Sanjay Shripat Shinde.


At post: - B-22, Herdillia Colony, Kherdi.
Maharashtra, India. 415604
Mobile: +91 9270016270
Email Id: - sanjay.shinde9999@gmail.com

SUMMARY OF SKILLS
• Over 24 years of experience in Mechanical Maintenance, Commissioning, Pre-commissioning, Plant startup, Shut down, and operation
for Chemical, Polymer, Oil & Gas, Petro chemical Plants.
• Commissioning, Pre com. Startup & Operation of Inlet Gas Treatment, Acid Gas Removal, Amine absorber and Regeneration,
Amine re-boiler & Dehydration System.
•.Commissioning of sulphur plant equipment, performance test and safe startup of sulphur recovery unit.
• Commissioning, Pre com. of ammonia plant / urea plant, Amine regeneration unit glycol dehydration unit, sulphur recovery
unit, HP & MP section in urea.
• Commissioning, startup & operation of Boiler, Hot Oil System, Fuel Gas and Flare System.
• Nitrogen, Air. Water & Waste Water Systems
• Perform all tasks in compliance with all safety regulations, requirements and procedure.
• Mechanical run test, Function test, and operation test of all types of pumps, blowers Compressors, Steam turbine, Vacuum
Pumps, ID/FD fans, conveyer systems, lubrication systems.
• Plane & implement preventive, predictive, shutdown maintenance as well as trouble shooting & Breakdown maintenance of
rotary & static equipment.
• Having to scrutinize technical, mechanical problems and follow corrective procedure to fix the problem and avoid
reoccurrence.
• Leading a team of technician in preparation & execution of Pre-commissioning cleaning activities by EPC contractor witnessing
with PMT/PMC, like air blowing, water flushing, Mechanical Run-in Test of
( pumps, blowers, fans), steam blowing, final box up of (filters, strainers, Vessels, tanks), Solo run of motor & Steam turbine, Lube
oil Flushing, Leak/Tightness Test.
• Operational Test for various Process Systems & Performance test of Plant.
• Takes and records in both field and local ITR control rooms a variety of parameters as required a variety of readings, such as
gas flows, levels, flow rates and vibrations, and records unusual occurrences after reporting them to control room.
• Impart training to Junior Officers & Operator about safely work operation of systems.
• Experience of Pigging of Feed Gas Line.
• Commissioning, startup & operation of LPG splitter, De-Ethenizer, De-propenizer
• Operation of Compressors and Refrigerant Systems.
• Oil Stabilization Unit, Tank Farm, Distillation,
• Proactive in ordering stores material before requirement & in advance plane for further work.

SAFETY AND ENVIRONMENT:

• Hazard Identification, Risk Analysis, and Risk Assessment, Job Safety Analysis, and HAZOP study of critical jobs for safe Operation
preparing, reviewing and updating.
• Lock out Tag out, Update blind list.
• Manage and ensure Emergency Response preparedness during the shift and lead immediate actions to deal with upset or unstable
operational conditions in coordination with all involved personnel, including the respective Site Manager, Fire Shift Supervisor,
Security Shift Supervisor and the medical support, if needed.
• Emergencies handled like gas leakage, Fire & Acts as I.C. in emergency plan and fire drills
• Conducting regular field exercises for the officers regarding operations and Safety.
• Preparation and issuing of work permit and ensuring safety at work place.
• Implementing (PSSR) Personnel Safety & Social Responsibilities in the minds of employee.
• Monitor the prevailing working conditions and ensures safe working practices in the company.
• Operating Firefighting equipment’s like Extinguishers, Fire pumps, Sprinkler’s, Deluge, etc.
• Onsite emergency plan, gas & fire detections, fire hydrant deluge sprinklers, monitors, water curtains, fire extinguishers, ESD,
Mock drills. Fire drills, monitoring of explosive limits by gas meter.

DOCUMENTATION:
• Daily Report, Weekly Report.
• Planning and scheduling of periodically Preventive maintenance of equipment’s, machineries and instruments with co-ordination
of departments.
• Preparation of procedure with markup P&ID for all type of maintenance job i.e. Routine, Preventive, Break down & Shut
down maintenance.
• Provide necessary assistance to other departments for handling plant emergencies. Suggest changes and modifications in the
problematic systems / equipment’s for improving the overall system.
• Inventory control on store/utility purchasing and maintain records for the same.
• Checklists, Logbooks, Work permits.
• Exposure of ISO9001/ISO14001/OHSAS18001 System

CAREER PROFILE:
PROJECT NAME: TECHNIP ENERGIES, HURL BARAUNI, BIHAR INDIA
FERTILIZER PROJECT
WORK AREA: UREA UNIT
• Client - HURL
• Discipline - Per- commissioning, commissioning and start up
• Designation - PCC field engineer
• Period - Present working from January 2022.
ACTIVITES:
• Worked on HP ammonia pump, (Ebbara, Model – 6 x 10 1/4 8 stg HSB) Capacity- 291 m3/h, Head- 3664m RPM- 6259, Pressure-
38.5/317 kg /cm2. Motor rated power- 2950 kw, HP Carbamat pump (Ebbara Model- 150SSPI2M) Capacity- 164 m3/h, Head –
429m, RPM- 2972, Pressure- 34/221.8 kg/cm2, Motor rated power-1100kw
1. Solo run of HP ammonia/ Carbamat pump motor and that’s seal flushing pump motor & lube oil auxiliary motor
2. Oil flushing & seal flushing done upto no foreign material in the oil and water,
3. MRT of HP ammonia/ Carbamat pump, seal flushing pump, oil flushing, & both booster pump. During plant startup
worked for field operation at Ammonia and Carbamat pump house, and related equipment as well.
• Commissioning, Pre com. hydro-genarator, sulphur absorber, NH3 process line, CO2 absorption section, & syngas compressor
solo run.
• MRT of various pump- condensate pump, seal flushing pump, DM water booster pump, process condensate pump, close drain
pump etc.
• HP ammonia and carbamat pump lube oil flushing - making required temporary spool piece, line up as per P&ID, with required
isolation valve, provide 100 mesh in 6”, 4”, 3” return line for foreign material collection, checking oil skid tank cleanliness, fill up oil
with 200 mesh filter, done multi discipline walk down after punch point closing energized pump motor, inspection with client, all
valves lineup and start lube oil auxiliary pump, provide external heater to maintain oil temperature 65 degree Celsius , given thermal
shock minimum temperature 35 degree Celsius, first 100 mesh removal for checking within 2 hrs. After every 12 hrs. 100 mesh
cleaning upto no foreign material found in mesh.
• Systems Air flushing, water flushing, P&ID verification, line up inspection, preparing required spool piece, box up, witnessed by client.

2. PROJECT NAME: JGC CORPORATION, (SAUDI ARAMCO) JAZAN REFINERY, SAUDI ARABIA.
WORK AREA: EPC-12 NAPHTHA PROCESSING & AROMATIC PACKAGE, JAZAN REFINERY AND TERMINAL PROJECT.
• Client - SAUDI ARAMCO
• Discipline - Per- commissioning
• Designation - Pre-Commissioning Supervisor
• Period - January 2019 to 31 Oct 2019
ACTIVITES:
• System and subsystem P&ID verification, line-up, inspection, preparations and tightness testing of systems/components including
hydro testing water flushing and air blowing.
• Conduct system and subsystem tightness test, witnessing to hold the pressure for 2 Hrs and gate approval from client.
• As per P&ID line up and N2 purging, lay-up as per standard procedure.
• Draying of Furness also all systems in Naphtha & Aromatic area checking due points with client witnesses.
• Ensures quality & high level of HSE performance by ensuring work standards, procedures and HSE programs are followed and
given a high-level priority.
• Preparation of all PTW and permit receiver for day to day activities.
• Responsibility to conduct daily tool box meeting for daily job activity also to explain hazard involve, and all team members to brief
safety talk.

3. PROJECT NAME: JGC CORPORATION, BANAGAS PROJECT, CGP- 3 (BAHRAIN) .


WORK AREA: BANA GAS CGP III, PRE-COMMISSIONING, COMMISSIONIG, & START UP OPERATION
• Client – Bana gas
• Discipline - Per- commissioning, commissioning & startup.
• Designation - Pre-Commissioning Supervisor
• Period - April 2018 to 31 Oct 2018
ACTIVITIES:
• Line cleaning with air blowing and water flushing, steam blowing, drying, inerting with N2, high pressure leak test, & high pressure
tightness test.
• Degreasing of AGR system as per procedure with vender.
• LPTT & HPTT of AGRU as per procedure.
• MRT of cooling, demine and potable water pumps and passivation for cooling water system.
• MRT & trouble shooting of air fin cooler total 72 Nos. & RGC lube oil cooler MRT.
• MRT of stabilizer compressor, AGC & GT lube oil pump, also GT emergency lube oil pump.
• Line up & MRT of Deethanizer Reflux pump, Propane, Butane, Naphtha product pump as well as export pump with Hydrocarbon
(Total 16 pump MRT with Hydrocarbon).
• MRT of RGC /GT lube oil pump & Emergency Lube oil pump.
• Responsibility for all MRT like pump, finfan, and compressor, blower with client and to gate AFI approved sign from client.
• .Commissioning, Pre com. of SRU equipment’s like condenser, preheater, reactor, main blower, quench column, incinerator.
• Commissioning, Pre com. Startup & Operation of Inlet Gas Treatment, Acid Gas Removal, Amine absorber and Regeneration, Amine
reboiler & Dehydration System.
• Plant startup by introducing gas step by steps and worked as field operator in the hot section area.
• Operational test of various process systems and successful performance test of the plant within limited time.

4. PROJECT NAME: - JGCS CONSORTIUM NSRP PROJECT WITH GS E&C (VIETNAM)


WORK AREA: PRE-COMMISSIONING, COMMISSIONING, MECHANICAL DEPT.
• Client - NSRP PROJECT (NGHI SON REFINERY & PETROCHEMICAL COMPLEX PROJECT)
• Discipline - Pre-Commissioning and Commissioning
• Designation - Commissioning Supervisor (Rotating)
• Period - August 2016 to August 2017
ACTIVITES:
• Supervise & execute site activities such as Pre-Commissioning, Commissioning and Mechanical run test for product service pump, sea
water intake pump (offshore) and cooling water pump, high capacity centrifugal, reciprocating, ETP related all pump, chemical dosing,
injection pump, cooling fan, blowers, compressor, conveyer, sea water screen & trash rack machines (BiLFINGER) Solo run test of steam
turbines (DR) various types of pumps & fans.
• Conducting Pre-Commissioning, Commissioning such as water flushing, air blowing, stem blowing, lube oil flushing, reinstatement,
tightness test, inerting & equipment internal inspection, loop test and function test
• Hydraulic oil flushing & functional test of offshore 23 Nos. marine loading arm (KANON) & MRT offshore pump.
• MRT & functional test of electro chlorination package & MRT & functional test of steam turbine.
• Oil flushing of HMU compressor & secondary oil charging work.
• Air flushing & lube oil, grease charging in sulfur manufacturing unit, reclaimer (PHB) & ship loader.
• MRT of foam dosing skid and diesel engine fire water pumps.
• Fire water system like fire deluge system, fire monitor, hose reel, foam system pre-commission, commission trial test well &
handover to client.
• Different types of barrier/buffer fluid filling in the TS pot & N2 charging as per standard procedure.
• Chemical Loading & catalyst loading.
• Plan, Monitor and assist vendor activities & daily reports to commissioning superintendent
• Ensure compliance of the activities for which he is responsible with the established process and HSE requirements, while respecting
the relative time.
• Preparation of all major PTW for Construction, Commissioning, operation startup activities. Manage the health & safety of the work
area with working knowledge of a safe system for work & risk assessments & as per HSE standard.
• Giving on the job training, tool box meeting & safety talk on a daily basis or when & before a new job starts.
• Conducting the Pre-Commissioning, Commissioning, such as Flushing, High Press Leak test, Inerting, Function test, Rotating
equipment running test, Startup activities.
• Safety walks down for commissioning activities.

5. PROJECT NAME: - SI GROUP INDIA LTD. MNC (AMERICAN GROUP) MAHARASHTRA, (INDIA)
WORK AREA: PRE-COMMISSIONING, COMMISSIONING, MAINTENANCE
• Discipline - Mechanical maintenance & production Department
• Designation - Executive Engineering
• Period - July 2005 to July 2016
ACTIVITES:
• Developing and preparation of pre-commissioning systems and detailed procedures for Flushing, Blowing, lube oil systems
flushing, chemical cleaning of process lines, Leak Test, Inerting, Chemical Loading etc. accordingly with client standards and
comments; submitted to review, comments and approval to Comm. Manager and client Organization.
• To identify plant bottlenecking, commissioning and to modify accordingly to optimize plant performance and tracking key yield
parameters to ensure the smooth and efficient functioning of the Plant.
• Working in process operation on reaction kettles & regarding all process equipment to rectify & improve BCT.
• Safety Duties such as PTW (Permit to Work) system handling, LOTO & Red blind management & other safety duties.
• Planning, implement & executing shutdown activity of the plant.
• Erection & commissioning & maintenance of Roto form Granulation system. (20 Million)
• Working on installation, alignment, condition monitoring, trouble shutting & maintenance of rotary & static equipment.
• Plan, Monitor and assist vendor activities as required.
• Manage 15 technicians 12 persons fabrication team responsible for PM, predictive & breakdown maintenance as well as plant
modification to improve plant capacity with maintain factory economies & finance.
• Giving on the job training, tool box meeting, safety talk on a daily basis or before new work starts.
• Implements wide variety of engineering solutions to increase equipment availability, increase net operating rate, reduce
operation losses, reduce batch cycle time.
• Successfully executed and implemented resin powder plant project.
• Implemented near miss system to minimize unsafe conditions, act in workplace.
• Provided and implemented LOPA and LOTO system
• Motoring plant performance against approved targets on a day-to-day basis and identifying existing or potential technical
problems.
• Floating enquiries, techno commercial assessment of quotations, discussions with vendors, ordering of Eng. Material, equipment’s &
co-ordinate post order activities erection & commissioning.
• Identifying, Monitoring and maintaining critical spares for plant equipment.
• Participated in incident investigations Team and strengthened systems for recurrence.
• Responsible for legal testing like pressure vessel, lifting tools & tackles, hot oil testing.
• Prepared monthly report &Team member of PSSR.
• Working with computerize system like SAP/ ROSS

6. ORGANIZATION: - HERDILLIA –OXIDE & SPECIALITY LTD. MAHARASHTRA, (INDIA)


WORK AREA: MAINTENANCE, COMMISSIONING, PRE COMMISSIONING
• Discipline - Engineering& Utility Operation Maintenance
• Designation - Senior Maintenance Engineer.
• Period - August 1997 to June 2005
ACTIVITES:
• Prepare the Commissioning requirements related to HSE or review the same with the HSE department address safety aspects in
all procedures and documents.
• Planning and scheduling. Prepare the pre-commissioning, commissioning, start up and test run execution plans with the assistance of
the Commissioning Leader.
• Supervise nine technicians, 10 persons of fabrication team responsible for PM, predictive & breakdown maintenance as well as plant
modification to improve plant capacity.
• Improve and modification calciner burner system to save LPG fuel around 30%.
• Debottlenecking and process optimizing for existing plant.
• Hazop study of the new process.
• Coordination with the process department to ensure timely completion of job.
• Established plant startup and shutdown procedure for plant stabilization.
• To maintain highest level of safety during all stages of Project Execution to avoid any type of accidents incidences.
• Making daily utility monitoring & consumption report covering production verses utility.
• Attend weekly progress meetings with other members of the development team
And ensure that process problems and requirements that need to improve plant capacity
• Line cleaning Air blowing, water flushing, hydro jetting, and steam blowing.
• Familiar with all utility unit and Tank farm area.
• Execute commissioning & start up activity safely with required quality

7. ORGANIZATION: - SCAN ORGANIC LTD. (DIES INTERMEDIATE.) INDIA


• Discipline - Engineering
• Designation - Maintenance Officer.
• Period - May 1995 to June 1997
ACTIVITIES:
• Lead the engineering department, with responsibility for all equipment and personnel.
• Supervise 60 contractor people at newly built plant for equipment erection commissioning and fabrication of pipe line and
structure.
• Established the company’s first engineering department to control equipment, inventory, and repairs to improve
departmental efficiency.
• Supervise and assist the company’s engineering workshop to do workshop related jobs.
• Develop skill level of the plant employees and supporting them to achieve their targets.
• Lead the maintenance team responsible for day to day maintenance of equipment to improve equipment reliability.

8. ORGANIZATION: -SHINE PLASTIC & POLYMERS LTD. MAHARASHTRA (INDIA)


• Discipline - Maintenance & Production
• Designation - Maintenance Engineer
• Period - May 1994 to April 1995
ACTIVITIES:
• Good experience in service repairs and maintenance of plastics processing machinery, including schedule and preventive maintenance
of blow molding, injection molding machines and plastic extrusion machinery and extruders. Also, knowledge to handle plastic
machinery breakdowns, hydraulic circuits and all pneumatic system
• Responsible for production and quality development by adapting new technic & policies for improvement.
• Responsible for day to day operation & maintenance of extrusion extruder injection, blow molding crusher, mixer machines
Calculate mold size for specific product.
• Good experience of commissioning operation & maintenance of conveying system in PP, PE plant.

9. ORGANIZATION: - NEW LIFE PHARMACEUTICAL LTD. PUNE (INDIA)


• Discipline - Maintenance & Production
• Designation - Maintenance Engineer
• Period - May 1993 to April 1994
ACTIVITIES:
• Work started as shift maintenance engineer responsible for to maintain equipment in shift duties to continuously running of plant
without down time.
• Reduced recurring maintenance work & improve plant capacity.
• Doing continual improvement in routine job to reduce BCT and manpower.
• Designed and provided safety guard to stripping machine to zero accident

TRAINING COMPLETED

• Fire and Safety SI Group Ltd.


• Chemical awareness spill prevention lifting and rigging, hole watcher, mechanical isolation, Mechanical integrity.
• H2S Training – NOCIL LTD. India
• Lock Out and Tag Out.
• Fire Fighting, SCBA and Authorized Gas Tester for Confined Space.
• Permit to Work, Height, Safety, Confined Space, Hazard Management and Waste Management
• Attended various seminars on Safety in petrochemical Industries & oil & gas units.

TECHNICAL & EDUCATION QUALIFICATION:

• Three Years full time DIPLOMA IN MECHANICAL ENGG. From MSBTE (Government polytechnic Ratnagiri) Maharashtra India
in the year 1993.
• Integrated Management (QMS/EMS/OHSAS) system as Internal Auditor.
• Completed course Safety & General Awareness in chemical industry from (NCVT) India. PERSONAL

DETAILS:

DOB: 10 September 1968


Marital Status: Married
Languages Known: English / Hindi / Marathi
Passport No: R4982318 (Valid up to 27 Sept.2027)
Issue Date: 28/09/2017
Expiry: 27/09/2027
Skype ID: sanjay.shinde9999

Declaration

I hereby take the responsibility of the authenticity of the above information and data

Sanjay S. Shinde
Mob:-+91 9270016270