000-FS-007 Rev 0
CHEMICAL FEEDER
420-FE-001
LEAN ELECTROLYTE
HEAT EXCHANGER
No. 1
420-HX-001
HOT WATER
STORAGE TANK
420-TK-005
LEAN ELECTROLYTE
HEAT EXCHANGER
No. 2
420-HX-002
HOT WATER HOT WATER
LEAN ELECTROLYTE PUMP CIRCULATION PUMP CIRCULATION PUMP
500-PP-001/002 No. 2 No. 1
000-FS-009 41 420-PP-007 420-PP-008
ELECTROWINNING AREA
000-FS-009
ELECTROLYTE
RECIRCULATION TANK
500-TK-001
44 000-FS-009
LEGEND
MAIN PROCESS FLOW
AUXILIARY FLOW
INTERMITTENT FLOW
EQUIPMENT PACKAGE
ORGANIC FLOW ISSUED FOR
CONDENSATE PREFEASIBILITY STUDY
DO NOT SCALE 11x17 DRAWINGS
REFERENCES REFERENCES REVISIONS REVISIONS
DWG. NO. TITLE DWG. NO. TITLE NO. DESCRIPTION BY APP'D DATE CLIENT NO. DESCRIPTION BY APP'D DATE CLIENT SCALE: NONE DATE TRAPICHE PREFEASIBILITY
ARCHITECTURE
- DESIGNED BY HD AUG 18 PROJECT NO. M3-PN180149
CHECKED BY
FLOW SHEET 000-FS-007
PROJECT MGR
CONSTRUCTION MANAGEMENT TANK FARM REV NO. DATE