vice President Engineering

C 6 100mm THK. GRAVEL C


BASE, COMPACTED 95%
MDD
Substation and Electrical Equipment
7 25mm GROOVE

8 345mm THK. BLASTWALL


2 9 8-20mmØ VERTICAL BARS Arnel D. Bersabe
D Department Manager D
10 12mm∅ STIRRUPS SP.@
2-50mm, 7-100mm Rest
@ 180mm
11 30 mm thk Concrete Molding Power System Design
12 30 mm thk Concrete Molding
13 10mm∅ sp. @ 300 mm O.C.
14 2-10mm∅ Continuous Bar Eric T. Camerino
E Department Manager
E

NOTE:

1.) SMOOTH PLASTER FINISHED W/


3 PLEXIBONF PAINT.
Power System Design

2.) INSERT 2"X2"X18" MESH WIRE


BOTH SIDES OF THE WALLING
F PRIOR TO POURING. Jesse Talavera F
Supervisor- Civil Works

3.) 12mm THK. CONCRETE GROOVE.

4 4.) 3000psi FOR CONCRETE

5.) ALL REBARS MUST BE GR. 40 Allan Christian Calag


Supervisor- PSDD
6.) THIS WILL COMPLY THE SUB-
G G
STATION FIRE PROTECTION STD.
SECTION "A" DETAIL SECTION "B" DETAIL SINCE THE TRANSFORMER IS
SCALE 1:30 MTS SCALE 1:30 MTS MORE THEN 2000gallons OF INSU-
LATING OIL.
David Jayson Oquendo
7.) THIS BLASTWALL WILL SUS- Project Engineer - PSDD
TAIN THE 2HRS. FIRING RATE.

H 8.) THE HEIGHT OF THE BLASTWALL H


SHOULD BE 1 FT. ABOVE THE CON-
SERVATOR TANK OF THE TX.

9.) THE WIDTH OF WALL SHOULD BE


EXTENDED AT LEAST 2FT. OF THE
EDGE OF TRANSFORMER BOTHSIDE. Planning and Design

I I

Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT SECTION "A" DETAIL J
@ BINUGAO SUB - STATION SECTION "B" DETAIL SHEET NO.
REG NO: 0143073 RODGER S. VELASCO 42/43 S-20
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Davao Light and Power Company


Engineering Group

A Hereby Approved this Document A


for implementation

safety signages during construction Mark A. Valencia


Vice President Engineering

THINK THINK B

SAFETY Enriczar T. Tia

900

900
SAFETY
Assistant Vice President Engineering

FIRST
C C

IS EVERYONE’S JOB Substation and Electrical Equipment

1800 1800
Arnel D. Bersabe
D Department Manager D

WARNING NOTICE Power System Design

HARD HAT THIS IS A Eric T. Camerino

900
E Department Manager
E

REQUIRED SMOKE FREE


Power System Design
IN THIS AREA WORKPLACE
F 1800 1800
Jesse Talavera F
Supervisor- Civil Works

safety signages after completion

Allan Christian Calag


Supervisor- PSDD

G G
1000

1000

1000

1000
HIGH VOLTAGE HIGH VOLTAGE David Jayson Oquendo
Project Engineer - PSDD

1000 1000 1000 1000


H H

Planning and Design

I I
Jeffrey O. Lampara
Project Inspector-MES

CIVIL ENGINEER: PROJECT NAME: APPROVED BY: REV DESCRIPTION DATE REV. BY: DRAWING TITLE DRAWN BY: J.O LAMPARA

CHECKED BY: J. TALAVERA


J JOEN B.GABALUNOS CONSTRUCTION OF SITE DEVELOPMENT J
@ BINUGAO SUB - STATION SHEET NO.
REG NO: 0143073 RODGER S. VELASCO SAFETY SIGNAGE DETAIL 43/43 S-21
DATE REG: 12/15/2015 DATE: 1/11/19 LOCATION: EVP-COO
PTR NO: 1735182 TIN: 480299386 BINUGAO, TORIL DISTRICT, DAVAO CITY PROJECT NO.