Appendix B 3: DECLARATION FORM OF CONFORMITY REQUIREMENTS OF THE BIM DELIVERABLES (CIVIL WORKS MODEL)
Project Contractor
Phase Discipline
Date
1
Ver. 2016 Appendix B 3
B. PROJECT INFORMATION
Compliance
No. Description Refer Attachment Remarks
√ (Yes), X (No)
C. EARTHWORKS
Compliance
No. Description Refer Attachment Remarks
√ (Yes), X (No)
Site Topography created as Existing Ground
1.0 (EG)/Original Ground Level (OGL) based on valid Appendix B 3 C (a)
survey data
2
Ver. 2016 Appendix B 3
C. EARTHWORKS
Compliance
No. Description Refer Attachment Remarks
√ (Yes), X (No)
3
Ver. 2016 Appendix B 3
D. SEWERAGE SYSTEM
Compliance
No. Description Refer Attachment Remarks
√ (Yes), X (No)
4
Ver. 2016 Appendix B 3
Compliance
No. Description Refer Attachment Remarks
√ (Yes), X (No)
Compliance
No. Description Refer Attachment Remarks
√ (Yes), X (No)
5
Ver. 2016 Appendix B 3
G. DRAINAGE SYSTEM
Compliance
No. Description Refer Attachment Remarks
√ (Yes), X (No)
Drainage system modelled up to software
1.0 Appendix B 3 G (a)
limitation
…………………………………………………………………………………………… ……………………………………………………………………………………
6
Ver. 2016 Appendix B 3 A
(Example)
Surfaces created in
earthworks represent the
designed feature
7
Ver. 2016 Appendix B 3 A
(Example)
Model settings
established are
understandable
8
Ver. 2016 Appendix B 3 A
(Example)
Boundaries in
Civil Works
Model Prospector
(Example)
Boundaries of
model displayed
9
Ver. 2016 Appendix B 3 A
(1)
Coordinate
System
assigned
to model
(2)
Model
positioned
correctly on
BING Map
Item (1) and (2) as illustrated above are to determine the positioning of Civil Works
Model.
10
Ver. 2016 Appendix B 3 B
B. PROJECT INFORMATION
No. Description
(a) Checking the Project Information of Civil Works Model.
(1)
(2)
Project
Project Information
Information
generated in the
created
Project Drawing
Title Block
Item (1) and (2) as illustrated above are to determine the Project Information is
embedded in Civil Works Model.
11
Ver. 2016 Appendix B 3 C
C. EARTHWORKS
No. Description
(a) Checking the existing site topography of Civil Works Model.
(1)
Survey
contours from
surveyor
(2)
Survey contours
generated from
Civil Works Model
As illustrated above, Item (2) is to be compared with item (1) to ensure the similarity
which confirmed the validation of survey data.
In the event of survey contours are not available, Existing Surface (EG) is created using
AutoCAD Points and AutoCAD Text. Both EG created are compared to each other to
confirmed the validation of survey data.
Site Topography to be confirmed not to have any extreme elevation out of consistency.
12
Ver. 2016 Appendix B 3 C
C. EARTHWORKS
No. Description
(b) Checking the site analysis of Civil Works Model.
(1) (2)
(3) (4)
For example, item (1), (2), (3), and (4) as illustrated above saved separately and
named as follows:
13
Ver. 2016 Appendix B 3 C
C. EARTHWORKS
No. Description
(c) Checking the Feature Line of Civil Works Model.
(1) (2)
(3)
Example
of Feature
line
assigned
to
designed
elevation
Item (1), (2) and (3) as illustrated above are to determine Feature Line created are
named, assigned to elevation and grouped into design feature.
14
Ver. 2016 Appendix B 3 C
C. EARTHWORKS
No. Description
(d) Checking the Surfaces of Civil Works Model.
(4)
Road subgrade
TIN surface
overlapped with
another TIN
surface is not
acceptable
(5)
Acceptable TIN
surface generate
within designated
area
Item (4) and (5) as illustrated above are to determine Surfaces created according to
the design feature without overlapping TIN surface.
15
Ver. 2016 Appendix B 3 C
C. EARTHWORKS
No. Description
(e) Checking the Final Surface of Civil Works Model.
(6)
Example of
Paste Surface
order
(7)
Final Surface
with void is not
acceptable
(8)
Acceptable
Final Surface
16
Ver. 2016 Appendix B 3 C
C. EARTHWORKS
No. Description
(f) Checking the Ground profile of Civil Works Model.
(9)
EG from
Contours as
Existing
Ground
Surface
(10)
Final Surface
as DATUM
(11)
(12)
Ground Profile
Item (11) and (12) as illustrated above are to comply with acceptable format.
17
Ver. 2016 Appendix B 3 D
D. SEWERAGE SYSTEM
No. DESCRIPTION
(a) Checking the completeness of Civil Works Model.
(1)
Sewerage
Model
(2)
Sewer
Pipe
Item (1) as illustrated above are to be checked on overall model completeness which
required ensuring every major component of sewerage system modelled as actual or to
the nearest size and/or material available based on design.
Item (2) indicate that PVC Pipe modelled as VCP Pipe is acceptable.
18
Ver. 2016 Appendix B 3 D
D. SEWERAGE SYSTEM
No. DESCRIPTION
(b) Checking the data integrity of Civil Works Model.
(3) (4)
Designed Properties
Data Data
Item (3) and (4) as illustrated above are to be checked to determine the integrity of the
data displayed in the Civil Works Model. The properties data displayed in the model shall
reflect the designed data.
19
Ver. 2016 Appendix B 3 D
D. SEWERAGE SYSTEM
No. DESCRIPTION
(c) Checking the consistency of generated profile and table.
Item (5) and (6) as illustrated above are to be checked to determine the validity of data
generated based on design.
20
Ver. 2016 Appendix B 3 E
(1)
External Water
Reticulation
System Model
(2)
Modelled Pipe
as actual size
and/or material
Item (1) as illustrated above are to be checked on overall model completeness which
required ensuring every major component of external water reticulation system
modelled as actual or to the nearest size and/or material available based on design.
Item (2) indicate that the External Water Reticulation pipe are modelled as actual size.
Note: In some cases, the system might not be able to be modelled completely due to
the limitation of software (absence of component). Therefore, 2D drafting indicating the
component are acceptable.
21
Ver. 2016 Appendix B 3 F
(1)
Road
Corridor
(2)
Generated
Typical Cross-
Section
(3)
2D Drafting Cross-Section
Modelling of Internal Road System might sustain restrictions due to the capabilities of
software to transform the geometric design of the Internal Road System. Therefore, the
checking parameter is customized accordingly to the model prepared. For example, if
the project modelled the Internal Road System partly, the generated component
available to be check are the typical cross-section. The generated cross- section should
generally similar with designed cross-section.
Note: In the event the Internal Road System might not be able to be modelled, 2D
drafting indicating the component are acceptable.
22
Ver. 2016 Appendix B 3 F
G. DRAINAGE SYSTEM
No. DESCRIPTION
(a) Checking the completeness and the integrity of model
Modelling of Drainage System are applying the rules of pipe networks which are the
same as sewerage system and only applicable for closed drain. Therefore, the checking
is centred on the completeness of major component of the system and the integrity of
the data.
Note: In some cases, the system might not be able to be modelled completely due to
the limitation of software (absence of component). Therefore, 2D drafting indicating the
component are acceptable.
23
Ver. 2016 Appendix B 3 F
24