Professional Documents
Culture Documents
Time Line ADDplatform
Time Line ADDplatform
SAPI PLATFORM
Number of Day
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26 27 28 29 30 31
ADDITIONAL A/E CAT 3412 AWB BAYU LAUT PROJECT
SAPI PLATFORM
DO
Plan
Number of Day
No Description Man Power
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 Shipmet Engine BMB 10
2 Shifting A/E to Position Crews 5
3 Installation Crews 3
NE
Wiring 2
Termination 2
Running Test & Load 4
Action Plan
Number of Day
No Description Man Power
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 Shipmet Engine BMB 7
2 Shifting A/E to Position Crews 5
3 Installation Crews 3
Wiring 2
Termination 2
Running Test & Load 4