Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

ANNEX 3 Gap Analysis Template

SCHOOL IMPROVEMENT PLANNING


GAP ANALYSIS TEMPLATE
REGION: _____IX___________________

DIVISION: ___Pagadian City___________

DISTRICT: ___4_____________________

BARANGAY: __Sta. Maria______________

SCHOOL: ____Zamboanga del Sur National High School_

Instruction: Use the matrix on the next page as a guide in assessing the gap between your Division Targets (A) and school performance (B). In particular,
you can fill out the matrix by answering the following questions for each Division Target:

B1. Data needed – What data do we need to assess our school performance against this Division Target?

B2. Currently contributing – Is our current school performance contributing to the attainment of this Division Target? How is it contributing or not
contributing? Explain.

B3. Inhibiting Factors – If contributing, what are the factors that prevent us from contributing further to this Division Target? If not contributing, what are the
factors that prevent us from contributing to this Division Target? Include the most pressing needs or problems from available data.

B4. Projects implemented – What school projects being implemented are geared towards the attainment of this Division Target? If no such projects are being
implemented, leave it blank.

B5. Groups that require attention – Are there groups in our school that require specific attention concerning the attainment of this Division Target? (e.g.,
considering gender, socio-economic status, ethnicity).

___December 14, 2022_______________

DATE ACCOMPLISHED
ANNEX 3 Gap Analysis Template
B. SCHOOL PERFORMANCE
B2. CURRENTLY B5. GROUPS
A. DIVISION TARGETS B1. DATA B3. INHIBITING B4. PROJECTS
CONTRIBUTING THAT REQUIRE
NEEDED FACTORS IMPLEMENTED
YES/NO EXPLANATION ATTENTION

RESILIENCY AND WELL-BEING


- Materials/
supplies are
not available
in the PS-
DBM and
1. Request local market.
and Thus,
Issuance seldom delay All
Provide
Slip of learners,
80% repaired students, 1. Repaired
2. distribution. Teaching &
damaged school Yes teachers damaged
Accomplis Non-
bldgs. conducive to school bldgs.
hment - Schools are Teaching
learnings.
report monitored on its Staff
3. Stock implementation.
Cards
-Auditing on
procurement
process and
distribution
conducted .
ANNEX 3 Gap Analysis Template

You might also like