SOR Format for reference only.

Bid to be submitted in excel file available on the e-tender portal only

TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

PRICE BID
(Fill in the yellow coloured cells only)

I/We have read the complete Tender Document including Schedule of Rates and understood the complete scope of work. We have gone through the IGL's estimated rates as per enclosed
SOR. We are submitting our quote in percentage as below and the same is binding on me/us.

NAME OF BIDDER:
QUOTED DISCOUNT / MARK-UP / AT-PAR IN PERCENTAGE UPON IGL
COST ESTIMATE:
IGL COST ESTIMATE (INR) 3,62,27,406
BIDDER'S QUOTE: Not quoted
TOTAL AMOUNT AS PER THE QUOTED PERCENTAGE (INR)* Not quoted
Notes:
1. Bidder quoting BELOW the estimated rates i.e. DISCOUNT should include negetive (-) sign along with numerical figure in B4 Cell. (For Example: If bidder wants to quote 5% below
estimate i.e. 5% DISCOUNT, then in B4 cell bidder should write -5%)
2. Bidder quoting ABOVE the estimated rates i.e. MARK-UP should include positive (+) sign along with numerical figure in B4 Cell. (For Example: if Bidder wants to quote 5% above
estimate i.e. 5% MARK-UP, then in B4 cell bidder should write 5%)
3. Bidders quoting at AT-PAR the estimated rates should write ZERO (0) in B4 Cell. (For Example: if Bidder wants to quote same rates as IGL offered SOR estimate, then in B4 cell
bidder should write 0%)
4. *Bidder's quoted discount/mark-up % will be uniformly applicable on all SOR items of the IGL estimate. Unit rates of SOR items arrived after discount/mark-up % shall be rounded-off
to 2 decimal places for award.

Digitally signed by
AJITESH AJITESH KUSHWAHA
KUSHWAHA Date: 2022.12.28
17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

1 Welding/Fabrication of Above Ground/ Under Ground pipeline A B C


Fabrication, Erection & Installation of piping, valves in new CNG/FRS/DRS/MRS stations: The work will involve mainly : Handling of pipes, edge preparation by grinding
& honing of pipes, beveling,U.T, aligning, fit-up, cold cutting and welding as per API1104/ASME Section-VIII & IX,D.P test, 100% radiography, hydtro-testing,
WELDING OF dewatering,painting of entire piping as per supplied drawing as per instruction of EIC. Attachment of all pipe fittings like flanges, elbows, tees, reducers etc.to be counted as
1 1.1 NO 4.00 594.00 2,376.00
JOINTS-1/2" per no of welding joints of respective pipe dia size. The above includes supply & fixing of nuts, stud bolts & sprial wound metallic gaskets for flanges, suitable for ANSI
CLASS 300 as per work rquirement. The above also includes the transportation of material from stores to the various sites. The fabrication & installation will be required
for the following pipe sizes --do--,0.5"
Fabrication, Erection & Installation of piping, valves in new CNG/FRS/DRS/MRS stations: The work will involve mainly : Handling of pipes, edge preparation by grinding
& honing of pipes, beveling,U.T, aligning, fit-up, cold cutting, welding as per API1104/ASME Section-VIII & IX,D.P test, 100% radiography, hydtro-testing,
FAB/EREC/INST-
dewatering,painting of entire piping as per supplied drawing as per instruction of EIC. Attachment of all pipe fittings like flanges, elbows, tees, reducers etc.to be counted as
2 1.2 1.5" NO 10.00 712.80 7,128.00
per no of welding joints of respective pipe dia size. The above includes supply & fixing of nuts, stud bolts & sprial wound metallic gaskets for flanges, suitable for ANSI
PIPING/VALVE
CLASS 300 as per work rquirement. The above also includes the transportation of material from stores to the various sites. The fabrication & installation will be required
for the following pipe sizes --do--,1.5"
Fabrication, Erection & Installation of piping, valves in new CNG/FRS/DRS/MRS stations: The work will involve mainly : Handling of pipes, edge preparation by grinding
& honing of pipes, beveling,U.T, aligning, fit-up, cold cutting, welding as per API1104/ASME Section-VIII & IX,D.P test, 100% radiography, hydtro-testing,
FAB/EREC/INST- dewatering,painting of entire piping as per supplied drawing as per instruction of EIC. Attachment of all pipe fittings like flanges, elbows, tees, reducers etc.to be counted as
3 1.3 NO 1113.00 1620.00 18,03,060.00
2" PIPING/VALVE per no of welding joints of respective pipe dia size. The above includes supply & fixing of nuts, stud bolts & sprial wound metallic gaskets for flanges, suitable for ANSI
CLASS 300 as per work rquirement. The above also includes the transportation of material from stores to the various sites. The fabrication & installation will be required
for the following pipe sizes --do--,2"
Fabrication, Erection & Installation of piping, valves in new CNG/FRS/DRS/MRS stations: The work will involve mainly : Handling of pipes, edge preparation by grinding
& honing of pipes, beveling,U.T, aligning, fit-up, cold cutting, welding as per API1104/ASME Section-VIII & IX,D.P test, 100% radiography, hydtro-testing,
FAB/EREC/INST- dewatering,painting of entire piping as per supplied drawing as per instruction of EIC. Attachment of all pipe fittings like flanges, elbows, tees, reducers etc.to be counted as
4 1.4 NO 11.00 1404.00 15,444.00
3" PIPING/VALVE per no of welding joints of respective pipe dia size. The above includes supply & fixing of nuts, stud bolts & sprial wound metallic gaskets for flanges, suitable for ANSI
CLASS 300 as per work rquirement. The above also includes the transportation of material from stores to the various sites. The fabrication & installation will be required
for the following pipe sizes --do--,3"
Fabrication, Erection & Installation of piping, valves in new CNG/FRS/DRS/MRS stations: The work will involve mainly : Handling of pipes, edge preparation by grinding
& honing of pipes, beveling,U.T, aligning, fit-up, cold cutting, welding as per API1104/ASME Section-VIII & IX,D.P test, 100% radiography, hydtro-testing,
FAB/EREC/INST- dewatering,painting of entire piping as per supplied drawing as per instruction of EIC. Attachment of all pipe fittings like flanges, elbows, tees, reducers etc.to be counted as
5 1.5 NO 522.00 3304.80 17,25,105.60
4" PIPING/VALVE per no of welding joints of respective pipe dia size. The above includes supply & fixing of nuts, stud bolts & sprial wound metallic gaskets for flanges, suitable for ANSI
CLASS 300 as per work rquirement. The above also includes the transportation of material from stores to the various sites. The fabrication & installation will be required
for the following pipe sizes --do--,4"
Fabrication, Erection & Installation of piping, valves in new CNG/FRS/DRS/MRS stations: The work will involve mainly : Handling of pipes, edge preparation by grinding
& honing of pipes, beveling,U.T, aligning, fit-up, cold cutting, welding as per API1104/ASME Section-VIII & IX,D.P test, 100% radiography, hydtro-testing,
FAB/ERECT-
dewatering,painting of entire piping as per supplied drawing as per instruction of EIC. Attachment of all pipe fittings like flanges, elbows, tees, reducers etc.to be counted as
6 1.6 U/G,A/G 6" NO 16.00 4644.00 74,304.00
per no of welding joints of respective pipe dia size. The above includes supply & fixing of nuts, stud bolts & sprial wound metallic gaskets for flanges, suitable for ANSI
PIPING
CLASS 300 as per work rquirement. The above also includes the transportation of material from stores to the various sites. The fabrication & installation will be required
for the following pipe sizes --do--,6"
Fabrication, Erection & Installation of piping, valves in new CNG/FRS/DRS/MRS stations: The work will involve mainly : Handling of pipes, edge preparation by grinding
& honing of pipes, beveling,U.T, aligning, fit-up, cold cutting, welding as per API1104/ASME Section-VIII & IX,D.P test, 100% radiography, hydtro-testing,
FAB/ERECT- dewatering,painting of entire piping as per supplied drawing as per instruction of EIC. Attachment of all pipe fittings like flanges, elbows, tees, reducers etc.to be counted as
7 1.7 NO 20.00 5292.00 1,05,840.00
U/GA/G 8" PIPNG per no of welding joints of respective pipe dia size. The above includes supply & fixing of nuts, stud bolts & sprial wound metallic gaskets for flanges, suitable for ANSI
CLASS 300 as per work rquirement. The above also includes the transportation of material from stores to the various sites. The fabrication & installation will be required
for the following pipe sizes --do--,8"
Fabrication, Erection & Installation of piping, valves in new CNG/FRS/DRS/MRS stations: The work will involve mainly : Handling of pipes, edge preparation by grinding
& honing of pipes, beveling,U.T, aligning, fit-up, cold cutting, welding as per API1104/ASME Section-VIII & IX,D.P test, 100% radiography, hydtro-testing,
Fab/Erect/Modificat dewatering,painting of entire piping as per supplied drawing as per instruction of EIC. Attachment of all pipe fittings like flanges, elbows, tees, reducers etc.to be counted as
8 1.8 NO 16.00 7560.00 1,20,960.00
ion of 12" pipe, A/G per no of welding joints of respective pipe dia size. The above includes supply & fixing of nuts, stud bolts & sprial wound metallic gaskets for flanges, suitable for ANSI
CLASS 300 as per work rquirement. The above also includes the transportation of material from stores to the various sites. The fabrication & installation will be required
for the following pipe sizes --do--,12"
2 Welding of pipeline with Flange/Fitting
WELDING-1.5" CS
"Welding of the pipes with flanges including cutting, edge preparation, inclusive of cold cutting, grinding the edges of pipes, and flanges, DPT, 100% radiography of the
9 2.1 PIPE 1.5" NB NO 20.00 1377.00 27,540.00
weld joints and supply and installation of gaskets , studs and nuts. 1.5" NB
WITH FLANGE Digitally signed by
AJITESH AJITESH KUSHWAHAPage 2 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

Fabrication including cutting, edge preparation, inclusive of cutting, grinding the edges of pipes, flanges etc. to match with grinding the edges of pipes, flanges etc. to match
WELDING- with the matching edges of uneven / different thickness, preheating and cold cutting wherever required, welding, hydro-testing etc. including supply and fixing of all types
PIPE/FITTING/VA of gaskets (including gaskets for RTJ flanges), studs/bolts and nuts for all sizes. Carrying out Non-destructive testing as per specification & instruction of EIC Size 2" Scope
10 2.2 NO 434.00 1971.00 8,55,414.00
LVE TO FLANGE of work also includes receiving and taking over of all free issue materials from company's designated place of issue, handling including lifting, transportation from Owners
2" and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by
COMPANY / CONTRACTOR.

"Welding of the pipes with flanges including cutting, edge preparation, inclusive of grinding the edges of pipes and flanges,cold cutting wherever required, DPT, 100%
WELDING-3" CS
radiography,hydro-testing of the weld joints and supply and installation of gaskets , studs and nuts. Scope of work also includes receiving and taking over of all free issue
11 2.3 PIPE 3" NB WITH NO 20.00 2311.20 46,224.00
materials from company's designated place of issue, handling including lifting, transportation from Owners and / or contractors storage point to work site / workshop as
FLANGE
applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR.

Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, flanges etc. to match with grinding the edges of pipes, flanges etc. to match with the
WELDING- matching edges of uneven / different thickness, preheating and cold cutting wherever required, welding,hydro-testing etc. including supply and fixing of all types of gaskets
PIPE/FITTING/VA (including gaskets for RTJ flanges), studs/bolts and nuts for all sizes. Carrying out Non-destructive testing as per specification & instruction of EIC Size 4' Scope of work
12 2.4 NO 255.00 3137.40 8,00,037.00
LVE TO FLANGE also includes receiving and taking over of all free issue materials from company#s designated place of issue, handling including lifting, transportation from Owners and / or
4" contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by
COMPANY / CONTRACTOR.

Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, flanges etc. to match with grinding the edges of pipes, flanges etc. to match with the
WELDING- matching edges of uneven / different thickness, preheating and cold cutting wherever required, welding,hydro-testing etc. including supply and fixing of all types of gaskets
PIPE/FITTING/VA (including gaskets for RTJ flanges), studs/bolts and nuts for all sizes. Carrying out Non-destructive testing as per specification & instruction of EIC Size 6' Scope of work
13 2.5 NO 8.00 4050.00 32,400.00
LVE TO FLANGE also includes receiving and taking over of all free issue materials from company's designated place of issue, handling including lifting, transportation from Owners and / or
6" contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by
COMPANY / CONTRACTOR.

Fabrication including cold cutting, edge preparation, inclusive of grinding the edges of pipes, flanges etc. to match with grinding the edges of pipes, flanges etc. to match
WELDING- with the matching edges of uneven / different thickness, preheating and cold cutting wherever required, welding,hydro-testing etc. including supply and fixing of all types
PIPE/FITTING/VA of gaskets (including gaskets for RTJ flanges), bolts and nuts for all sizes. Carrying out Non-destructive testing as per specification & instruction of EIC Size 8' Scope of
14 2.6 NO 10.00 4914.00 49,140.00
LVE TO FLANGE work also includes receiving and taking over of all free issue materials from company#s designated place of issue, handling including lifting, transportation from Owners
8" and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by
COMPANY / CONTRACTOR.
Fabrication including cold cutting, edge preparation, inclusive of grinding the edges of pipes, flanges etc. to match with grinding the edges of pipes, flanges etc. to match
WELDING- with the matching edges of uneven / different thickness, preheating and cold cutting wherever required, welding,hydro-testing etc. including supply and fixing of all types of
PIPE/FITTING/VA gaskets (including gaskets for RTJ flanges), bolts and nuts for all sizes. Carrying out Non-destructive testing as per specification & instruction of EIC Size 12' Scope of
15 2.7 NO 4.00 7344.00 29,376.00
LVE TO FLANGE work also includes receiving and taking over of all free issue materials from company's designated place of issue, handling including lifting,transportation from Owners and
12 / or contractors storage point to work site /workshop as applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by
COMPANY / CONTRACTOR.
3 Hydrotesting of pipeline
ERECTION-1.5"
PIPE- Cleaning and flushing by water/compressor air testing of system including hydro test , drying with compressed air, erection of the pipeline , painting of the system including
16 3.1 M 10.00 621.00 6,210.00
FLUSHING,HYDR supply of paint as per specification. 1.5" NB
OTESTING

Digitally signed by
AJITESH AJITESH KUSHWAHAPage 3 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

ERECTION- HYDROTESTING PAINTING 2" Receiving and taking over of all free issue materials from company's designated place of issue, handling including lifting,
transportation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for
all piping items supplied by COMPANY / CONTRACTOR. Complete work of erection, painting, testing and making ready for further commissioning / start - up carbon
steel piping and fittings of all sizes and ratings including supply & installation of, all fittings like elbow, tees, reducers, swages, weldolet, sockolets, nipples, flanges, blind
flanges, spectacle blind flanges, valves, pipes of sizes of 2" NB and of all ratings including supply of all consumables, equipment, manpower and other resources and
execution of but not limited to the following works in accordance with relevant specifications, drawings, scope of work and instruction of Owner/ Owner's Representative
and as per all provisions of the contract document.Erection of pipes of all types and thickness over sleepers, overhead on rack and at all elevations, connecting with
ERECTION- equipment nozzle, aligning and installation for all types of valves, all online instruments and fittings of all sizes of elbow, reducers, tees, flanges blind flange, spectacle blind
17 3.2 HYDROTESTING flanges, branch connection /tapping, vents and drains, required for process and hydro testing, tapping for pressure gauges thermowells sample connections, etc. Painting of M 1303.00 891.00 11,60,973.00
PAINTING 2" entire system (including all pipes and accessories) as per specification, including supply of approved paints and primers, preparation of surface and application of primer
and paint, identification lettering/numbering,color coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by
COMPANY and providing scaffolding for all heights etc. Cleaning and flushing by water /compressed air, testing of the system including hydrostatic, pneumatic and any
other type of testing as specified, draining, drying by compressed air / other methods approved by COMPANY. Cleaning and flushing by water/ compressed air, testing of
the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/ other methods as approved by Owner.Completion
of all such work in all respect as per scope of work and as per drawings specifications and instructions of the COMPANY and keeping in the system ready in all respects for
further commissioning and start up.Hooking up with other system piping at battery limit.Preparation of isometric, fabrication drawings. Bill of materials as per
specifications, drawings and instruction of Owner/Owner's Representative.

ERECTION- HYDROTESTING PAINTING 3" Receiving and taking over of all free issue materials from company's designated place of issue, handling including lifting,
transportation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for
all piping items supplied by COMPANY / CONTRACTOR. Complete work of erection, painting, testing and making ready for further commissioning / start - up carbon
steel piping and fittings of all sizes and ratings including supply & installation of, all fittings like elbow, tees, reducers, swages, weldolet, sockolets, nipples, flanges, blind
flanges, spectacle blind flanges, valves, pipes of sizes of 3" NB and of all ratings including supply of all consumables, equipment, manpower and other resources and
execution of but not limited to the following works in accordance with relevant specifications, drawings, scope of work and instruction of Owner/ Owner's Representative
and as per all provisions of the contract document.Erection of pipes of all types and thickness over sleepers, overhead on rack and at all elevations, connecting with
ERECTION-3"
equipment nozzle, aligning and installation for all types of valves, all online instruments and fittings of all sizes of elbow, reducers, tees, flanges blind flange, spectacle blind
PIPE-
18 3.3 flanges, branch connection /tapping, vents and drains, required for process and hydro testing, tapping for pressure gauges thermowells sample connections, etc. Painting of M 40.00 891.00 35,640.00
FLUSHING,HYDR
entire system (including all pipes and accessories) as per specification, including supply of approved paints and primers, preparation of surface and application of primer
OTESTING
and paint, identification lettering/numbering,color coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by
COMPANY and providing scaffolding for all heights etc. Cleaning and flushing by water /compressed air, testing of the system including hydrostatic, pneumatic and any
other type of testing as specified, draining, drying by compressed air / other methods approved by COMPANY. Cleaning and flushing by water/ compressed air, testing of
the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/ other methods as approved by Owner.Completion
of all such work in all respect as per scope of work and as per drawings specifications and instructions of the COMPANY and keeping in the system ready in all respects for
further commissioning and start up.Hooking up with other system piping at battery limit.Preparation of isometric, fabrication drawings. Bill of materials as per
specifications, drawings and instruction of Owner/Owner's Representative.

Digitally signed by
AJITESH AJITESH KUSHWAHAPage 4 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

ERECTION- HYDROTESTING PAINTING 4" Receiving and taking over of all free issue materials from company's designated place of issue, handling including lifting,
transportation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for
all piping items supplied by COMPANY / CONTRACTOR. Complete work of erection, painting, testing and making ready for further commissioning / start - up carbon
steel piping and fittings of all sizes and ratings including supply & installation of, all fittings like elbow, tees, reducers, swages, weldolet, sockolets, nipples, flanges, blind
flanges, spectacle blind flanges, valves, pipes of sizes of 4''NB and of all ratings including supply of all consumables, equipment, manpower and other resources and
execution of but not limited to the following works in accordance with relevant specifications, drawings, scope of work and instruction of Owner/ Owner's Representative
and as per all provisions of the contract document. Erection of pipes of all types and thickness over sleepers, overhead on rack and at all elevations, connecting with
ERECTION- equipment nozzle, aligning and installation for all types of valves, all online instruments and fittings of all sizes of elbow,reducers, tees, flanges blind flange, spectacle blind
19 3.4 HYDROTESTING flanges, branch connection / tapping, vents and drains, required for process and hydro testing, tapping for pressure gauges thermowells sample connections, etc.Painting of M 517.00 1269.00 6,56,073.00
PAINTING 4" entire system (including all pipes and accessories) as per specification, including supply of approved paints and primers, preparation of surface and application of primer
and paint, identification lettering/numbering, color coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by
COMPANY and providing scaffolding for all heights etc. Cleaning and flushing by water /compressed air, testing of the system including hydrostatic, pneumatic and any
other type of testing as specified, draining, drying by compressed air / other methods approved by COMPANY. Cleaning and flushing by water/ compressed air, testing of
the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/ other methods as approved by Owner.
Completion of all such work in all respect as per scope of work and as per drawings specifications and instructions of the COMPANY and keeping in the system ready in all
respects for further commissioning and start up.Hooking up with other system piping at battery limit. Preparation of isometric, fabrication drgs. Bill of materials as per
specifications, drawings and instruction of Owner/Owner's Representative.

ERECTION- HYDROTESTING PAINTING 6" Receiving and taking over of all free issue materials from company's designated place of issue, handling including lifting,
transportation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for
all piping items supplied by COMPANY / CONTRACTOR. Complete work of erection, painting, testing and making ready for further commissioning / start - up carbon
steel piping and fittings of all sizes and ratings including supply & installation of, all fittings like elbow, tees, reducers, swages, weldolet, sockolets, nipples, flanges, blind
flanges, spectacle blind flanges, valves, pipes of sizes 6" NB and of all ratings including supply of all consumables, equipment, manpower and other resources and
execution of but not limited to the following works in accordance with relevant specifications, drawings, scope of work and instruction of Owner/ Owner's Representative
and as per all provisions of the contract document. Erection of pipes of all types and thickness over sleepers, overhead on rack and at all elevations, connecting with
ERECTION- equipment nozzle, aligning and installation for all types of valves, all online instruments and fittings of all sizes of elbow, reducers, tees, flanges blind flange, spectacle blind
20 3.5 HYDROTESTING flanges, branch connection / tapping, vents and drains, required for process and hydro testing, tapping for pressure gauges thermowells sample connections, etc.Painting of M 16.00 1458.00 23,328.00
PAINTING 6" entire system (including all pipes and accessories) as per specification, including supply of approved paints and primers, preparation of surface and application of primer
and paint, identification lettering/numbering, color coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by
COMPANY and providing scaffolding for all heights etc. Cleaning and flushing by water /compressed air, testing of the system including hydrostatic, pneumatic and any
other type of testing as specified, draining, drying by compressed air / other methods approved by COMPANY. Cleaning and flushing by water/ compressed air, testing of
the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/ other methods as approved by Owner.
Completion of all such work in all respect as per scope of work and as per drawings specifications and instructions of the COMPANY and keeping in the system ready in all
respects for further commissioning and start up.Hooking up with other system piping at battery limit. Preparation of isometric, fabrication drgs. Bill of materials as per
specifications, drawings and instruction of Owner/Owner#s Representative.

Digitally signed by
AJITESH AJITESH KUSHWAHAPage 5 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

ERECTION- HYDROTESTING PAINTING 8" Receiving and taking over of all free issue materials from company's designated place of issue, handling including lifting,
transportation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for
all piping items supplied by COMPANY / CONTRACTOR. Complete work of erection, painting, testing and making ready for further commissioning / start - up carbon
steel piping and fittings of all sizes and ratings including supply & installation of, all fittings like elbow, tees, reducers, swages, weldolet, sockolets, nipples, flanges, blind
flanges, spectacle blind flanges, valves, pipes of sizes 8" NB and of all ratings including supply of all consumables, equipment, manpower and other resources and execution
of but not limited to the following works in accordance with relevant specifications, drawings, scope of work and instruction of Owner/ Owner's Representative and as per
all provisions of the contract document.Erection of pipes of all types and thickness over sleepers, overhead on rack and at all elevations, connecting with equipment nozzle,
ERECTION- aligning and installation for all types of valves, all online instruments and fittings of all sizes of elbow, reducers, tees, flanges blind flange, spectacle blind flanges, branch
21 3.6 HYDROTESTING connection / tapping, vents and drains, required for process and hydro testing, tapping for pressure gauges thermowells sample connections, etc. Painting of entire system M 20.00 1728.00 34,560.00
PAINTING 8" (including all pipes and accessories) as per specification, including supply of approved paints and primers, preparation of surface and application of primer and paint,
identification lettering/numbering, color coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by
COMPANY and providing scaffolding for all heights etc. Cleaning and flushing by water /compressed air, testing of the system including hydrostatic, pneumatic and any
other type of testing as specified, draining, drying by compressed air / other methods approved by COMPANY. Cleaning and flushing by water/ compressed air, testing of
the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/ other methods as approved by Owner.
Completion of all such work in all respect as per scope of work and as per drawings specifications and instructions of the COMPANY and keeping in the system ready in all
respects for further commissioning and start up. Hooking up with other system piping at battery limit. Preparation of isometric, fabrication drgs. Bill of materials as per
specifications, drawings and instruction of Owner/Owner's Representative.

ERECTION- HYDROTESTING PAINTING 12" Receiving and taking over of all free issue materials from company's designated place of issue, handling including lifting,
transportation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for
all piping items supplied by COMPANY / CONTRACTOR. Complete work of erection, painting, testing and making ready for further commissioning / start - up carbon
steel piping and fittings of all sizes and ratings including supply & installation of, all fittings like elbow, tees, reducers, swages, weldolet, sockolets, nipples, flanges, blind
flanges, spectacle blind flanges, valves, pipes of sizes below 12" NB and of all ratings including supply of all consumables, equipment, manpower and other resources and
execution of but not limited to the following works in accordance with relevant specifications,
drawings, scope of work and instruction of Owner/ Owner's Representative and as per all provisions of the contract document. Erection of pipes of all types and thickness
ERECTION- over sleepers, overhead on rack and at all elevations, connecting with equipment nozzle, aligning and installation for all types of valves, all online instruments and fittings of
22 3.7 HYDROTESTING all sizes of elbow, reducers, tees, flanges blind flange, spectacle blind flanges, branch connection / tapping, vents and drains, required for process and hydro testing, tapping M 16.00 2376.00 38,016.00
PAINTING 12" for pressure gauges thermowells sample connections, etc. Painting of entire system (including all pipes and accessories) as per specification, including supply of approved
paints and primers, preparation of surface and application of primer and paint, identification lettering/numbering, color coding, etc. as specified including rub down & touch
up of shop primer or scrapping of shop primer wherever required by COMPANY and providing scaffolding for all heights etc. Cleaning and flushing by water /compressed
air, testing of the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air / other methods approved by
COMPANY. Cleaning and flushing by water/ compressed air, testing of the system including hydrostatic, pneumatic and any other type of testing as specified, draining,
drying by compressed air/ other methods as approved by Owner. Completion of all such work in all respect as per scope of work and as per drawings specifications and
instructions of the COMPANY and keeping in the system ready in all respects for further commissioning and start up.Hooking up with other system piping at battery limit.
Preparation of isometric, fabrication drgs. Bill of materials as per specifications, drawings and instruction of Owner/Owner's Representative.

4 Stud Replacement
REPLACEMENT
OF HIGHT REPLACEMENT OF HIGHT TENSILE GALVANISED STUD OF 16X100MM FOR 2" FLANGES Supply and installation for the replacement of high tensile stud of
23 4.1 NO 1374.00 113.40 1,55,811.60
TENSILE STUD 16x100mm for 2" flanges as required on site.
OF 16X
REPLACEMENT
OF HIGHT REPLACEMENT OF HIGHT TENSILE GALVANISED STUD OF 18X120MM FOR 4" FLANGES Supply and installation for the replacement of high tensile stud of
24 4.2 NO 1044.00 140.40 1,46,577.60
TENSILE STUD 18x120mm for 4" flanges as required on site.
OF 18X

Digitally signed by
AJITESH AJITESH KUSHWAHAPage 6 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

REPLACEMENT
OF HIGHT REPLACEMENT OF HIGHT TENSILE GALVANISED STUD OF 20X140MM FOR 6" FLANGES Supply and installation for the replacement of high tensile stud of
25 4.3 NO 64.00 159.30 10,195.20
TENSILE STUD 20x140mm for 6" flanges as required on site.
OF 20X
5 Replacement of Above Ground Valve
Receiving and taking over the valves from IGL's store and replace the valve with damaged/ passed valves including hydrotesting of valve as per approved procedure, supply
REPLACEMENT-
26 5.1 and installation of new metallic gaskets, new stud bolts of proper rating and new copper jumper of 1" width and 3 mm thick mat finished on each pair of flange for the NO 1.00 10195.20 10,195.20
2" NB A/G VALVE
valve#2'' NB
Receiving and taking over the valves from IGL's store and replace the valve with damaged/ passed valves including hydrotesting of valve as per approved procedure, supply
REPLACEMENT-
27 5.2 and installation of new metallic gaskets, new stud bolts of proper rating and new copper jumper of 1" width and 3 mm thick mat finished on each pair of flange for the NO 8.00 17820.00 1,42,560.00
3" NB A/G VALVE
valve#3'' NB
Receiving and taking over the valves from IGL's store and replace the valve with damaged/ passed valves including hydrotesting of valve as per approved procedure, supply
REPLACEMENT-
28 5.3 and installation of new metallic gaskets, new stud bolts of proper rating and new copper jumper of 1" width and 3 mm thick mat finished on each pair of flange for the NO 19.00 20250.00 3,84,750.00
4" NB A/G VALVE
valve#4'' NB
Receiving and taking over the valves from IGL's store and replace the valve with damaged/ passed valves including hydrotesting of valve as per approved procedure, supply
REPLACEMENT-
29 5.4 and installation of new metallic gaskets, new stud bolts of proper rating and new copper jumper of 1" width and 3 mm thick mat finished on each pair of flange for the NO 10.00 29160.00 2,91,600.00
6" NB A/G VALVE
valve#6'' NB
Receiving and taking over the valves from IGL's store and replace the valve with damaged/ passed valves including hydrotesting of valve as per approved procedure, supply
REPLACEMENT-
30 5.5 and installation of new metallic gaskets, new stud bolts of proper rating and new copper jumper of 1" width and 3 mm thick mat finished on each pair of flange for the NO 10.00 32400.00 3,24,000.00
8" NB A/G VALVE
valve#8'' NB
6 Replacement of Metallic gasket
REPLACEMENT-
METALLIC
31 6.1 Supply and installation of new spiral wound metallic gaskets for the valve/Flange #1.5'' NB NO 10.00 162.00 1,620.00
GASKET1.5"NBFL
NGE
REPLACEMENT-
METALLIC
32 6.2 Supply and installation of new spiral wound metallic gaskets for the valve/Flange #2'' NB NO 171.00 361.80 61,867.80
GASKET 2"NB
FLNGE
REPLACEMENT-
METALLIC
33 6.3 Supply and installation of new spiral wound metallic gaskets for the valve/Flange #3'' NB NO 20.00 286.20 5,724.00
GASKET 3"NB
FLNGE
REPLACEMENT-
METALLIC
34 6.4 Supply and installation of new spiral wound metallic gaskets for the valve/Flange #4'' NB NO 129.00 599.40 77,322.60
GASKET 4"NB
FLNGE
REPLACEMENT-
METALLIC
35 6.5 Supply and installation of new spiral wound metallic gaskets for the valve/Flange #6'' NB NO 20.00 577.80 11,556.00
GASKET 6"NB
FLNGE
REPLACEMENT-
METALLIC
36 6.6 Supply and installation of new spiral wound metallic gaskets for the valve/Flange #8'' NB NO 20.00 766.80 15,336.00
GASKET 8"NB
FLNGE
7 Pipeline Support Installation
SUPL/INSTL-
supply, fabrication and installation /grouting of box type supports (with C -type garter of thickness 4.5 mm min.) of size up to 300 mm as per the specification along with
37 7.1 SUPPORTS(<300 NO 165.00 1296.00 2,13,840.00
4mm rubber padding on top plate and 8 mm U-clamp with rubber grip at regular interval as per engineer in charge and as per enclosed drawing
MM)
SUPL/INSTL-
supply, fabrication and installation /grouting of box type supports (with C -type garter of thickness 4.5 mm min.) of size up to 600 mm as per the specification along with
38 7.2 SUPPORTS(>300 NO 77.00 1566.00 1,20,582.00
4mm rubber padding on top plate and 8 mm U-clamp with rubber grip at regular interval as per engineer in charge and as per enclosed drawing
&<600MM)
Digitally signed by
AJITESH AJITESH KUSHWAHAPage 7 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

SUPL/INSTL-
supply, fabrication and installation /grouting of box type supports (with C -type garter of thickness 4.5 mm min.) of size up to 1000 mm as per the specification along with
39 7.3 SUPPORTS(>600 NO 53.00 1890.00 1,00,170.00
4mm rubber padding on top plate and 8 mm U-clamp with rubber grip at regular interval as per engineer in charge and as per enclosed drawing.
&<1000MM)
U-CLAMP WITH SUPPLY AND INSTALLATION OF U-CLAMP WITH PVC INSULATION Supply and installation of U-clamp of with PVC insulation: Supply and installation U-clamp
40 7.4 NO 177.00 62.10 10,991.70
PVC INSULATION with rubber grip(min 4mm thickness) at the required location in various Supports as required on site as per the required standards.
NEOPRENE
RUBBER SUPPLY AND INSTALLATION OF NEOPRENE RUBBER PADDING ON PIPE SUPPORT Supply and installation of required Neoprene rubber padding (min 4mm
41 7.5 NO 120.00 140.40 16,848.00
PADDING ON thickness)where ever required on the installed support in above ground piping or as required on site.
PIPE SUPPORT
8 Fencing/Gate installation
SUPPLY/EREC-
Supply of erection of single leaf mild steel gate 2.5m high with mesh upto 2m height and barbed wire fencing and 2m wide complete in all respect including painting as per
42 8.1 MILD STEEL NO 10.00 26144.26 2,61,442.60
TS on all MS items, all works as per specification and drawings excluding foundations and RCC beams.
GATE

Supply and erection of double leaf mild steel gate 2.5 m high with mesh up to 2m height and barbed wire fencing and 4 m wide complete in all respect including painting as
SUPPLY/EREC- per TS on all MS items , all works as per specification and drawings excluding foundations and RCC. " Rate to include cost of all labour, tools , tackles, equipment , hire
43 8.2 DOUBLE LEAF charges , supply of all materials such as minimum 43 grade cement including sulphate resistant cement for sub structures , R/F steel, inserts , bolts , conduits , bitumen , NO 10.00 31535.11 3,15,351.10
STEEL GATE other minor construction materials , shuttering, stinging, earthwork in excavation and backfilling using serviceable earth in all conditions , shorting bailing and pumping out
water , testing of concrete , curing etc. with all bye works and sundry works. "

Supply of all materials, fabrication and erection of chain link fencing 2.5m high with mesh up to 2m height and barbed wire fenching complete in all respects including
SUPPLY/FAB/ERE painting as per TS on all MS items, all works as per specification and drawings excluding foundation and RCC beams. Rate to include cost of all labour, tools, tackles,
44 8.3 C- CHAIN LINK equipment, hire charges, supply of all maerials such as minimum 43 grade cement including sulphate resistant cement for sub-structures, R/F steel, Inserts, bolts, conduits, MR 10.00 3357.43 33,574.30
FENCING bitumen, other minor constrcution materials, shuttering, stanging, earthwork in excavation and backfilling using serviceable earth in all conditions, shorting bailing and
pumping out water, testing of concrete, curing etc. with all bye works and syndry works.

Supply, installtion & Erection of Steel. This includes supply of steel, fixing of bolts,nuts,washer including steel work using welded in built section / framed work, including
SUPPLY/INSTAL/
cutting, hoisting, fixing in position & applying primers & painting with ready mixed paint of approved brand & manufacturer; using structural steel like angles, I- section
45 8.4 ERECTION- KG 1000.00 97.57 97,570.00
channels, chequred-plates etc. as required, in grating, frames, guard bar, ladders, railings, brackets, gates crossovers working platforms & similar works. The above also
STEEL
includes providing supports for piping / valves/skid.

9 Other Miscellaneous services


MODIFICATION- MODIFICATION-CUTING & BEVELING OF PIPING/PIPE FITTINGS/FLANGES Modification-Cutting & Bevelling of Piping/Pipe Fittings/Flanges Modification on
46 9.1 CUTING&BEVELI existing weld joints/pipes/valves/fittings/Flanges etc., including cutting, bevelling and edge preparation, grinding the edges of pipes, fittings, etc. including Non-destructive " 435.00 1584.67 6,89,331.45
NG OF PIPING testing as per tender specification & instruction of EIC.

Transportation including Loading, unloading, handling of all piping items from Owner's and/ or Contractor's storage point to work at site/ workshop as applicable, complete
work of fabrication, erection, painting, testing of pipes, flanges and fittings and making ready for further Commissioning / Start-up of carbon steel piping spools of all sizes
and ratings including supply of all consumables, equipment, manpower and other resources and execution, but not limited to, the following works in accordance with
ATTEND/REPAIR-
relevant specifications indicated and as per instructions of Engineer-in-charge.The quoted rate to include MPT/UT/thickness check required to be carried out on bevel/cut
47 9.2 EMERGENCY " 261.00 2394.67 6,25,008.87
pipes prior to fitup. All resources like manpower cranage ,trucks/trailers ,consumables tools tackles etc. are included in the rate. The pipe sizes are as follows. 18" 16" , 12",
LEAK
8" , 6" & 4".The rate also includes carrying out Non-destructive testing of Welds as per approved QAP & Specifications.MUT of faces of Pipes/ Fittings after cutting &
grinding of bewelled edges prior to carryout the welding work. All the relevent applicable activities for the completion of Attend/Repair - Emergency Leak though not
mentioned in the tender documents

COATING ON
EXPOSED
SUPPLY AND INSTALLATION OF COATING ON EXPOSED PIPELINE BY COLD TAPE / COATING SLEEVES Supply and installation of required coating on above
48 9.3 PIPELINE COLD M2 44.00 2403.00 1,05,732.00
ground piping or in underground piping either by cold tape or by coating sleeves as required on site.
TAPE / COATING
SLEEVES

Digitally signed by
AJITESH AJITESH KUSHWAHAPage 8 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

PAINTING-
ABOVE GROUND
49 9.4 Painting of above ground piping as per scope of work and as per instructions of EIC. M2 174.00 291.60 50,738.40
PIPING-VALVE
PIT
SUPPLY &
Supply of SS pressure gauges ( Make- Wari)as per Data Sheet and enclosed drawing and Installation of pressure Gauges and their accessories inclusive of supply of
INSTALL. OF SS
50 9.5 necessary piping materials and tubings alongwith all necessary valves & fittings, fabrication and installation of impulse lines/manifolds & hydraulic testing and calibration NO 26.00 6629.19 1,72,358.94
PRESSURE
as per installation standard.It includes caliberation certificate, caliberation tag and other required documents whichever required on site.
GUAGE
PRESSURE
PRESSURE GAUGE CALIBRATION Execution of pressure gauge calibration on site as required and to submit the calibration certificate duration of the calibrated period
51 9.6 GAUGE NO 152.00 1134.00 1,72,368.00
as per by the company policy for the period of one year duration and to provide calibration tag on the each gauge.
CALIBRATION
INSTALLATION
52 9.7 OF JUMPERS,ON supply and installation of new copper jumper of 1" width and 3 mm thick mat finished on each pair of flange. NO 1304.00 410.40 5,35,161.60
OLD FLANGE
Mobilization Transportation including Loading, unloading, handling of all piping items from Owner's and/ or Contractor's storage point to work at site/ workshop as applicable, All
53 9.8 NO 21.00 21861.80 4,59,097.80
against repair items resources like manpower cranage ,trucks/trailers ,consumables tools tackles etc. are included in the rate.
PURGING-
INCLUDING Supply of nitrogen cylinder (7 meter cube each) and making the arrangment for purging including the supply of equipment and fittings of all size for nitrogen purging and
54 9.9 NO 1716.00 1277.42 21,92,052.72
SUPPLY OF providing the commissiong assistance.
NITROGEN
SS TUBING
SS TUBING MODIFICATION WORK WITHOUT REQUIRED FITTINGS Receiving and taking over of all company supplied material from company'sdesignated place
55 9.10 MODIFICATION M 26.00 4077.00 1,06,002.00
of issue , transportation, from owner store to work site for the modification work of SS tubing or for attending emergency leakages from SS tubings /fittings as required.
WORK
INSTALLATION- Receiving and taking over the strainer from IGL's store, hydrotesting of strainer as per approved procedure, supply and installation of new metallic gaskets, new stud bolts
56 9.11 NO 9.00 7560.00 68,040.00
4"NB STRAINER of proper rating and new copper jumper of 1" width and 3 mm thick mat finished on each pair of flange for the Strainer #4'' NB
10 Power Pack Cold Cutting Of Pipeline
HIRING-COLD Mobilisation & Demobilisation of Hydraulic Powered Portable Low clearance Split Frame Machine at designated site in NCT of Delhi and NCR for cutting and beveling 4" -
CUTTING 6" diameter pipe, complete with Rotating Ring Set, Jaw self -Squaring Chucking System Extension Legs, Extended parting Tool Slide, Extended Beveling tool, Slide Star
57 10.1 MND 6.00 62008.52 3,72,051.12
SERVICES 4"-6" wheel Feed Mechanism, Right Angle Hydraulic Drive, Operating Hand Tools, Storage Case and Manual including all consumables(Incl parting and beveling cutter) tool and
DIA tackles Mobilisation, Demobilisation including travelling, Boarding and lodging Charges of Engineer / Technician/operator complete in all respect

HIRING-COLD Mobilisation & Demobilisation of Hydraulic Powered Portable Low clearance Split Frame Machine at designated site in NCT of Delhi and NCR for cutting and bevelling 8"-
CUTTING 18" diameter pipe, complete with Rotating Ring Set, Jaw self -Squaring Chucking System Extension Legs, Extended parting Tool Slide, Extended Bevelling tool, Slide Star
58 10.2 MND 6.00 63610.23 3,81,661.38
SERVICES 8"-18" wheel Feed Mechanism, Right Angle Hydraulic Drive, Operating Hand Tools, Storage Case and Manual including all consumables(Incl parting and bevelling cutter) tool
DIA and tackles, Mobilisation, Demobilisation including travelling, Boarding and lodging Charges of Engineer / Technician/operator complete in all respect .
HIRING-POWER Mobilisation & Demobilisation of 14-19 H.P. Diesel Engine Driven Hydraulic Cart Mounted Power Unit, with Electric Start, Spark Arrestor, and Oil Cooler rated for 14
59 10.3 PACK UP FOR GPM at 1500 PSI at designated site in NCT of Delhi and NCR for cutting and beveling steel pipeline including all consumables(diesel etc.), tool and tackles complete in all MND 10.00 45808.52 4,58,085.20
COLD CUTTING respect .
11 Route Marker Installation

SUPL/INSTL- "PERMANENT MARKERS#Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in
PERMANENT all types of soil, construction in all types of soil, construction of pedestals and grouting with concrerte, clearing, supply and application of approved colour and quality of
60 11.1 NO 20.00 4331.36 86,627.20
MARKER primer and paint, stencil letter cutting for numbers, direction, chainage etc., restoration of area to original condition and performing all works as per enclosed drawing,
WARNING SIGN specification and instruction of engineer-in-charge.#warning sign with Post & foundations as per enclosed Drawing"

SUPL/INSTL- "PERMANENT MARKERS#Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in
PERMANENT/ all types of soil, construction in all types of soil, construction of pedestals and grouting with concrerte, clearing, supply and application of approved colour and quality of
61 11.2 NO 20.00 867.75 17,355.00
RCC/STONE primer and paint, stencil letter cutting for numbers, direction , chainage etc., restoration of area to original condition and performing all works as per enclosed drawing,
ROUTE MARKER specification and instruction of engineer-in-charge.#RCC route marker as per drawing"
Digitally signed by
AJITESH AJITESH KUSHWAHAPage 9 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

12 Pit Excavation and Backfilling


EXCAVATION-
EARTH INCL Earth work in excavation including breaking of concrete slab , pavement etc.and backfilling and compaction with the excavated earth after work is completion. It Includes
62 12.1 M3 14.00 1992.51 27,895.14
BREAKING any liasoning with authorities
CONCRETE
EXCAVATION-
EARTH WORK
63 12.2 Earth work in excavation in kacha portion etc.and backfilling and compaction with the excavated earth after work is completion.It Includes any liasoning with authorities M3 61.00 1523.67 92,943.87
(KACCHA
PORTION)
EXCAVATION- Excavation of hard rock, wherever hard rock of single piece exceeding 1.5 m in any direction and removable only by pneumatic chisel / drill as per the specifications and
64 12.3 M3 26.00 3016.68 78,433.68
HARD ROCK direction of EIC. The rates are payable over and above the Laying rates as per relevant SOR Items.

Supplying and laying plain cement concrete (including shuttering of required) in all types of concrete works including levelling courses below foundation, substructure,
CIVIL WORKS - superstrcuture, chambers, cable tranch, under floors and any other locations, at all leveies as per drawings, specifications and directions of the Engineer-in-charge. PCC
65 12.4 M3 50.00 6415.02 3,20,751.00
PCC 1:2:4 1:2:4 1 Cement : 2 Coarse sand : 4 stone aggregate 20mm nominal size. (Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials,
shuttering, earthwork in excavation and backfilling using approved earth in all conditions etc. with all bye works and sundry works.).

PROVIDING/LAYI .Providing & Laying of PCC of 1:3:6 (1 cement ;3 coarse sand ; 6 aggregate 40 mm nominal size) including the cost of centering & shuttering but excluding the cost of
66 12.5 M3 50.00 5660.85 2,83,042.50
NG- PCC OF 1:3:6 reinforcement.

Providing and laying REINFORCED CEMENT CONCRETE OF M-20 Grade , with 20 mm & down size graded crushed stone aggregates/ gravel in SUB-STRUCTURE of
PROV/LAYING- all types e.g. foundations, rafts, beams, slabs, pile caps, retaining walls, jambs, counter-forts, buttresses , trenches, manholes, pipe encasement, catch pits, drains, RCC pits,
67 12.6 RCC M-20 GRADE equipment foundations, pedestals, columns, pavements, suspended floors, brackets etc. (including single pour concreting upto 50 Cu. m. ) providing pockets, openings, M3 6.00 11694.21 70,165.26
IN SUB-STRUC recesses, chamfering, etc. vibrating, tamping, curing (Excluding the cost of REINFORCEMENT and SHUTTERING) for all depths below and upto plinth level in any
shape, position and thickness etc. all complete as specified, shown and directed.

CONST-BRICK
All civil works including supply of all material, excavation of pit, piping & valve supports including all PCC and RCC/ Brick works for valves pit, pedestals with insert
VALVE
68 12.7 plates as required sealing of pipe at valve pits, providing cover etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid NO 6.00 48508.52 2,91,051.12
CHAMBER,SIZE
any local flooding of area, as per specification enclosed and instruction of Engineer-in-Charge.
2.0MX2.0M
CONST-RCC
All civil works including supply of all material, excavation of pit, piping & valve supports including all PCC and RCC/ Brick works for valves pit, pedestals with insert
VALVE
69 12.8 plates as required sealing of pipe at valve pits, providing cover etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid NO 6.00 78117.04 4,68,702.24
CHAMBER,SIZE
any local flooding of area, as per specification enclosed and instruction of Engineer-in-Charge.
2.0MX2.0M
FILLING-EARTH Earth work in filling with good quality imported earth soil from approved source in layers of thickness not exceeding 15cms and compacted up to 90% to its MDD up to 4 m
70 12.9 WORK FROM depth and any plan dimension including all testing, compaction/rolling, watering etc. complete in all respect as per scope of work, detailed construction drawings , as per M3 26.00 2020.43 52,531.18
IMPORTED SOIL technical specifications and directions of the Engineer-in-charge.
13 Pipeline laying by Open Cut Method for repair of Pipeline
LIASON P/L
PERMISSIONS
71 13.1 Applying permissions, follow up and getting permission from the statutory authorities shall be in contractor's scope, only R.R.charges shall be paid by Owner. M 500.00 56.05 28,025.00
FROM STAT.
AUTH

Digitally signed by
AJITESH AJITESH KUSHWAHA
Page 10 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

Recieving and taking-over of 4'' NB line pipe from the IGL designated store in Delhi and shifting the same to site, handling, loading, transportation and unloading of Owner
supplied 3 - Layer PE coated linespipes along with associated fittings etc. transporation of Owner supplied materials other than linepipe from Owner's designatd place(s) of
issue to work site, arrangement of all additional lands required for Contractor;s storage, fabrication, access for construction, procurement and staking and installation of
construction markers, cleaning, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory / environment authorities to the entire satisfaction of
concerned authorities, grading of work area.the welding shall be carried out as per pipeline specifications and existing approved procedures , 100% radiography shall be
carried out of all joints. Trenching to all depths by excavation in all types of soils including soft/hard rock, chiselling or otherwise cutting different types of pavement,
footpath, roads tec. As required. And storing excavated soil, reusable materials at designated area as direction of owner. Minimum pipeline cover should be 1.2 meter and
the same should be checked during lowering Carrying out repairs of pipe defects/replacement in case of irreparable defects and repairs of defects of pipe coating not
attributable to Owner including defects / damages occurring during transportation/ handling including supply of coating material Checking, cleaning, aligning, bending,
cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required
LAYING-4" CS NB including 100% radiography; carrying out installation of carrier pipe at all crossings like roads/nallas at designated depths by open cut/jacking/boring (except at cased
72 13.2 M 100.00 1843.87 1,84,387.00
PIPELINE crossings or crossings carried out by HDD method); carrying out installation of carrier pipe in the casing pipe at cased crossings (excluding installation of casing pipes
which is covered separately). Coating of field weld joints, long radius elbows, buried fittings and valves etc. including supply of coating materials etc. Installation lowering
the pipeline in trench to required depth, placement of PE/PVC warning mat over the pipeline along the complete route, padding around pipeline with suitable approved soil
including supply of padding material, PE/PVC warning mat, backfilling. Supply and installation of slope breakers, bank protection wherever required and as directed by
Engineer incharge. Carrying out air cleaning, pigging, flushing, cleaning , 24 hours hydrostatic testing and swabbing of complete pipeline as per under ground pipeline
specifications. The all equipments required for grading,stringing, lowering, coating, welding , testing, backfilling shall be in contractors scope. All tie-in, including the tie-ins
with adjacent section of the pipeline. Joint coating of joint by heat shrinkable sleeves including supply of sleeves and showing the holiday test as per specifications and
coating of fittings with cold applied tape including supply of cold applied tape and showing the holiday test as per specifications. Final clean - up and restoration of right -of -
use and disposal of debris and surplus material to designated disposal areas and re-instating the area to its earlier state and as directed by Engineer -in Charge. Preparation
of as-built drawings, pipe-books (1 set of tracing on polyster film and 6 sets of as - built drawings and 1 soft copy and 6 copies of pipe book.) All the works shall be
executed in accordance with the provision of contract and pipeline specifications and as per instruction of Engineer -in -charge/ owner.

Recieving and taking-over of 6'' NB line pipe from the IGL designated store in Delhi and shifting the same to site, handling, loading, transportation and unloading of Owner
supplied 3 - Layer PE coated linespipes along with associated fittings etc. transporation of Owner supplied materials other than linepipe from Owner's designatd place(s) of
issue to work site, arrangement of all additional lands required for Contractor;s storage, fabrication, access for construction, procurement and staking and installation of
construction markers, cleaning, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory / environment authorities to the entire satisfaction of
concerned authorities, grading of work area.the welding shall be carried out as per pipeline specifications and existing approved procedures , 100% radiography shall be
carried out of all joints. Trenching to all depths by excavation in all types of soils including soft/hard rock, chiselling or otherwise cutting different types of pavement,
footpath, roads tec. As required. And storing excavated soil, reusable materials at designated area as direction of owner. Minimum pipeline cover should be 1.2 meter and
the same should be checked during lowering Carrying out repairs of pipe defects/replacement in case of irreparable defects and repairs of defects of pipe coating not
attributable to Owner including defects / damages occurring during transportation/ handling including supply of coating material Checking, cleaning, aligning, bending,
cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required
LAYING-6" CS NB including 100% radiography; carrying out installation of carrier pipe at all crossings like roads/nallas at designated depths by open cut/jacking/boring (except at cased
73 13.3 M 100.00 2317.43 2,31,743.00
PIPELINE crossings or crossings carried out by HDD method); carrying out installation of carrier pipe in the casing pipe at cased crossings (excluding installation of casing pipes
which is covered separately). Coating of field weld joints, long radius elbows, buried fittings and valves etc. including supply of coating materials etc. Installation lowering
the pipeline in trench to required depth, placement of PE/PVC warning mat over the pipeline along the complete route, padding around pipeline with suitable approved soil
including supply of padding material, PE/PVC warning mat, backfilling. Supply and installation of slope breakers, bank protection wherever required and as directed by
Engineer incharge. Carrying out air cleaning, pigging, flushing, cleaning , 24 hours hydrostatic testing and swabbing of complete pipeline as per under ground pipeline
specifications. The all equipments required for grading,stringing, lowering, coating, welding , testing, backfilling shall be in contractors scope. All tie-in, including the tie-ins
with adjacent section of the pipeline. Joint coating of joint by heat shrinkable sleeves including supply of sleeves and showing the holiday test as per specifications and
coating of fittings with cold applied tape including supply of cold applied tape and showing the holiday test as per specifications. Final clean - up and restoration of right -of -
use and disposal of debris and surplus material to designated disposal areas and re-instating the area to its earlier state and as directed by Engineer -in Charge. Preparation
of as-built drawings, pipe-books (1 set of tracing on polyster film and 6 sets of as - built drawings and 1 soft copy and 6 copies of pipe book.) All the works shall be
executed in accordance with the provision of contract and pipeline specifications and as per instruction of Engineer -in -charge/ owner.

Digitally signed by
AJITESH AJITESH KUSHWAHA
Page 11 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

Recieving and taking-over of 8'' NB line pipe from the IGL designated store in Delhi and shifting the same to site, handling, loading, transportation and unloading of Owner
supplied 3 - Layer PE coated linespipes along with associated fittings etc. transporation of Owner supplied materials other than linepipe from Owner's designatd place(s) of
issue to work site, arrangement of all additional lands required for Contractor;s storage, fabrication, access for construction, procurement and staking and installation of
construction markers, cleaning, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory / environment authorities to the entire satisfaction of
concerned authorities, grading of work area.the welding shall be carried out as per pipeline specifications and existing approved procedures , 100% radiography shall be
carried out of all joints. Trenching to all depths by excavation in all types of soils including soft/hard rock, chiselling or otherwise cutting different types of pavement,
footpath, roads tec. As required. And storing excavated soil, reusable materials at designated area as direction of owner. Minimum pipeline cover should be 1.2 meter and
the same should be checked during lowering Carrying out repairs of pipe defects/replacement in case of irreparable defects and repairs of defects of pipe coating not
attributable to Owner including defects / damages occurring during transportation/ handling including supply of coating material Checking, cleaning, aligning, bending,
cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required
LAYING-8" CS NB including 100% radiography; carrying out installation of carrier pipe at all crossings like roads/nallas at designated depths by open cut/jacking/boring (except at cased
74 13.4 M 100.00 2479.06 2,47,906.00
PIPELINE crossings or crossings carried out by HDD method); carrying out installation of carrier pipe in the casing pipe at cased crossings (excluding installation of casing pipes
which is covered separately). Coating of field weld joints, long radius elbows, buried fittings and valves etc. including supply of coating materials etc. Installation lowering
the pipeline in trench to required depth, placement of PE/PVC warning mat over the pipeline along the complete route, padding around pipeline with suitable approved soil
including supply of padding material, PE/PVC warning mat, backfilling. Supply and installation of slope breakers, bank protection wherever required and as directed by
Engineer incharge. Carrying out air cleaning, pigging, flushing, cleaning , 24 hours hydrostatic testing and swabbing of complete pipeline as per under ground pipeline
specifications. The all equipments required for grading,stringing, lowering, coating, welding , testing, backfilling shall be in contractors scope. All tie-in, including the tie-ins
with adjacent section of the pipeline. Joint coating of joint by heat shrinkable sleeves including supply of sleeves and showing the holiday test as per specifications and
coating of fittings with cold applied tape including supply of cold applied tape and showing the holiday test as per specifications. Final clean - up and restoration of right -of -
use and disposal of debris and surplus material to designated disposal areas and re-instating the area to its earlier state and as directed by Engineer -in Charge. Preparation
of as-built drawings, pipe-books (1 set of tracing on polyster film and 6 sets of as - built drawings and 1 soft copy and 6 copies of pipe book.) All the works shall be
executed in accordance with the provision of contract and pipeline specifications and as per instruction of Engineer -in -charge/ owner.

Recieving and taking-over of 12'' NB line pipe from the IGL designated store in Delhi and shifting the same to site, handling, loading, transportation and unloading of
Owner supplied 3 - Layer PE coated linespipes along with associated fittings etc. transporation of Owner supplied materials other than linepipe from Owner's designatd
place(s) of issue to work site, arrangement of all additional lands required for Contractor;s storage, fabrication, access for construction, procurement and staking and
installation of construction markers, cleaning, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory / environment authorities to the entire
satisfaction of concerned authorities, grading of work area.the welding shall be carried out as per pipeline specifications and existing approved procedures , 100%
radiography shall be carried out of all joints. Trenching to all depths by excavation in all types of soils including soft/hard rock, chiselling or otherwise cutting different
types of pavement, footpath, roads tec. As required. And storing excavated soil, reusable materials at designated area as direction of owner. Minimum pipeline cover should
be 1.2 meter and the same should be checked during lowering Carrying out repairs of pipe defects/replacement in case of irreparable defects and repairs of defects of pipe
coating not attributable to Owner including defects / damages occurring during transportation/ handling including supply of coating material Checking, cleaning, aligning,
bending, cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as
LAYING-PE
required including 100% radiography; carrying out installation of carrier pipe at all crossings like roads/nallas at designated depths by open cut/jacking/boring (except at
75 13.5 COATED CS PIPE, M 100.00 3288.51 3,28,851.00
cased crossings or crossings carried out by HDD method); carrying out installation of carrier pipe in the casing pipe at cased crossings (excluding installation of casing pipes
12"
which is covered separately). Coating of field weld joints, long radius elbows, buried fittings and valves etc. including supply of coating materials etc. Installation lowering
the pipeline in trench to required depth, placement of PE/PVC warning mat over the pipeline along the complete route, padding around pipeline with suitable approved soil
including supply of padding material, PE/PVC warning mat, backfilling. Supply and installation of slope breakers, bank protection wherever required and as directed by
Engineer incharge. Carrying out air cleaning, pigging, flushing, cleaning , 24 hours hydrostatic testing and swabbing of complete pipeline as per under ground pipeline
specifications. The all equipments required for grading,stringing, lowering, coating, welding , testing, backfilling shall be in contractors scope. All tie-in, including the tie-ins
with adjacent section of the pipeline. Joint coating of joint by heat shrinkable sleeves including supply of sleeves and showing the holiday test as per specifications and
coating of fittings with cold applied tape including supply of cold applied tape and showing the holiday test as per specifications. Final clean - up and restoration of right -of -
use and disposal of debris and surplus material to designated disposal areas and re-instating the area to its earlier state and as directed by Engineer -in Charge. Preparation
of as-built drawings, pipe-books (1 set of tracing on polyster film and 6 sets of as - built drawings and 1 soft copy and 6 copies of pipe book.) All the works shall be
executed in accordance with the provision of contract and pipeline specifications and as per instruction of Engineer -in -charge/ owner.

Digitally signed by
AJITESH AJITESH KUSHWAHA
Page 12 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

Recieving and taking-over of 16'' NB line pipe from the IGL designated store in Delhi and shifting the same to site, handling, loading, transportation and unloading of
Owner supplied 3 - Layer PE coated linespipes along with associated fittings etc. transporation of Owner supplied materials other than linepipe from Owner's designatd
place(s) of issue to work site, arrangement of all additional lands required for Contractor;s storage, fabrication, access for construction, procurement and staking and
installation of construction markers, cleaning, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory / environment authorities to the entire
satisfaction of concerned authorities, grading of work area.the welding shall be carried out as per pipeline specifications and existing approved procedures , 100%
radiography shall be carried out of all joints. Trenching to all depths by excavation in all types of soils including soft/hard rock, chiselling or otherwise cutting different
types of pavement, footpath, roads tec. As required. And storing excavated soil, reusable materials at designated area as direction of owner. Minimum pipeline cover should
be 1.2 meter and the same should be checked during lowering Carrying out repairs of pipe defects/replacement in case of irreparable defects and repairs of defects of pipe
coating not attributable to Owner including defects / damages occurring during transportation/ handling including supply of coating material Checking, cleaning, aligning,
bending, cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as
LAYING-PE
required including 100% radiography; carrying out installation of carrier pipe at all crossings like roads/nallas at designated depths by open cut/jacking/boring (except at
76 13.6 COATED CS PIPE, M 100.00 4428.00 4,42,800.00
cased crossings or crossings carried out by HDD method); carrying out installation of carrier pipe in the casing pipe at cased crossings (excluding installation of casing pipes
16"
which is covered separately). Coating of field weld joints, long radius elbows, buried fittings and valves etc. including supply of coating materials etc. Installation lowering
the pipeline in trench to required depth, placement of PE/PVC warning mat over the pipeline along the complete route, padding around pipeline with suitable approved soil
including supply of padding material, PE/PVC warning mat, backfilling. Supply and installation of slope breakers, bank protection wherever required and as directed by
Engineer incharge. Carrying out air cleaning, pigging, flushing, cleaning , 24 hours hydrostatic testing and swabbing of complete pipeline as per under ground pipeline
specifications. The all equipments required for grading,stringing, lowering, coating, welding , testing, backfilling shall be in contractors scope. All tie-in, including the tie-ins
with adjacent section of the pipeline. Joint coating of joint by heat shrinkable sleeves including supply of sleeves and showing the holiday test as per specifications and
coating of fittings with cold applied tape including supply of cold applied tape and showing the holiday test as per specifications. Final clean - up and restoration of right -of -
use and disposal of debris and surplus material to designated disposal areas and re-instating the area to its earlier state and as directed by Engineer -in Charge. Preparation
of as-built drawings, pipe-books (1 set of tracing on polyster film and 6 sets of as - built drawings and 1 soft copy and 6 copies of pipe book.) All the works shall be
executed in accordance with the provision of contract and pipeline specifications and as per instruction of Engineer -in -charge/ owner.

Recieving and taking-over of 18'' NB line pipe from the IGL designated store in Delhi and shifting the same to site, handling, loading, transportation and unloading of
Owner supplied 3 - Layer PE coated linespipes along with associated fittings etc. transporation of Owner supplied materials other than linepipe from Owner's designatd
place(s) of issue to work site, arrangement of all additional lands required for Contractor;s storage, fabrication, access for construction, procurement and staking and
installation of construction markers, cleaning, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory / environment authorities to the entire
satisfaction of concerned authorities, grading of work area.the welding shall be carried out as per pipeline specifications and existing approved procedures , 100%
radiography shall be carried out of all joints. Trenching to all depths by excavation in all types of soils including soft/hard rock, chiselling or otherwise cutting different
types of pavement, footpath, roads tec. As required. And storing excavated soil, reusable materials at designated area as direction of owner. Minimum pipeline cover should
be 1.2 meter and the same should be checked during lowering Carrying out repairs of pipe defects/replacement in case of irreparable defects and repairs of defects of pipe
coating not attributable to Owner including defects / damages occurring during transportation/ handling including supply of coating material Checking, cleaning, aligning,
bending, cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as
LAYING-PE
required including 100% radiography; carrying out installation of carrier pipe at all crossings like roads/nallas at designated depths by open cut/jacking/boring (except at
77 13.7 COATED CS PIPE, M 100.00 4806.00 4,80,600.00
cased crossings or crossings carried out by HDD method); carrying out installation of carrier pipe in the casing pipe at cased crossings (excluding installation of casing pipes
18"
which is covered separately). Coating of field weld joints, long radius elbows, buried fittings and valves etc. including supply of coating materials etc. Installation lowering
the pipeline in trench to required depth, placement of PE/PVC warning mat over the pipeline along the complete route, padding around pipeline with suitable approved soil
including supply of padding material, PE/PVC warning mat, backfilling. Supply and installation of slope breakers, bank protection wherever required and as directed by
Engineer incharge. Carrying out air cleaning, pigging, flushing, cleaning , 24 hours hydrostatic testing and swabbing of complete pipeline as per under ground pipeline
specifications. The all equipments required for grading,stringing, lowering, coating, welding , testing, backfilling shall be in contractors scope. All tie-in, including the tie-ins
with adjacent section of the pipeline. Joint coating of joint by heat shrinkable sleeves including supply of sleeves and showing the holiday test as per specifications and
coating of fittings with cold applied tape including supply of cold applied tape and showing the holiday test as per specifications. Final clean - up and restoration of right -of -
use and disposal of debris and surplus material to designated disposal areas and re-instating the area to its earlier state and as directed by Engineer -in Charge. Preparation
of as-built drawings, pipe-books (1 set of tracing on polyster film and 6 sets of as - built drawings and 1 soft copy and 6 copies of pipe book.) All the works shall be
executed in accordance with the provision of contract and pipeline specifications and as per instruction of Engineer -in -charge/ owner.

14 Pipeline laying by Moling Method


Digitally signed by
AJITESH AJITESH KUSHWAHA
Page 13 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

Installation of 4" NB PE Coated Steel pipe without any casing by Moling. "Receiving and taking-over as defined in the specifications, handling, loading, transportation and
unloading of Owner supplied 3 - Layer PE coated line pipes from Owner designated stock-yard to Contractor's own stock yards/workshops/work-sites including preliminary
activities, carrying out inspection of owner supplied materials ( 3LPE coated line pipe ) at the time of taking over and supply of all materials ( except 3LPE coated line pipe
) consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, as per drawings, Specifications, other provisions of Contract
document and instruction of Owner/ Owner#s Representative, including but not limited to carrying out the following works: Site Preparation, welding, radiography, coating
field joints with special type heat shrinkable sleeves ( Direx ) pretesting of completed carrier pipe and making the string and welding of entry & exit point of moling/boring
MOLING- 4" CS with mainpipeline. Post installation of hydrotesting including leaks and repair of defects and retesting etc. for defects attributed to contractor's faulty work Hydrotesting with
78 14.1 M 20.00 2910.51 58,210.20
CARRIER mainpipeline and precommissioning activities like swabbing, drying to the specified criteria as per owner/owners representative. Purging with nitrogen ( Including supply )
and Commissioning of complete pipeline network including supply of all equipment, machinery, consumables, tools and tackles, manpower, etc., as per specification,
provisions of bid ocument and instructions of Owner/Owner#s Representative. Final dossier all notes & calculations as required in the specification. Preparation of as-built
drawings, pipe-books (1 set of tracing on polyester film and 6 sets of as - built drawings and 1 soft copy and 3 copies of pipe book.)" . Any other activities not mentioned/
covered explicitly above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of
work and has to be completed by the Contractor within specified time schedule at no extra cost to owner. It shall be done as per specification, code & standard & guideline
by Owner/ Owner#s Representative.

Installation of 6" NB PE Coated Steel pipe without any casing by Moling. "Receiving and taking-over as defined in the specifications, handling, loading, transportation and
unloading of Owner supplied 3 - Layer PE coated line pipes from Owner designated stock-yard to Contractor's own stock yards/workshops/work-sites including preliminary
activities, carrying out inspection of owner supplied materials ( 3LPE coated line pipe ) at the time of taking over and supply of all materials ( except 3LPE coated line pipe
) consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, as per drawings, Specifications, other provisions of Contract
document and instruction of Owner/ Owner#s Representative, including but not limited to carrying out the following works: Site Preparation, welding, radiography, coating
field joints with special type heat shrinkable sleeves ( Direx ) pretesting of completed carrier pipe and making the string and welding of entry & exit point of moling/boring
MOLING- 6" CS with mainpipeline. Post installation of hydrotesting including leaks and repair of defects and retesting etc. for defects attributed to contractor's faulty work Hydrotesting with
79 14.2 M 20.00 3266.18 65,323.60
CARRIER mainpipeline and precommissioning activities like swabbing, drying to the specified criteria as per owner/owners representative. Purging with nitrogen ( Including supply )
and Commissioning of complete pipeline network including supply of all equipment, machinery, consumables, tools and tackles, manpower, etc., as per specification,
provisions of bid ocument and instructions of Owner/Owner#s Representative. Final dossier all notes & calculations as required in the specification. Preparation of as-built
drawings, pipe-books (1 set of tracing on polyester film and 6 sets of as - built drawings and 1 soft copy and 3 copies of pipe book.)" . Any other activities not mentioned/
covered explicitly above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of
work and has to be completed by the Contractor within specified time schedule at no extra cost to owner. It shall be done as per specification, code & standard & guideline
by Owner/ Owner#s Representative.

Installation of 8" NB PE Coated Steel pipe without any casing by Moling. "Receiving and taking-over as defined in the specifications, handling, loading, transportation and
unloading of Owner supplied 3 - Layer PE coated line pipes from Owner designated stock-yard to Contractor's own stock yards/workshops/work-sites including preliminary
activities, carrying out inspection of owner supplied materials ( 3LPE coated line pipe ) at the time of taking over and supply of all materials ( except 3LPE coated line pipe
) consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, as per drawings, Specifications, other provisions of Contract
document and instruction of Owner/ Owner#s Representative, including but not limited to carrying out the following works: Site Preparation, welding, radiography, coating
field joints with special type heat shrinkable sleeves ( Direx ) pretesting of completed carrier pipe and making the string and welding of entry & exit point of moling/boring
MOLING- 8" CS with mainpipeline. Post installation of hydrotesting including leaks and repair of defects and retesting etc. for defects attributed to contractor's faulty work Hydrotesting with
80 14.3 M 20.00 3826.73 76,534.60
CARRIER mainpipeline and precommissioning activities like swabbing, drying to the specified criteria as per owner/owners representative. Purging with nitrogen ( Including supply )
and Commissioning of complete pipeline network including supply of all equipment, machinery, consumables, tools and tackles, manpower, etc., as per specification,
provisions of bid ocument and instructions of Owner/Owner#s Representative. Final dossier all notes & calculations as required in the specification. Preparation of as-built
drawings, pipe-books (1 set of tracing on polyester film and 6 sets of as - built drawings and 1 soft copy and 3 copies of pipe book.)" . Any other activities not mentioned/
covered explicitly above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of
work and has to be completed by the Contractor within specified time schedule at no extra cost to owner. It shall be done as per specification, code & standard & guideline
by Owner/ Owner#s Representative.

Digitally signed by
AJITESH AJITESH KUSHWAHA
Page 14 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

Installation of 12" NB PE Coated Steel pipe without any casing by Moling. "Receiving and taking-over as defined in the specifications, handling, loading, transportation and
unloading of Owner supplied 3 - Layer PE coated line pipes from Owner designated stock-yard to Contractor's own stock yards/workshops/work-sites including preliminary
activities, carrying out inspection of owner supplied materials ( 3LPE coated line pipe ) at the time of taking over and supply of all materials ( except 3LPE coated line pipe
) consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, as per drawings, Specifications, other provisions of Contract
document and instruction of Owner/ Owner#s Representative, including but not limited to carrying out the following works: Site Preparation, welding, radiography, coating
field joints with special type heat shrinkable sleeves ( Direx ) pretesting of completed carrier pipe and making the string and welding of entry & exit point of moling/boring
MOLING- 12" CS with mainpipeline. Post installation of hydrotesting including leaks and repair of defects and retesting etc. for defects attributed to contractor's faulty work Hydrotesting with
81 14.4 M 20.00 4850.85 97,017.00
CARRIER mainpipeline and precommissioning activities like swabbing, drying to the specified criteria as per owner/owners representative. Purging with nitrogen ( Including supply )
and Commissioning of complete pipeline network including supply of all equipment, machinery, consumables, tools and tackles, manpower, etc., as per specification,
provisions of bid ocument and instructions of Owner/Owner#s Representative. Final dossier all notes & calculations as required in the specification. Preparation of as-built
drawings, pipe-books (1 set of tracing on polyester film and 6 sets of as - built drawings and 1 soft copy and 3 copies of pipe book.)" . Any other activities not mentioned/
covered explicitly above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of
work and has to be completed by the Contractor within specified time schedule at no extra cost to owner. It shall be done as per specification, code & standard & guideline
by Owner/ Owner#s Representative.

Laying of HDPE Telecom Duct as per specificationLaying of 40mm OD, 6kg/cm2 permanently lubricated HDPE ducts,by moling method in all type of soil & terrain,
excavation as required, including cleaning and sealing of ducts at the end of laid drum lengths, preparation & Supply of Cable Blowing Pit including sand, jointing of HDPE
LAYING-OFC
conduit, Testing of HDPE Duct and accessories after laying,preparation of report and final drawing & documents as per specification, joint location marking , erection
82 14.5 DUCT BY M 100.00 162.00 16,200.00
accessories (suitable for min 8 kg/cm2 pressure rating) ,all complete as per specifications provided in the bid document & as per direction of consultant. (This duct is for
MOLING
future requirement for total length of pipeline as per spec. and drawing ). In case of crossings, the HDPE duct is to be tied at 2 o-clock position to carrier pipe with string at
regular intervals and held with Galvenised clamps or suitable material as decided by client / consultant.

15 Laying of Pipeline by HDD Method for repair of Pipeline

Installation/Shifting of 4" NB PE Coated Steel pipe without any casing by HDD "Receiving and taking-over as defined in the specifications, handling, loading,
transportation and unloading of Owner supplied 3 - Layer PE coated line pipes from Owner designated stock-yard to Contractor's own stock yards/workshops/work-sites
including preliminary activities, carrying out inspection of owner supplied materials ( 3LPE coated line pipe ) at the time of taking over and supply of all materials ( except
3LPE coated line pipe ) consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, as per drawings, Specifications, other
provisions of Contract document and instruction of Owner/ Owner#s Representative, including but not limited to carrying out the following works: Site Preparation,
welding, radiography, coating field joints with special type heat shrinkable sleeves ( Direx ) pretesting of completed carrier pipe and making the string and welding of entry
& exit point of HDD/boring with mainpipeline. Post installation of hydrotesting including leaks and repair of defects and retesting etc. for defects attributed to contractor's
faulty work Hydrotesting with mainpipeline and precommissioning activities like swabbing, drying to the specified criteria as per owner/owners representative. Purging with
STR PREP HDD nitrogen ( Including supply ) and Commissioning of complete pipeline network including supply of all equipment, machinery, consumables, tools and tackles, manpower,
83 15.1 M 250.00 4006.69 10,01,672.50
HYDTST 4'' etc., as per specification, provisions of bid document and instructions of Owner/Owner#s Representative. Final dossier all notes & calculations as required in the
specification. Preparation of as-built drawings, pipe-books (1 set of tracing on polyester film and 6 sets of as - built drawings and 1 soft copy and 3 copies of pipe book.)"
Installation of Crossings of carrier pipes by HDD / boring for Rail, Road, Nala and Canal crossings etc wherever required in all types of soils and terrain, including laying of
2 nos. HDPE telecom duct ( free issue material) & all associated works including supply of all other materials, equipment, consumables, manpower, jointing of HDPE
Telecom Duct including visual inspection of all weld Joints/HDPE Joints, backfilling and restoration as original of the facility crossed and performing all works as per
drawings, specifications and instructions of Owner/ Owner's Representative and provisions of contract document. Any other activities not mentioned/ covered explicitly
above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of work and has to be
completed by the Contractor within specified time schedule at no extra cost to owner. It shall be done as per specification, code & standard & guideline by Owner/ Owner#s
Representative.

Digitally signed by
AJITESH AJITESH KUSHWAHA
Page 15 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

Installation/Shifting of 6" NB PE Coated Steel pipe without any casing by HDD "Receiving and taking-over as defined in the specifications, handling, loading,
transportation and unloading of Owner supplied 3 - Layer PE coated line pipes from Owner designated stock-yard to Contractor's own stock yards/workshops/work-sites
including preliminary activities, carrying out inspection of owner supplied materials ( 3LPE coated line pipe ) at the time of taking over and supply of all materials ( except
3LPE coated line pipe ) consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, as per drawings, Specifications, other
provisions of Contract document and instruction of Owner/ Owner#s Representative, including but not limited to carrying out the following works: Site Preparation,
welding, radiography, coating field joints with special type heat shrinkable sleeves ( Direx ) pretesting of completed carrier pipe and making the string and welding of entry
& exit point of HDD/boring with mainpipeline. Post installation of hydrotesting including leaks and repair of defects and retesting etc. for defects attributed to contractor's
faulty work Hydrotesting with mainpipeline and precommissioning activities like swabbing, drying to the specified criteria as per owner/owners representative. Purging with
STR PREP HDD nitrogen ( Including supply ) and Commissioning of complete pipeline network including supply of all equipment, machinery, consumables, tools and tackles, manpower,
84 15.2 M 250.00 4850.85 12,12,712.50
HYD TST 6” etc., as per specification, provisions of bid document and instructions of Owner/Owner#s Representative. Final dossier all notes & calculations as required in the
specification. Preparation of as-built drawings, pipe-books (1 set of tracing on polyester film and 6 sets of as - built drawings and 1 soft copy and 3 copies of pipe book.)"
Installation of Crossings of carrier pipes by HDD / boring for Rail, Road, Nala and Canal crossings etc wherever required in all types of soils and terrain, including laying of
2 nos. HDPE telecom duct ( free issue material) & all associated works including supply of all other materials, equipment, consumables, manpower, jointing of HDPE
Telecom Duct including visual inspection of all weld Joints/HDPE Joints, backfilling and restoration as original of the facility crossed and performing all works as per
drawings, specifications and instructions of Owner/ Owner's Representative and provisions of contract document. Any other activities not mentioned/ covered explicitly
above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of work and has to be
completed by the Contractor within specified time schedule at no extra cost to owner. It shall be done as per specification, code & standard & guideline by Owner/ Owner#s
Representative.

Installation/Shifting of 8" NB PE Coated Steel pipe without any casing by HDD "Receiving and taking-over as defined in the specifications, handling, loading,
transportation and unloading of Owner supplied 3 - Layer PE coated line pipes from Owner designated stock-yard to Contractor's own stock yards/workshops/work-sites
including preliminary activities, carrying out inspection of owner supplied materials ( 3LPE coated line pipe ) at the time of taking over and supply of all materials ( except
3LPE coated line pipe ) consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, as per drawings, Specifications, other
provisions of Contract document and instruction of Owner/ Owner#s Representative, including but not limited to carrying out the following works: Site Preparation,
welding, radiography, coating field joints with special type heat shrinkable sleeves ( Direx ) pretesting of completed carrier pipe and making the string and welding of entry
& exit point of HDD/boring with mainpipeline. Post installation of hydrotesting including leaks and repair of defects and retesting etc. for defects attributed to contractor's
faulty work Hydrotesting with mainpipeline and precommissioning activities like swabbing, drying to the specified criteria as per owner/owners representative. Purging with
STR PREP HDD nitrogen ( Including supply ) and Commissioning of complete pipeline network including supply of all equipment, machinery, consumables, tools and tackles, manpower,
85 15.3 M 250.00 5384.36 13,46,090.00
HYDTST 8'' etc., as per specification, provisions of bid document and instructions of Owner/Owner#s Representative. Final dossier all notes & calculations as required in the
specification. Preparation of as-built drawings, pipe-books (1 set of tracing on polyester film and 6 sets of as - built drawings and 1 soft copy and 3 copies of pipe book.)"
Installation of Crossings of carrier pipes by HDD / boring for Rail, Road, Nala and Canal crossings etc wherever required in all types of soils and terrain, including laying of
2 nos. HDPE telecom duct ( free issue material) & all associated works including supply of all other materials, equipment, consumables, manpower, jointing of HDPE
Telecom Duct including visual inspection of all weld Joints/HDPE Joints, backfilling and restoration as original of the facility crossed and performing all works as per
drawings, specifications and instructions of Owner/ Owner's Representative and provisions of contract document. Any other activities not mentioned/ covered explicitly
above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of work and has to be
completed by the Contractor within specified time schedule at no extra cost to owner. It shall be done as per specification, code & standard & guideline by Owner/ Owner#s
Representative.

Digitally signed by
AJITESH AJITESH KUSHWAHA
Page 16 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

Installation/Shifting of 12" NB PE Coated Steel pipe without any casing by HDD "Receiving and taking-over as defined in the specifications, handling, loading,
transportation and unloading of Owner supplied 3 - Layer PE coated line pipes from Owner designated stock-yard to Contractor's own stock yards/workshops/work-sites
including preliminary activities, carrying out inspection of owner supplied materials ( 3LPE coated line pipe ) at the time of taking over and supply of all materials ( except
3LPE coated line pipe ) consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, as per drawings, Specifications, other
provisions of Contract document and instruction of Owner/ Owner#s Representative, including but not limited to carrying out the following works: Site Preparation,
welding, radiography, coating field joints with special type heat shrinkable sleeves ( Direx ) pretesting of completed carrier pipe and making the string and welding of entry
& exit point of HDD/boring with mainpipeline. Post installation of hydrotesting including leaks and repair of defects and retesting etc. for defects attributed to contractor's
faulty work Hydrotesting with mainpipeline and precommissioning activities like swabbing, drying to the specified criteria as per owner/owners representative. Purging with
STR PREP HDD nitrogen ( Including supply ) and Commissioning of complete pipeline network including supply of all equipment, machinery, consumables, tools and tackles, manpower,
86 15.4 M 250.00 7061.19 17,65,297.50
HYDTST 12'' etc., as per specification, provisions of bid document and instructions of Owner/Owner#s Representative. Final dossier all notes & calculations as required in the
specification. Preparation of as-built drawings, pipe-books (1 set of tracing on polyester film and 6 sets of as - built drawings and 1 soft copy and 3 copies of pipe book.)"
Installation of Crossings of carrier pipes by HDD / boring for Rail, Road, Nala and Canal crossings etc wherever required in all types of soils and terrain, including laying of
2 nos. HDPE telecom duct ( free issue material) & all associated works including supply of all other materials, equipment, consumables, manpower, jointing of HDPE
Telecom Duct including visual inspection of all weld Joints/HDPE Joints, backfilling and restoration as original of the facility crossed and performing all works as per
drawings, specifications and instructions of Owner/ Owner's Representative and provisions of contract document. Any other activities not mentioned/ covered explicitly
above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of work and has to be
completed by the Contractor within specified time schedule at no extra cost to owner. It shall be done as per specification, code & standard & guideline by Owner/ Owner#s
Representative.

Installation/Shifting of 16" NB PE Coated Steel pipe without any casing by HDD "Receiving and taking-over as defined in the specifications, handling, loading,
transportation and unloading of Owner supplied 3 - Layer PE coated line pipes from Owner designated stock-yard to Contractor's own stock yards/workshops/work-sites
including preliminary activities, carrying out inspection of owner supplied materials ( 3LPE coated line pipe ) at the time of taking over and supply of all materials ( except
3LPE coated line pipe ) consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, as per drawings, Specifications, other
provisions of Contract document and instruction of Owner/ Owner#s Representative, including but not limited to carrying out the following works: Site Preparation,
welding, radiography, coating field joints with special type heat shrinkable sleeves ( Direx ) pretesting of completed carrier pipe and making the string and welding of entry
& exit point of HDD/boring with mainpipeline. Post installation of hydrotesting including leaks and repair of defects and retesting etc. for defects attributed to contractor's
faulty work Hydrotesting with mainpipeline and precommissioning activities like swabbing, drying to the specified criteria as per owner/owners representative. Purging with
STR PREP HDD nitrogen ( Including supply ) and Commissioning of complete pipeline network including supply of all equipment, machinery, consumables, tools and tackles, manpower,
87 15.5 M 250.00 8424.00 21,06,000.00
HYDTST 16'' etc., as per specification, provisions of bid document and instructions of Owner/Owner#s Representative. Final dossier all notes & calculations as required in the
specification. Preparation of as-built drawings, pipe-books (1 set of tracing on polyester film and 6 sets of as - built drawings and 1 soft copy and 3 copies of pipe book.)"
Installation of Crossings of carrier pipes by HDD / boring for Rail, Road, Nala and Canal crossings etc wherever required in all types of soils and terrain, including laying of
2 nos. HDPE telecom duct ( free issue material) & all associated works including supply of all other materials, equipment, consumables, manpower, jointing of HDPE
Telecom Duct including visual inspection of all weld Joints/HDPE Joints, backfilling and restoration as original of the facility crossed and performing all works as per
drawings, specifications and instructions of Owner/ Owner's Representative and provisions of contract document. Any other activities not mentioned/ covered explicitly
above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of work and has to be
completed by the Contractor within specified time schedule at no extra cost to owner. It shall be done as per specification, code & standard & guideline by Owner/ Owner#s
Representative.

Digitally signed by
AJITESH AJITESH KUSHWAHA
Page 17 of 18

KUSHWAHA Date: 2022.12.28


17:31:34 IST
TENDER NO. IGL/ET2/CP/CP17304

RATE CONTRACT FOR ABOVE GROUND AND UNDERGROUND STEEL PIPELINE O&M WORKS

SCHEDULE OF RATES (SOR) - IGL OFFERED/ESTIMATED RATES

Offered/Estimated
Total Amount
Sr. No Item No. Item Description Brief Scope of the Work Unit Qty. Unit Rates In Rs.
excl. GST (Rs.)
(Excl. GST)

Installation/Shifting of 18" NB PE Coated Steel pipe without any casing by HDD "Receiving and taking-over as defined in the specifications, handling, loading,
transportation and unloading of Owner supplied 3 - Layer PE coated line pipes from Owner designated stock-yard to Contractor's own stock yards/workshops/work-sites
including preliminary activities, carrying out inspection of owner supplied materials ( 3LPE coated line pipe ) at the time of taking over and supply of all materials ( except
3LPE coated line pipe ) consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, as per drawings, Specifications, other
provisions of Contract document and instruction of Owner/ Owner#s Representative, including but not limited to carrying out the following works: Site Preparation,
welding, radiography, coating field joints with special type heat shrinkable sleeves ( Direx ) pretesting of completed carrier pipe and making the string and welding of entry
& exit point of HDD/boring with mainpipeline. Post installation of hydrotesting including leaks and repair of defects and retesting etc. for defects attributed to contractor's
faulty work Hydrotesting with mainpipeline and precommissioning activities like swabbing, drying to the specified criteria as per owner/owners representative. Purging with
STR PREP HDD nitrogen ( Including supply ) and Commissioning of complete pipeline network including supply of all equipment, machinery, consumables, tools and tackles, manpower,
88 15.6 M 250.00 9504.00 23,76,000.00
HYDTST 18'' etc., as per specification, provisions of bid document and instructions of Owner/Owner#s Representative. Final dossier all notes & calculations as required in the
specification. Preparation of as-built drawings, pipe-books (1 set of tracing on polyester film and 6 sets of as - built drawings and 1 soft copy and 3 copies of pipe book.)"
Installation of Crossings of carrier pipes by HDD / boring for Rail, Road, Nala and Canal crossings etc wherever required in all types of soils and terrain, including laying of
2 nos. HDPE telecom duct ( free issue material) & all associated works including supply of all other materials, equipment, consumables, manpower, jointing of HDPE
Telecom Duct including visual inspection of all weld Joints/HDPE Joints, backfilling and restoration as original of the facility crossed and performing all works as per
drawings, specifications and instructions of Owner/ Owner's Representative and provisions of contract document. Any other activities not mentioned/ covered explicitly
above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of work and has to be
completed by the Contractor within specified time schedule at no extra cost to owner. It shall be done as per specification, code & standard & guideline by Owner/ Owner#s
Representative.

GRAND TOTAL EXCL. GST 3,07,01,191.87


GST 18%
GRAND TOTAL INCL. GST 3,62,27,406.41
Notes
1. Unit rate of all SOR items will be increased/decreased in proportionate of quoted percentage
2. Quoted unit rates by bidder for each services mentioned in SOR will be fixed for a period of 2 years, however quantities may vary as per actual execution of work at site.
3. Bidder to ensure that total quoted is for complete scope and terms and conditions of Tender document.