Professional Documents
Culture Documents
D-111 Bridge Control Manoeuvering Console Instructions
D-111 Bridge Control Manoeuvering Console Instructions
Action: Post
Note
Post this near Bridge Manoeuvring Console.
All deck officers must know the below instructions.
Chief Engineer to carry out the training for Deck Officers explaining the ship-specific procedures.
Important:
In case it is required to change over the control to Bridge from ECR, while the engine is
running, the telegraph lever and governor speed setting should match with the Engine
Room prior changing over. This can be seen on the telegraph and the speed setting air
pressure gauge in ECR.
D/111 BRIDGE CONTROL MANOEUVRING CONSOLE INSTRUCTIONS
M.V AM GHENT 23-Jul-2019 Rev 0 Page 2 of 2
9. Others
Other alarms and indication lights are for SYSTEM FAILURES, which are self-explanatory.
In case such alarms activate, inform E/R or Duty Engineer.