No. CE/EAP/ABP-II/PMC/RFP/ICB/17/2022/46 Date: October 14, 2022
CORRIGENDUM-3
Project- Assam Bridge Project Il: Project Management Consultancy Services for
“Construction of 4 lane Extradosed PSC Bridge over the River Brahmaputra connect
Palashbari and Sualkuchi including viaduct, approach road, river training works etc”
Ref: i) REP No.-CE/EAP/ABP-II/PMC/RFP/ICB/17/22/17 Dated 29” August, 2022
li) Tender Ref. No. CEEAP/ABPIIPMCRFP/ICB/17/22/17, Dated. 29" August, 2022
iil) Corrigendum No.1 dated 23" Sept, 2022.
iv) Corrigendum No.2 dated 14" October, 2022.
Consultancy Services for "Project Management Consultant” under ABP-II
Addendum to the RFP:
The replies to the Pre-bid queries/clarifications is enclosed as Annexure-A and Annexure-B for
information to the prospective consultants.
i
:
realist
Chief Engineer (EAP), PWRD, Assam
ARR&TI Complex, Fatasil Ambari,
fae — Guwahati-25
aANNEXURE-A to Corrigendum-3
‘Tender Reference No.CE/EAP/ABP-I/PMC/RFP/ICB/17/22/17 Dated-290h August2022
ach roads, river traning works
Pre-Bid Minutes (Querties Vs Replies) of PMC: Assam Bridge Project I: Project Management Consultancy Services for “Construction of 4 lane Extradosed PSC Bridge over the River Brahmaputa connecting Palashbari and Sualkuchi including viaduct ar
‘ete on EPC mode
s
Ne
eterence
‘Clause as per mt
onan Clason equred
Careaton/ Mosfiation Expansion
Page 2, Cause 3 or
felsewhere
Letter oF invitation
|This Expression of Interest (EO!) cum Request for proposal (RP) i invited from the eigble
| consulting firms/company from the NOB member countries published in web ste:
We request the Authority to kindly allow Consultant to bid fortis prest
Project irrespective of their Nationality
‘aternatvely
[No modification of this clause.
a |hup:www.ndb int>about-ussorganization.members only In case ofan International Agency/Bidder, the bidders shall be allowed to bid
fhrough thee Indian subsidiary and utilize the experience of their
lparent/eroup/holding compary.
jause 3.4 iv OPage No. 14 |if' same CV is submitted by two or more firms in the technical proposal ofa same project, zero _|We request the Authority to Kindly allow individual Key Experts to participate in [The contents of the clause remain unchanged,
2 \marks shall be given for such CV ‘more than one Proposal
Tause 5 Proposal
levaluation; Sub- clause 5.2
[page No. 17
'Sub-citeria for employment with firm mark
i. Permanent staf (those already employed with the frm prior to one year from the month
(during which this notice is isued) = 5 marks
li. Retainer/non-permanent staff = Zero marks
(Gient is requested to Kindly amend the clause as specific experience In North-East
Region of India
[The refered cause 5s elated to Permanent Stall ofthe consulting
firm/eompany only not for specific experience in NE. region of India. The
contents ofthe clause 5 remain unchanged.
[Qualification of key
Personne;
lenciouser 8 Page-65
'Senior Bridge Design Specialist
|He should have experience in as least 2 bridge project having cable stay/cable
Iuspension/extradosed span superstructure under Project Management/Construction
'Supervision/Authorty Engineer in developed country.
|We request the Authonty to Kindly consider experience in india or abroad in place
lof "developed country"
Experience in developing countries will be considered
[Qualication of Key
Personne;
lenclouser -8 Page-65-75
[Similar capacity of Key Experts
[The "Similar Capacity” of Key Experts are not specified other than Team Leader cur
sr Bridge Engineer
[The “Similar Capacity" of Key Experts as specified in Note under Qualification
lof key personnel [Page 65} of RIP shall be applicable forall 1S Key Personnel,
Page 6, cause 13.5
The Consultancy Frma/ Companies should have minimum Experience of providing Construction
Isupervsion/Authorty Engineer/independent Engineer/Project Management Consultant for at
least one similar nature of workof4/6 (or more) laning road projects of worth Rs 1600 Crores or
lequivalent USD inthe last Leas. (Road Project means, Roads/Highways/Expressways with
lvidges)
\We request you to modify the cause as below
‘The Consultancy Flrms/ Companies should have minimum Experience of providing
(Construction Supervision/Authority Engincer/Independent Engincer/Project
IManagement Consultant for at least one similar nature of work of Elevated Metro
Rall Project or 4/6 (or more} laning road projects of
worth Rs 1600 Crores or equivalent USO in the lst
|1oyears. (Road Project means, Roads/Mighways/Expressways with Bridges.)
[No modification ofthis clause.
Page 6, clause 13.4
|The ConsuRaney Firms/Companies should have minimum experience of providing Consultancy
services in Designing of atleast one Elevated Structure of length notlessthani500 metres with
(viaduct, superstructure of which shall be of precast segmental construction in the last1Oyears
(€levated structure means, bridges, elevated
foxpressways/ flyovers, urban interchanges and elevated Metro rll); and
|We request you to modify the clause as below=
‘The Consultancy Firms/Companies should have minimum experience of providing
{consultancy services in Designing/ Design Review/proof Checking/ Feasibility study
lof atleast one Elevated Structure of length notlessthan1500 metres with viaduct,
‘superstructure of which shall be of precast segmental construction in the
lastioyears. (Elevated Structure means, bridges, elevated expressways/ flyovers,
lurban interchanges and elevated Metrorail);
No modification of his cause.
gae No. 54 Clause 53,
{TOR
i The Proje Wanaperent Constant shal compe such review ad ards conmonsfObenaiion Te
theron the Contraco within 15 en) days recep of such Drawings provides, however thatin ease ot
Hobe or Sec estar oan as n pa commen sa se te
ormiy er thera of such Orewings wth the Scpe of he proj ne speietons and standard fang which
pena of Rs 25,000.09 shal be ehargeby te Employer.
“ie Proje: Management Constant stall re the aval Assurance ln sate by he Contact’ and shal
wes cormentt the Contractor within perio of 2 wen one) dye tating the modeatons, fay,
ue theret alg which 3 pera ofS 25,000.06 shal be erage by me Employer.
‘he Proje: Management Contltan tal review ne manly roses report frished by the Conratar snd
ends comments tereon tothe Author an the Carat tin (sve) da of eet of su Fer Tang
cha penalty of Re. 25,00000/da tall changed by the Cnployer
‘he Projet Management Constant stall comalete the ele ote methodology proposed tobe adopted by the|
ratr for excring the works, an convey its commer tthe Coiractr within period of 7 (sven yas
he date of rexpt ofthe proposed methodology rom the contactor ang which penalty of
5 000.0/ay shal be charged bythe Employer
The penalty s on higher side and there seems to be numerous penalties with will
[put the consultant in jeopardy. We request you to reduce the penalty to 5,000/ day
land further puta cap on overall penalty.
INo change to the clause
Page 9, Cause-6
{ast date of submission of RP Document (ke, Bid Due Date) -14:00 hrs on 15-10-2022
|We request you to provide aleast 3 weeks’ time for submission after replies to
lqueres are issued,
[Extension of Time Tor submission of proposals, Fany shall be dealt seperately
idders are requested to verity the website forthe latest information related
lo this RP,
Page 1of 13,Fe
eterence
‘clans 2s por
Contant’ Creation required
‘lritetion / Moatation expansion
0
Point No.7, Page NoS
The intending consulting frms/company shall have to make online payment through ETender
portal for a sum of Rs.50,000/- (Rupees fifty thousand) only towards the cost of RFP document
processing fees (non-refundable) (including all taxes) on the date of submission of their,
[proposals
[We request you to reduce the Tender fee amount to Rs 5,000/- which is s per the
[standard norms used by the Ministry forall MoRTH, NHAI, PWD, NHIDCL projects.
[No change to the Tender Fee, Regarding submission of cost, Kindly visite
jporal for Corrigendum already published on 23rd September, 2022,
Point No.8, Page No.5
JFhe Applicant shall submit as part of ts Proposal, online bid security of Rs.7,50,000 [seven aks
‘thousand only in the form ofa unconditional Bank Guarantee Issued by a Nationalized/
[we request you to reduce the Bid Security amount to Rs 2,00,000/- which is a per
Ihe standard norms used by the Ministry for al MoRTH, NHAl, PWD, NHIDCL
No change to the Bid Security amount Regarding submission of Bid Security,
kinaly visit e-portal for Crrigendum-1 already published on 23rd September,
u ‘Scheduled Bank located in India (as per the format specified in Appendix N of this RFP document-[projects. 2022.
‘the "Bid Security"), valid for 45 days beyond the validity ofthe bid
Point No, Page NoS [Bid Security of IV shall be n the name of the IV that submits the proposal. Unqualified bidders|Kindly alow in name of Vor Lead Member. No change to the clause
jwould be informed regarding their non- qualification, without any explanation and thereafter
2 {sid Security would be returned unopened after the evaluation of the financial proposal and
‘signing the contract agreement with the successful bidder.
(Cause No.13 ‘The lead partner must full atleast S10 of eligibility criteria oF 13 (a) &[@) and other IV partner _[since, Joint fulilment is allowed for A), C), Isidders are requested to verify the e portal for latest information vide
[A Eligibility Criteria for {should ffl atleast 30% of eligibility criteria at 13 (a) & () of table in para (A) above. Each _|D) and &), we request to consider Joint fulfilment for 8) also. [corrigendum -1. published an 23rd September, 2022.
lsole applicant firm Point [partner of )V must meet the requirement of eligibility criteria as mentioned at 13 () In para A
413 |no. 8) labove. Also, the lead partner and JV partner jointly should meet the eligibility criteria as
Page No. 7 mentioned at 12(a), (] & (4) of table in para (A)
labove.
(Clause No.13 (However, consortium shall not be alowed in any case Please dary, Tint Venture partners are limited to 2 (wo)
)Eligity Criteria for kindly verify lause 12 of Section: Information to Consultants. For1V
114 bole applicant frm Point (consortium with mare than two members of the JV isnot allowed.
io. 8)
Page No.7
(Cause Nos iThe Applicant whether a sole Applicant or @1V may include an Associate frm/company. [lease reconfirm associate ls alowed since ths ls not mentioned n Clause 12 of |The Joint Venture company of two partners may submit bid in Association of
[A eligibity Criteria for {credentials of Associate fem/company, except key personnel if any wil ot be considered for Page 6 lanother Firm.
‘sole applicant firm Point evaluation. Maximum number of key personnel ofthe Associate frm during the RIP proposal and [The condition of association wil be limited as mentioned inthe clause.
35 tno. 8) jin implementation of the projects limited to 2 (two).
Page No
[Point No.1i Page No. |The total time period for the assignment as Project Management Consultant willbe for 63 [Please reconfirm that 3 months is for Review of DPR [| months Yor review of the cost estimate based on current market prices at the
imeonths (3 months for DPR, Design review, procurement of EPC contract; 48 months for time of reviewing, outline drawings design ofthe DPR, technical specification,
16 [construction period and 12 months for Defect Liability Period preparation of EPC bidding documents including Employer's Requirement
|with reduced manpower). including O& M Reguicements etc based on DPR of the project.
Page 23 For each of the above marking, the marking wl be done on scale of 100 and willbe assigned [Please explain the marking scheme. {Kindly refer to the Detailed evaluation Report annexed at Annexure’ of the
\weightage as IP document fr the marking system," For each ofthe above marking, the
ay Iabove. ‘marking willbe done on scale of 100 and will assigned weightage as above" is
deleted, |
[Detailed Evaluation of key Team Leader cum Sr. Bridge Engineer Is this Is Bridge postion we request you to add Bridge projects also as below: Detailed Evaluation Criteras
[personnel \) Total Professional Experience in Highway Project ‘Team Leader cum Sr. Bridge Engineer Modification is as under-
lit Experience as Team Leader/Senior Resident Enginees/ Project Manager or similar capacity in |) Total Professional Experience in |) Total Professional Experience in
Highway project Highway/Bridge Project Highway/Bridge Project
‘Experience as Team Leader Senior Resident Engineer/Project Manager or similar capacity ini) Experience as Team Leader/Senior Resident Engincer/ Project Manager or sirilar i) Experience as Team Leader/Senior Resident Engineer/ Project Manager or
8 construction Supervision /IC for {capacity in Highway/Bridge project similar capacity in Highway/Bridge project
latieast two Major Highway Projects. ii) Experience as Tear Leader/ Senior Resident Engineer/Project Manager or _ il) Experience as Team Leader/ Senior Resident Engineer/Project Manager or
‘similar capacity in Construction Supervision /IC for ‘similar capacity in Construction Supervision /IC/AE/IE for
atleast two Major Highway/Bridge Projects atleast two Major Highway/Bridge Projects
[Detailed Evaluation ofkey [Team Leader cum Sr. Bridge Engineer [We request you to consider as below [No change to this qualification requirement under tis clause. However,
lpersonnel [Tear Leader/Resident Engineer/Project Manager or similar capacity of at least one experience in developing countries will be considered.
|cTeam Leader/Resident Engineer/Project Manager or similar capacity of at least one span of 125|span of 100-125 M of cable stayed/cable suspension/extradosed Bridge in
19 lsS0 Mof cable stayed/cable suspension/extradosed Bridge in Construction Supervision of [Construction Supervision/ Design/OPR of Highway Project in developed /
Highway Project in developed {developing country
try
[Detaled Evaluation ofkey [sr Bridge Design Specialist |We request you to consider as below [Detaled Evaluation Criteria
lpersonnel ib) Experience of Bridge Design/Review of at least 02 Construction/supervision _|Sr. Bridge Design Specialist (bis modified 2s below:
20 'b) Experience of Bridge Design/Review of atleast 02 Construction/supervision projects in project in developed/ developing country also. [Experience of Bridge Design/Review of atleast 02 Construction/Supervsion of
(developed country
[Project in developed/developing county.
Page 20f 132 alerece cae spe Comat’ Ciena Ctartenton/ Mostetion/ Banton
Detated Fratton of key [Resident Cum Cable Stayed 6rdgeEngheer We request you considers Below Residant cum Cable Stayed BigeErineer
an evonel Eh experience of” years in sma capscly of major cable stayed cable suspension extradosed ] Experience of years in simlarcapacty of mor able stayed cable suspnsin/|No change to the qualfstionrequvement
Iriges in developed lsradosed bridges in developed /develoing country
Jeunty
Deiaed Battin offeror Environmental per lve equest you to cose highway Boje aon the TO yeas oTexpeence. [enor Envronmenta Exper
personne! fi emvronmertal exper having experience of not less than 10 years inthe fed of ver bridge |i Environmental Expert having experience of not ss than IO yenrsin the field of |W change tothe qualieatoneterla
Proje etc and hove aecuat towed in oqvatc eon. fiver ride bighway project, ete and have adequate knowedgen
EJ Jaquatic ecology.
Betaied Evatuatonofkey”|Geoteh Gu Foundation Sper i euesk yu Yo CORTE ge engin OF BOOT ewe Seoiec-Com Foundation pert
23 personnel In) Experience of Computer Aided Foundation Design of Bdge length more thant km. No change tothe quaifleation teria
KecrowT [Due Dae Tone & Patel le request he Ger to provide alent? dys tne for PyscaT submision aie odication of Case wo 22 23 Seton Page BE
24 Posen. 883 online submision. ard contes
cause no. 22.823 (ate of submisin ion or before 1:30 rs on 15/10/2002
ETON i case Tori enpeience dain shoul be subiied a per Hague Converon To which dias doa Sinatra cena oefan No change os Sae
age No. 13 nels Translation Version and duly apostle by concemed Tange ae tobe anfted and then te translated version supposed to be
Jdauce no. 3.400) Emtassy/ Consus, nestled by Authorised agencies in the County proto notarizton Al
International rms are folowing this procedure fr ther roposasin ind.
_ owever,ndon embassy/ Consulate authentication should be made mandatory
ony for document in language of countries that are not signatory to Hague
ecmvetion
ease confirm
rent ae average anna ver The mimo requrement Rs 75 Gres However, Sma ae tang awarded [Corecon=
26 Paseo. [i tess than Rs. crores or equivalent USD-0 Kors. 70 crores or eauvelent USO ad above Ihe minim requirements Rs. 75. or above orequvalert USD,
SLNo.2 liv: 70 crores orequvalent USO and above-3 request you to pease ecty the same
nue Icnstraean SopenSion/ Authority Engineer Independent Engines ojec Management apart Tom these Bees, cable suspension idee rasa mentonedia the RIP —aronire of RF maybe read as “Construction Superson] AatBorRy
Pave Wot Ionaitant a xtradosed/ Cable Stayed PSC Bridge consisting of minimum spanof 135 mtsin [Dato Shee. Cpner/ independ Engnet/Project Management Corsutantfa |
Sno. asin proectin the lst 10 years. we veqvest yout nlde cable suspension tigen Annexure aswel since such fntrodsed Cable toyed/Cabe Suspension, PSC Orie consisting of 35 mts
2 land ridges are more complex than eeable stayed exradosed bridges andi wil ina singe pojectinthe ast 10 year.
bata sheet Jrsureporipaton of ms having expertise in supervising such projects
lste no. 2 ease cont
[cawse's2, 51. No.3
Famenuret [rojak rears Rand] Tiga Eaprsiwap] Wig WIRE Consng oT evadase] cable We request you orclode cable suspension ages cteron sce such annexure1 S.No, 3 of HP may be comected and Be read as
lace no. 2 stayed structures cross perma ers /sesfceets) rec re more comples hana able stayed entrdosediriges and twill
Kno. lrsure paricipeion offs having expertise nsuperdsng such pret. he Consultancy Frms/Companisshoul have minimum expeinceot
fine ease confirm roviinecorstctonSopesson/authoryEngncer/ndependent
ag ona Sest Eneneer/Pojet Management Constanta projet consiting of Extra
Pave No. 23 ose/CabeStayedeate suspension PSC Behaving at ast neni
[cause 32,51 No.3 xe dosedcabe stayed span of135 M in singe projet in ast 20 years.
[rojeameans Roa vigharey/Expressway th ridges acoss pete
fiver sears)
|
one {eae Sarre means lated wxpresiways vos ba ecranges and levied Apart Fam ths, Brides ove iveaea/eeea] ao meiioned in the RFP (Sata |The Constancy irms/Companiehoul have minimum
age No.2 ev ris) [sree lexperienceofprovang Construcionsuperason/Authrty
b.no. 5 le request yout ince Bridge over ever/sea/rees) in Anoexure 2s welto ngneet/ndependent ngree/Pojett Management Constant of atleast
. ensure partcpation a fms hving expertise n supers such projects, lone HevatedStructre of engthntlessthant500 miswth
2 [pata sheet Pease conn oduct supertructureotwtich shale of precastsegmental construction In
race No. 23 Ie as Overs lentedStctuemeans, elevatedxoresevays fyover
Jaws 52,51 no. troaninterchanges and elevated Metro vals Bridge over verseacreet}
Prenel engring af ast one ClevatedSudtre a engi so ls han TSOO mvs wih wadoct” |The imam veqlement feng of Elevated Siructure 1500 is, However, 3 Annexure, SLG oF RP may be reed and earered as
lage No.2 Jordon with superstructure of precast segmental earstructon nthe lst 10 years. Iran ore beng awarded for Elevated strcture of length of 1000 mis or mre. i Elevated Stace oflngth es han 1500 mts with viadt potion eto
Kuno.e [i eevated structure of length ess tan 2000 rs wi viaduct potion et. -0 i) elevated Sucre of length of 1500 nts or more with vad portion ee
ao bd [a Fevate structure of length of 000 sor more wind! portion et. -3 Request yout please rctiy the same. i
[ata seet
lage No. 23
fosse52 s.no.s :
Bop ayole
Page 301 13. Chiof Engineer, EAP, PW.R.D2) Ne coon pene Conant Caen oad lion Mostetn xpaon
Pare RIVER TRATaNG PERT or is poston P Degree Fyoloy Water evorcr aS. No.1 1.& ——[anerored
Page No. 28 ProesionalExpertence a ghway Project [perience a arlogat 51.2 being coniered. Therefore, we request (River Training Exper:
si [sta ou tony cosiae oiperene af ge ration & Dar, Water sours nd [nl rea and correct SL 2) of AMenure of RI as below
Mood cnet management roel as wel unr Pessoal fperence. ['rotesonal perience inHihway caning of major
bapes/Bedgfirigaton/ater Resource Project”
|Annexure-t [RIVER TRAINING EXPERT [Piease define “Major Projects” as mentioned under this criterion. ‘Annexure of REP
Pe No. 29 [Dperence of ver vatingof atleast ree major iets fiver Ting ber
sa [srt 20) Kind read ond covet L.2(a) oF AP as below
Petperence of ver alin wer of teat three malo projects of
Iehwoy/onagfiiation OAM ater Resource”
|Annexure-1 PLANNING AND CAD EXPERT ~ ia the RFP, Experience in Developed Countries for similar project is mentioned [Experience in developing countries will also be considered.
Poe Wo 31 Experence in develoned/ developing Counties for sar pojct, der Preferential Qualcaton
St no.2s) le reques you to Kil conn if Experience of Developing country wil be
aa lenetosune Konsiered for geting mars uner ts citron,
Poe Wo. 73
Panning and CAD Expere
feared pc AND CAD ERPERT le under Wat Expres of 5 Projet wi aa be oad nde is RPO GTN Project wi ao be cond
aa {rage to. 31 [spereneo Primavera CPM/PERT/COM, [eterna the some bmenoned t No.5 under esentl Qualico’ nthe
ste 20 Enclosure a the AP Page No. 73)
Famers ei Enver pert ini cosiar asia Projects wa undo Ts Gaon ac, rere fascia Proje wil ao be OPIS.
3 [rage no.22 Profesional Experience a Roa Bridge Projects Emrormentl Epes wort. on hese projects a wel
ino. 2
RfP page 65 Cl. 17
17. Training Isa specific component under the assignment. The Consultant shall make necessary|
[arrangement for international training/exposure trp tothe PWD Engineers, The Consultant shall
We request clrent to inimate the tentative names of counties to make necessary
[arrangement for international traning/ exposure trp to the PWD Engineers so that
[Any technologically developed courivies may be considered in financial
lproposal. Preferable countries from Europe, South East Asia, Austraa
36 |provide for three batches of foreign international trainings/exposure trips to Engineers in [proper financial implication may be assessed for financial proposal.
{technologically developed countries
RiP page 6 13} He should Rave experience n at least 2 Bridge project having cable stay/cable suspension] |The experience required in Developed county. iis observed that similar cable stay [Experience of developing countries wil also be considered
|QUALIEICATION OF KEY extra dosed span superstructure under Project Management/Canstruction supervison/ Authority bridge projects are done in many developed an developing counties with best
37 [PERSONNEL SENIOR —_[Engineerin developed country in similar capacity 95 defined in Note above. practices. The criteria shouldbe relaxed to developed/ developing countries.
|BRIDGE DESIGN SPECIALIST
Section No, [Note [in case of on-going projects, the physical progress of work on the date of submission of [in ease of multiple evil contracts under one consulting assignment, weighted Employer's Cerificate willbe considered for physical progress of work on the
Information to Consultant. |the RfP shall not be less than 90%, which should be authenticated through an Employer's average of the physical progress of all the multiple civil contracts will be date of submission of RIP.
‘/ (certificate ‘consolidated to work out overall physical progress of the consultancy agreement /
[Page no. 8/ contract.
I) [For Ex. Let us say a Consultancy assignment (A) has 3 cil contracts namely X, Vand
Eligibility Criteria for sole respectively, and
[applicant frm (construction Project cost of contract X 200 Cr with Physical progress ~ 100%
8 [construction Project cost of contract Y -B0 Cr with Physical progress ~ 80%
[construction Project cost of Contract 2-100 Cr with Physical progress —70%
|Weighted avg = (200*100%+80°B09S#100"70)/(20080+100}
|=87.39%
[The consultancy assignment (A) is ongoing with total physical progress of 87.89%
[and hence shall not be considered as the qualifying project,
(Section No.t, IThe last ten years as indicated above means [As per current international practices, latest credentials should be considered prior [Last 10 years means FY 2011-12 to FY 202021.
Information to Consultant. |F.¥. 2011-42 to 2020-21. to the submission ofthe proposal forthe evaluation purposes.
ap [A Eat crea for Hence it is requested thatthe experience of last ten years prior to the proposal
Isole applicant frm
‘submission date shal be considered for the evaluation.
|We request the client to kindly consider our suggestion
Page dt 13
Khe wt=
2 PAP WARD
tosil Ambarl, Guwahati-25Se] meee ioe Cont Crores an oenin loon
Seaton Nos, B] Eig iter Tor partners case of ong or Rede on THT ee understand tthe woihag fH eB aed yt ea riba & 30% ral wart ar Corend pubertal on 238
Inomtono Consultant learner sabe lowed) shal be a nde: Rove tue the member shale apleblearss le iecel (eptaribe, 2022
i [tesono 98) 6) 8 (8 eatin the uiory
egy cetera fore ed pariner must ui at east 5% Felli teri of 23) & ad other .V parr
ateaplean tim, Poge tou fiat ect 30x of payee 13 8) & (ef table pur) above Each equsthe cent tokndy consider or sapeston
40 low o/ctauseNo-138|artner of lV rust as he eqienet fell eeiasmentoned at 13 ()gt8&
ove Ao tees purine’ ad partner ty sou meet he lly eter a
Inenionedat 2), 0 &
[tof tale pre (8) above Led patie ofthe 5 must net he teria 13 eae gra
[above Honever, consortium sal note llowedn ayes
Secon T= eration oe Conan Fs Compares ol have imum experience of rong Consnaion incase nappa varicatedin he Wop a aN We eh ETB FeV |) Sale Ym eee owen
Cnaitanes Pope No [Superson / Author Eng’ / Independent Fognce jet aragerent Constant oa esto mes prof! cot ter 16001 mating tat 3200 cart OF poe bi |) Lead member mst meet rnin 5% cf requirement
fer/Parano.) Cause No. leas onesntorneture of work of or morel rng oad projets of worth Re 1600 rove case of sole pcan ony single eet of 680 Cpa ot wl sui he i Other member must met minum 30% othe eqremert
ae) equalentuSDin the st 10 years. Road Project meno, Reads ighwaye/Exgreseuny requirement IM) Al member combined mst mee the requirement
een
Pe |We request the client to kindly consider the minimum sharing of 50% for lead
note Pore on 30% or pater, an conbiedly the] ee ou 200 Graft
ach prner of V st meet the rearerent felity tera Kost s.r fo perpen the dng prone |
we request th cnt ony coe our get,
[Section- 2:- Letter of For Key Personnel eg, Team Leader, Resident. cum Bridge Engineer, Cable Stayed Bridge Expert, [1. Pl explain what is understood by “such projects” and what all projects we need [Annexure "Detailed Evaluation Report™of RIP willbe the basis of evaluation |
[rvtaton‘o eile \ighwoy Desig nee and Rood afer Expat tte Conutars sould pretercnddstes tec ropes
Conutants, Cause faving experience on such Projects, Such personel hal erated her thn the canddbter_conierunder hs eb
sa [pam ragei2 hovng seh |
expt ata |. cent has akeny povided the deta tech evaluation whch sanesed
Vamerure 1 ther any rhe nama certo erat these ey
pects
TRCIOSURES, EA LEOER COWS. BRIDGE EGER rar coo nodes Tiny ead fan a SS oF Cres NO?
uateat onorKey | sDetied valuation rer (Tear Leader cum Sr. ge enee) B Onbena ef Constant: Team LeaderResdent Engineer under Constrcon
personnal, Doge 65 & Spero
Detalad Evolution Crea. Team Leader Resident Engineer rojet Manager or sir capacity of atleast one span ot _ |b on teal of Contactor: Projet Manager Conrcton/ Consructon |
fas aso rca styedeable suspension /enradosed eigen Cosracon superison of [Superson
2 Nehrway Projectndevtoped county
le eaves the cent to conte Selor be Enger 5 part of sir capacty
hwo roe -0rmarts Ds the eperence to be pronded ude eam ade cum Brge ener
nt rjc =0 marks Ince perce cr igs Engine
add 2 mart entrar ac ational rjc sb to maximum 35 mars
le request the cent to tnd conser our sgt,
PPENOKES. Fora Caretam Vis (6 For Proposed feo Sa Kini caiy wheter an underaing om the exper wile walled ie Eaves Ce anda
Page 40 ett) eperence Crates rom Employes tobe athe mando, freevper
- |doesn'’t have some of the experience certificates from the employer. We request
the ctem tony cry he same
ICSFECALCONOTIONE [6:16 The amour payable olen arene EN 5. Since constant ave to propose ogy apes wih developed county or anverlon TURD NR te at of onveion shal be7 (wer days
or conraacr, The ceingin leary perce tk eqvestd tat remuneration amount rl be pad accord in USO [etre te date ad tie fbn of donne
lnwsee 62.8 2th) The roe for oregano Persone are se forth in Append GH eat the fore exper Kindly cof,
4s |oaseaee 53a) he orig rene shallbe incl uency.
tos oe at) Remuneration fr fori Persone sabe ain lc carey and remuneration fo 2. the raiens le ade oly Lc caency, hen we equ the cent
fos Pesonel hal be pid nal ure dete the eran at, eset ide propove USD curency agaist foreign
poston Kel cot,
eer [7.2 The Cosa sha aang Wing apa ov Pile Procurement NepoTaVon Tiny conn owl Set Ws aa odggaig ci tvards we ann |The Trainee nding GST charge of the ste al be bore by he
Heme ofetrence/ pubic Procurement Contract Monegan orn te Pocvemnt Tear compring of inte reputed ston na Constant ter expenditure sabe es perth State Gove cea Got
Peges2 Cause1?2 [engines of PRD The Consulta sal prepare orang ln for 3-4 day warn inoatches {We request the cent only arty he sae roms
1* for 20 Engineers in the reputed institution eg Administrative Staff College of India, Hyderabad,
Inca Nationa stitute of nan Magee, Fava, nad soon
Scan Trarma ont Te nen Osan eTcompary al ave To mak onlin payer ough E Tender here sears navraly reevEng Te CO of RFP doce eo Be ply he rw te por ar raion CoVerdunr was published on Bd
Consultan Page. porta fra sum of 50000 Rupees ty hosed) nivtonrasthecostot re eatenbe, 2022 thse
ou? fr document processing es (eet) Falconry wl raved to reper an [onthe etener portal the ost of RP document oes enone
S he web. ete cero
|(0} but as per the RFP, the cost of document fee to be paid by the bidder is INR
5.000 oe
we request the cert trl cant the same
Page Sof 13
RpFe]
eterence
clause a por
(ccaton / Moafestion / xparation
a8
Section-l (information to
(Consultan ts/ Page no. 5/
(Clause 8
iThe Applicant shall submit as part of ts Proposal, online bid security of Rs 7,50,000 (seven Takis
lity thousand only in the form ofa unconditional Bank Guarantee issued... inthe
|name of the JV that submits the proposal. The Bid submitted without Bd Security will be
‘summarily rejected.
[There seems an anomaly regarding the Bid security (EMD] to be paid by the bidder
[son the e-tender portal, the cost of aid Security tobe submitted by the bidder is
Imentioned as Rs. zero (0) but as per the RFP, the cost of bid security to be paid by
ithe bidder is INR 7,50,000
|we request the client to kindly clarily the same.
Kindy vist the e portal or aifiation. Corrigendurna was published on 23rd |
‘September, 2022 inthis regard,
“9
ection (etter oF
Invitation)
/ Page no. 19/ Clause 6.7
INEGOTIATIONS
15.7 Replacement of key personnel shall be considered only in unavoidable circumstances. In no
(case more than three replacements of key personnel shall be permitted during negotiation and
in such cases Consultant and such key personnel shall have to submit affidavit to the effect that
sting te pero of arent sted pare of Seton
- the partners shall be debarred upto ane year for Employer's consultancy projects
its observed that Para 8 of Secioni referenced inthis Causes rested to 1G
‘security and 's not relevant to replacement in any way.
“The typographical error "Para 8” of Secton-| may be replaced with "Para 2 of
‘ection-iof this RP.
Section? (letter of
Invitation)
Page 19/ Cause 6.7
Iepaceman fay personnal sal be considered anys uravlaleSreumslande,n no care were tan ee
feslacenentsoFkey personel shal be ported during negtiasonandin such exes Canaan an such Key
fersonna shel have to submt afidavt tothe eect hat during the peri of aignment spate pare Bot
Eton, the replced key personnel sa not be professional employed anyerein Erployer’s wer, Employer
lal not futher conser CV of uch key personnel rel or nde er ano is pojecs or this perio. The
fecuctio in remuneration of such replacements shal be Shane 10% for 2st -eacement and 2nd replacement
fesoecvely wthin ay pare fbi Incase curing negation hel within vat pard of be, more nan tw
[placement are sought byte constants hs propa sal be considered 3¢ Non erponsv. in such cae the
[rtincd score of rerainingteincally aii rs meting the non-anfit cnaiton sabe evaluated to
rive sew Hn ceding interaction wih he ey personel athe ine of nepotition is found ha the ey
fescnne ropceed i unsuitable forthe asgnment poston, he rapiareren by aqulent or eter sta be
lrovided by the cnsutant. The Key personnel wn such un stale CV sal nt be considers In ay future ds fo
fst poston fortwo yor No dedueson fr such replacement who are nt found sutabie during interaction shal
Ie made inne eventuality tat im
Iecomes nonesponve, fr te tid time, due tothe action af replacements more than Ze personel during
Jegoiotion, te frn ad its onan V partners sal be deboredupte one yes or Employers corsency
oie.
[Tis to Righlight that the dlause seems contradictory at two places in isl
Initially says three replacements are allowed but later on it says that two
replacements wil be allowed with penalty of 8% and 10% for first and second
replacement respectively.
[as 15 nos. of key experts would be required to be deployed, it's kindly requested
to allow replacement of 5 nos, of key experts with reduction of remuneration as,
below:
+ 8% for first and second replacement
+ 10% for subsequent replacements Kindly consider.
Il The typographical eror "Para 8" of Section may be replaced with "Para
(of Section
|i) Maximum three replacement during negotiation is permitted
|i) After that for 1st eeplacement reduction of enumeration @5% and for 2nd
[replacement reduction in renumeration @10% etc.
Isection5, Format for
Isubmission of Financial
ias per Financial Proposal Format, man-month against the position of ARE Highway is mentioned
laxta man-months, however as per Enclosure ~ A the same is mentioned as 2x24 man months.
Ikndly specify the duration and no. of ARE required under this assignment. We
Irequest the client to kindly clarify the same.
IManmonths ARE Highway is 2
IManmonths= 2x24 manmonths
2 projects -0 mark
2 Projects 15 marks
|Add 2.5 marks extra for each additional project subject to maximum 20 marks
ingineer/ Independent Engineer/ Independent Consultant/ Construction
‘Supervision are similar, hence requested to consider the project experience of
[authority Engineer/ Independent Engineer/ Independent Consultant/ Construction
'superuison will be considered under this head for evaluation
Proposal &
Isection 6 Terms of, Isconstruction period may be suitably adopted as per construction period of EPC contract. The
Reference/ Page no. _|man-month against each key personnel/ sub — professional shall be same as specified in
8 & Page enclosure A of TOR.
51
io. 66
lg Appendix C3:
{Breakdown of local/
foreign currency costs, &
lenclosure-A
[Detaled Evaluation Experience of providing consultancy services in Designing of at eas one Elevated Structure of ~ [As maximum mark under this Read Is 4 marks. Hence the evaluation criteria should. [Experience of providing Construction Supervsion/Authority
[Report/ Page 2 & Annexure |length not les than 1500 mrs with viaduct portion with superstructure of precast segmental |be revised as below: lengineer/independent Engineer/Froject Management Consultant/
|1/S1.No.5 struction inthe last 20 years (Elevated Structure means, bridges, elevated expressways / independant Consultant of atleast one Elevated Structure of length not less
hiyovers, urban interchanges and elevated Metro rails; 4 marks i) levated Structure of length |i Elevated Structure of length less than 1500 mtrs with viaduct portion ete.-0 _|than 1500 mtrs with viaduct portion of superstructure of precast segment
less than 1000 mirs with viaduct portion etc.~O marks Irarks. [construction in the lat 10 years, (Elevated Structure means, elevated
52 (i (i Elevated Structure of length of 1000 mtrs or more with viaduct portion ete.~3 marks lexpressways / flyovers, urban interchanges and elevated Metro rail);
(i) Elevated Structure of length of 1500 mtrs or mare with viaduct portion etc.—4 |) Elevated structures with viaduct portion et. les then 1500 mirs length
‘mas project -O marks
|We request the clint to kindly consider our suggestion i Elevated structures with via duct portion ete. 1500 mtrs length or more 5
Imarks
[Annexure of Detaled |Team Leader cum Sr. Bridge Engineer SI No. 2 (a}] \We understand that Major Highway projects means Projects consisting of Major [Experience under AEVIE/CSC/IC will be considered ae
[valuation/ Team Leader [ridge of 1000 M length or in ease of Metro Project, project costing more than [Authority Engineer
leum sr. experience as Team Leader? Senior Resident Engincer/ Project Manager or similar capacity in s.3000 Cr. le= Independent Engineer
lridge Engineer/ Sl.No. 2 construction Supervision /1C fr atleast two Major Highway Projects. Input should not be ess [OR Kindly define the term Major Highway Project (¢SC= Construction Supervision consultant
3 oun) 19 12 months | lalso, we would lie to submit that as scope and services of consultants of Authority |IC= Independent Consultant
Page 6 of 13,fe
-eterance
‘Clauses per nie
Constant’ Cafeation required
‘lartetion / Mosiestion Explanation
iEnclosure-8,
(qualification of key
personnel, Se. Bridge
Design Specialst/ Page 65
‘Se Bridge Design Specialist
Essential Qualification
1) The candidate should be Post Graduate in Structure with Graduate in Civil Engineering from 2
‘recognized university
IW understand thatthe essential educational qualification ofS. Bridge Design
'Specialists Graduate in Cl Engincering from a recogrized university and Post
leraduate degree in Structural wil get extra weightage but it isnot essential
|quaification.
se. Bridge Design Specialist
I) General qualification is Engineering graduate (Civil from recognized
|University/institute
i) Essential qualification is Post Graduate degree in Structural Engineering,
54 |e Detaled Evaluation [We request the client to kindly laify the same. Icom recognized UniversityInstitute
(criteria of Sr. Bridge Design |2. General Qualification
Specialist) |) Engineering Graduate (civil) from recognized university ~ 15 marks
Page no. 5 W) Post graduate degree in Structural Engg. from recognized university ~10 marks
iEnclosure-6, [Team Leader cum Sr Bridge Engineer |We undarstand thatthe essential educational qualficalion of Team Leader cum Sr_|Team Leader cum Sr Br. Engineer
‘qualification of key [Bridge Engineer is Graduate in Civil Engineering from a cecognized university |i) General qualification is graduate in Cl Engineering from recognized
personnel, Team Leader {Essential Qualifications and experiences 1)Graduate in Civil Engineering from 3 recognized _ It's also understood that Post graduate degree in Civil Engineer/ Construction _|University/Institute
leum sr. lunversity with post graduate degree in Ci Engineer/ Construction Management/ MBA. [Management/ MBA is preferential qualification, however it will get extra weightage |i Essential qualification is Post Garduate Degree in Structural
ridge Engineer / Page 65. |Preterential Qualification \during evaluation. [ngineering/Construction Management/MBA
55 [& Detailed Evaluation _|1)Post Graduate degree in Civil Engineering 'We request the clint to kindly clarify the same,
(criteria of Team Leader —_|1.General Qualifcation
cum Sr. ) Graduate in Civil Engineering from recognized university ~20 marks
Iaridge Engineer/ I) Post Graduate Degree in Engineering in Civil Engg/Construction management/MBA ~ 5 marks
Page no. 3
56
lannexure - [of Detaled
[evaluation Criteria Se.
[Bridge Design Specialist/
[Page no. 5
ir, Bridge Design Speclalst- SU No. 2 (a) i) Experience as Sr. Bridge Design Specalist/ Resident
[ridge Engineer/ Project Manager or similar capacity in bridge project (design experience)
i