STRUKTUR
9,0
Denah
1,00
2,00
8,00 2,00
2,00
1,00
9,0
Pembebanan :
Beban Mati :
- Berat sendiri pelat 20cm = 0.2*2400*2 = 960 kg/m'
- Berat aspal = 0.07*2300*2 = 322 kg/m'
- Berat air hujan = 0,01 * 1000 *2 = 20 kg/m'
1302 kg/m'
Beban Hidup :
- Beban Hidup = 400 *2 = 800 kg/m'
1 / 11
Beban Kendaraan :
P = 10000 kg
L = 9,00 m
2
M max = 1/8 w l + 1/4 P l
2
= 1/8 3598,4 9,00 + 1/4 6.000 9,00
= 36.433,80 + 13.500
= 49.933,80 kg.m
= 49.933,80 E4 N.mm
Data balok :
- lebar b = 450 mm
- tinggi h = 900 mm
- beton decking = 25 mm
- tebal efektif d = 875 mm
- Mutu beton fc' = K-300 = 24,61 Mpa
- Mutu baja fy = U-39 = 390 MPa
0.003
Cc a=b1.xb
xb
d
Tb=As.fy
es=ey
b
2 / 11
xb ecu
=
d ecu + (fy/Es)
ecu
xb = .d
ecu + (fy/Es)
0,003
= 875
0,003 + 390
200000
= 530,30 mm
xmax = 0,75 . Xb
= 0,75 530,30
= 397,727273
a = b xmax
= 0,85 397,7273
= 338,07 mm
Cc = 0,85.fc.b.a
= 0.85 24,61 450 338,07
= 3.182.346 N
Mn = Cc . (d - (a/2))
= 3.182.346 ( 875 - 338 / 2)
= 2.246.627.552 Nmm > 499.338.000 Nmm
m = fy / (0,85 .fc')
390
=
0,85 24,61
= 18,64
2
Rn = M / (f b d )
499.338.000,00
= 2
0,85 450 875
= 1,7051
1 2 1,7051 18,64
= (1- 1-
18,64 390
= 0,00456640
3 / 11
rb = 0,85*f'c'*b1 600
fy 600 + fy
r max = 0,75 r b
= 0,75 0,02763127
= 0,02072346 > r = 0,00456640
r min = 1,4 / fy
= 0,00359 < r = 0,00456640
Aperlu = r .b .d
= 0,00457 450 875 = 1.798,02 mm2
Dipasang tulangan :
A = 10 D 25 ( Aact = 4.908,74 mm2)
A' = 5 D 25 ( Aact = 2.454,37 mm2)
P1 = 6.000 kg P2 = 1.500 kg
w= 3598,4 kg/m'
L = 9,00 m
V max = 1/2 w l + P1 + P2
= 1/2 3598,4 9,00 + 6.000 + 1.500
= 16.192,80 + 6.000 + 1.500
= 23.692,80 kg
= 236.928,00 N
4 / 11
f Vc
= f .1/6. pbfc'. bw .d
f Vs = Av .fy .d / s
f Av .fy .d
s =
f Vs
28.500.528,55
=
41.594,66
= 685,20 mm
5 / 11
Rencana Pondasi :
A. Cn K. JHP
P= +
3 5
361728 67070,4
= +
3 5
= 120.576,00 + 13.414
= 133.990,08 kg
206.108,00
= = 12.882 kg < P= 133.990 kg ….. (OK)
16
Denah
100 185
Tampak Samping
60
185
6 / 11
Tampak Depan
60 ABUTMENT
Pembebanan
Pembebanan pada 1 Balok Gelagar (L=9.0m)
kondisi Beban max terjadi saat :
P1 = 6.000 kg P2 = 1.500 kg
w= 0 kg/m'
L = 9,00 m
P max = 1/2 w L + P1 + P2
= 1/2 3598,4 9 + 6.000 + 1.500
= 16.192,80 + 6.000 + 1.500
= 23.692,80 kg
P = 23.692,80 kg
w= 2.880 kg/m'
60
200
7 / 11
untuk balok menerus tumpuan sendi :
2
M max = 1/12 w l + 1/8 P l
2
= 1/12 2.880 2,00 + 1/8 23.693 2,00
= 960,00 + 5.923
= 6.883,20 kg.m
= 6.883,20 E4 N.mm
Data Abutment :
- lebar b = 1850 mm
- tinggi h = 600 mm
- beton decking = 25 mm
- tebal efektif d = 575 mm
- Mutu beton fc' = K-300 = 24,61 Mpa
- Mutu baja fy = U-32 = 320 MPa
0.003
Cc a=b1.xb
xb
d
Tb=As.fy
es=ey
b
xb ecu
=
d ecu + (fy/Es)
ecu
xb = .d
ecu + (fy/Es)
0,003
= 575
0,003 + 320
200000
= 375,00 mm
xmax = 0,75 . Xb
= 0,75 375,00
= 281,25
a = b xmax
= 0,85 281,25
= 239,06 mm
Cc = 0,85.fc.b.a
= 0.85 24,61 1850 239,06
= 9.251.533 N
8 / 11
Mn = Cc . (d - (a/2))
= 9.251.533 ( 575 - 239 / 2)
= 4.213.784.388 Nmm > 68.832.000 Nmm
m = fy / (0,85 .fc')
320
=
0,85 24,61
= 15,30
2
Rn = M / (f b d )
68.832.000,00
= 2
0,85 1850 575
= 0,1324
1 2 0,1324 15,30
= (1- 1-
15,30 320
= 0,00041504
0,85*f'c'*b1 600
rb =
fy 600 + fy
r max = 0,75 r b
= 0,75 0,03623789
= 0,02717842 > r = 0,00041504
r min = 1,4 / fy
= 0,00438 > r = 0,00041504
Aperlu = r min .b .d
= 0,00438 1200 575 = 3.018,75 mm2
Dipasang tulangan :
380,133
A = D 22 - 125 ( Aact = 3.041,06 mm2)
9 / 11
Pembesian Lentur Arah Melintang :
P = 23.692,80 kg
w= 2.880 kg/m'
60
100
2
M max = 1/8 w l + 1/4 P l
2
= 1/8 2.880 1,00 + 1/4 23.693 1,00
= 360,00 + 5.923
= 6.283,20 kg.m
= 6.283,20 E4 N.mm
m = fy / (0,85 .fc')
320
=
0,85 24,61
= 15,30
2
Rn = M / (f b d )
62.832.000,00
= 2
0,85 1000 575
= 0,2236
1 2 0,2236 15,30
= (1- 1-
15,30 320
= 0,00070245
Aperlu = r .b .d
= 0,00070 1000 575 = 403,91 mm2
Dipasang tulangan :
A = D 16 - 125 ( Aact = 1.608,50 mm2)
1850
10 / 11
Gaya Geser pada Balok Abutment :
kondisi Geser max terjadi saat :
P1 = 2.880 kg P2 = 720 kg
w= 0 kg/m'
L = 9,00 m
V max = 1/2 w L + P1 + P2
= 1/2 3598,4 9 + 2.880 + 720
= 16.192,80 + 2.880 + 720
= 19.792,80 kg
= 197.928,00 N
600
D16 - 125 D22 - 125
1850