METALS INDUSTRY RESEARCH AND DEVELOPMENT CENTER

2014 MONTHLY PLANNED PREVENTIVE MAINTENANCE SCHEDULE


MATERIALS AND PROCESS RESEARCH DIVISION
Effectivity Date: January 2, 2014 Revision No.: 0
No. of Weeks per Month
MACHINES
1 to 5 6 to 9 10 to 13 14 to 17 18 to 22 23 to 26 27 to 31 32 to 35 36 to 39 40 to 44 45 to 48 49 to 53
Months per year JAN FEBMAR APR MAY JUN JUL AUG SEP OCT NOV DEC
NO. DESCRIPTION CODE MO./SER. NO. F W F W F W F W F W F W F W F W F W F W F W F W
1 MAZAK-MATE LATE MACHINE 211-01-00-00 33776 VI 1 XII 1
2 BAND SAWING MACHINE 211-03-00-00 701512 VI 1 XII 1
3 TABLE BENCH SAW 211-04-00-00 7011382 VI 1 XII 1
4 HI-SPEED SAWING MACHINE 211-05-00-00 1075 VI 1 XII 1
5 PF SPINDLE SANDING MACH. 211-08-00-00 363121-1 VI 1 XII 1
6 SPA DISC SANDING MACH. 211-10-00-00 436521 VI 1 XII 2
7 ARBOGA DRILLING MACH. 211-13-00-00 3601 VI 2 XII 1
8 DUST COLLECTOR (CENTRALIZED) 211-16-00-00 VI 2 XII 1
9 NESSIE SAND RECLAIMER 212-01-00-00 SR-5 VI 1 XII 1
10 GIETART CORE SAND MIXER 213-12-00-00 9457 XII 3 VI 2
11 FURAN SAND MIXER 213-16-00-00 TK-640 I 1 III 2 VI 1 XII 1
12 CRUCIBLE TILTING FURNACE 214-03-00-00 83920 XII 1 VI 1
13 UNIVERSAL OIL FIRED FURNACE 214-04-00-00 6669 XII 1 VI 2
14 VIP POWER TRAK 214-05-00-00 I 2 III 1 VI 2 XII 1
15 MST COOLING TOWER 214-11-00-00 MST I 2 III 1 VI 2 XII 1
16 PEDESTAL GRINDER 440-60 VI 3 XII 1
17 SILICON ARC WELDING 215-06-00-00 1406 VI 3 XII 1
18 SAINTO SHOT BLASTING (BIG) 215-07-00-00 3665 VI 2 XII 1
19 IHI WAX MELTING TANK 221-01-00-00 MFD1984 VI 2 XII 2
20 IHI WAX CONDITIONING MODULE 221-02-00-00 9484921 VI 3 XII 3
SHIU-RONG DOUBLE INJECTION
21 MACHINE(HORIZONTAL) 221-00-00-00 SR-366A VI 2 XII 1
22 IHI WAX INJECTION MACHINE(VERTICAL) 221-03-00-00 M4-2 I 3 III 3 VI 2 XII 2
23 IHI SLURRY MIXER NO. 1 222-01-00-00 63-CH17A VI 3 XII 3
24 IHI SLURRY MIXER NO. 2 222-02-00-00 63-CH17B VI 3 XII 3
25 IHI FLUIDIZED BED NO. 1 222-03-00-00 VI 4 XII 4
26 IHI FLUIDIZED BED NO. 2 222-04-00-00 VI 4 XII 4
27 IHI CENTRALIZED DUST COLL. 222-06-00-00 841005 VI 4 XII 2
28 Shiu Rong DEWAXING MACHINE (Boiler) 223-05-00-00 SDM3-1 XII 1 VI 3
29 Shiu Rong DEWAXING MACHINE (Autoclave) 223-06-00-00 SDM3-2 XII 2 VI 3
30 IHI SHELL FIRING FURNACE 224-01-00-00 FS591201 VI 5 XII 1
31 SPEANSTEAD SAND BLASTING 225-02-00-00 SYBCAP VI 5 XII 2
32 PORTABLE VENTILATOR 230-08-00-00 SDM3-2 VI 4 XII 2
33 OVERHEAD CRANE (5tons) 250-01-00-00 5 TONS VI 5 XII 2
34 OVERHEAD CRANE (2tons) 250-02-00-00 2 TONS VI 5 XII 3
35 GENERATOR PERKINS 250-08-00-00 76 KVA I 5 III 4 VI 3 XII 4
36 SULL-AIR COMPRESSOR 250-12-00-00 VI 3 XII 3
37 CHAMBER FURNACE 27-1 105-08-00-00 26185 VI 3 XII 3
38 CHAMBER FURNACE 27-2 105-09-00-00 26727 VI 4 XII 4
39 THERMOLYNE FURNACE 105-04-00-00 VI 4 XII 4
40 CHAMBER FURNACE 105 105-10-00-00 VI 4 XII 4
41 FUMEHOOD 406-04-00-00 XII 2
42 GRINDER POLISHER (IMPTECH) 402-03-00-00 30 DVT VI 3 XII 4 XII 2
0 43 GRINDER POLISHER (EXTECH) 402-04-00-00 LABPOL 8-12 VI 3 XII 2
44 KEVEX SEM K550X-443
5500703-
45 KEVEX EDS 0572533 VI 3 XII 2

PREPARED BY : LEGEND : F - Frequency W - Week No.


MELCHOR A. GAMILLA I - Monthly III - Quarterly
SRS II
VI - Semi-annually XII - Annually
APPROVED BY: NOTED BY:
MA. GRACIA M. PERALTA RODNEL O. TAMAYO