Today we cut all floor joists and prepared them to be glued next class.
Date: 12.5.2022
Today we worked and completed the floor joists as well as starting the sub floor. We also
finished wall number 1 and 13 as well a 4 and we are still working on completing wall 17.
Date: 12.9.2022
Today we worked the subfloor and walls 15,16, and 8. We also cut pieces in
preparation for future walls.